Monthly tour scheduling models with mixed skills considering weekend off requirements

Unlike manufacturing, where standard shifts and days off are the rule, the service industry operates every day of the week across a month and a year. To maintain the morale and productivity of the workers in the service industry, the weekend off requirements, one of the important work preferences for the workers, should be respected and balanced for a longer planning horizon beyond a week. This paper deals with the monthly tour scheduling problem with mixed skills considering the weekend off requirements in contrast to the weekly planning horizon that is typical in most literature. The objective is to obtain the most economical mix of types of workers satisfying the patterns of demands for the workers and desired work characteristics. Two model formulations are developed based on implicit programming techniques. One model uses a general integer programming (GIP) formulation and assigns the lunch break hours aggregately to the workers based on the worker types. The other one adopts a binary integer programming (BIP) formulation and assigns the lunch break hours explicitly to the individual workers. The effectiveness of the two models is illustrated by the numerical tests and the results show that the BIP formulation is more efficient than the GIP formulation.

[1]  Irem Ozkarahan,et al.  An Implicit Goal Programming Model for the Tour Scheduling Problem Considering the Employee Work Preferences , 2004, Ann. Oper. Res..

[2]  T. Aykin Optimal Shift Scheduling with Multiple Break Windows , 1996 .

[3]  James E. Bailey,et al.  Integrated days off and shift personnel scheduling , 1985 .

[4]  John W. Fowler,et al.  Heuristics for workforce planning with worker differences , 2008, Eur. J. Oper. Res..

[5]  R. Tibrewala,et al.  Optimal Scheduiing of Two Consecutive Idle Periods , 1972 .

[6]  X. Cai,et al.  A genetic algorithm for scheduling staff of mixed skills under multi-criteria , 2000, Eur. J. Oper. Res..

[7]  Jonathan F. Bard,et al.  Staff scheduling at the United States Postal Service , 2003, Comput. Oper. Res..

[8]  Hesham K. Alfares Flexible 4-day workweek scheduling with weekend work frequency constraints , 2003 .

[9]  James B. Orlin,et al.  Cyclic Scheduling via Integer Programs with Circular Ones , 1980, Oper. Res..

[10]  Larry W. Jacobs,et al.  Overlapping start-time bands in implicit tour scheduling , 1996 .

[11]  Nicholas Beaumont,et al.  Scheduling staff using mixed integer programming , 1997 .

[12]  Gary M. Thompson Improved implicit optimal modeling of the labor shift scheduling problem , 1995 .

[13]  Kenneth R. Baker,et al.  Workforce Scheduling with Cyclic Demands and Day-Off Constraints , 1977 .

[14]  George B. Dantzig,et al.  Letter to the Editor - A Comment on Edie's "Traffic Delays at Toll Booths" , 1954, Oper. Res..

[15]  Rangarajan Narasimhan An algorithm for single shift scheduling of hierarchical workforce , 1997 .

[16]  Hesham K. Alfares An efficient two-phase algorithm for cyclic days-off scheduling , 1998, Comput. Oper. Res..

[17]  Stephen E. Bechtold,et al.  Implicit modeling of flexible break assignments in optimal shift scheduling , 1990 .

[18]  Aiying Rong,et al.  Shift designs for freight handling personnel at air cargo terminals , 2009 .

[19]  Larry W. Jacobs,et al.  A Simulated Annealing Approach to the Solution of Flexible Labour Scheduling Problems , 1993 .

[20]  Irem Ozkarahan,et al.  Implicit optimal tour scheduling with flexible break assignments , 2003 .

[21]  Kenneth R. Baker,et al.  Workforce Allocation in Cyclical Scheduling Problems: A Survey , 1976 .

[22]  Michael J. Brusco,et al.  Personnel Tour Scheduling When Starting-Time Restrictions Are Present , 1998 .

[23]  Larry W. Jacobs,et al.  Optimal Models for Meal-Break and Start-Time Flexibility in Continuous Tour Scheduling , 2000 .

[24]  Andreas T. Ernst,et al.  Staff scheduling and rostering: A review of applications, methods and models , 2004, Eur. J. Oper. Res..

[25]  Donald F. Rossin,et al.  Sufficient working subsets for the tour scheduling problem , 1991 .

[26]  Gary M. Thompson,et al.  Scheduling workforce relief breaks in advance versus in real-time , 2007, Eur. J. Oper. Res..

[27]  Hamilton Emmons,et al.  Off-Day Scheduling with Hierarchical Worker Categories , 1991, Oper. Res..

[28]  Graham Mills,et al.  Multi-Skilled Workforce Optimisation , 2004, Ann. Oper. Res..

[29]  Michael J. Brusco,et al.  A sequential integer programming method for discontinuous labor tour scheduling , 1996 .

[30]  Jonathan F. Bard,et al.  Solving large-scale tour scheduling problems , 1994 .

[31]  V. Mabert,et al.  A Simulation Analysis of Tour-Shift Construction Procedures , 1982 .

[32]  J. L. Byrne,et al.  Scheduling of Toll Collectors , 1973 .

[33]  Srimathy Mohan,et al.  Scheduling part-time personnel with availability restrictions and preferences to maximize employee satisfaction , 2008, Math. Comput. Model..