Cost-Benefit Analysis for Hydropower Production in Water Distribution Networks by a Pump as Turbine

AbstractThe use of microhydroelectric plants in urban pipe networks, based on the combination of a pump as turbine (PAT), two regulating valves, and two pressure meters, is proposed along with simple automation rules. Its economic benefit is tested on a small pipe network, where the network geometry as well as the demand coefficient variation in time and space have been inferred from previously collected data and existing analysis. A similar analysis has been also carried out for different scenarios in which the reduction of pipe installation cost due to a diameter reduction is compared with the increased benefit in energy production. The case study shows that a small increment of the pipe installation cost, with respect to the minimum required by the nodes minimum pressure, can lead to a larger benefit for energy production.

[1]  Theophilus Gaius-obaseki,et al.  Hydropower opportunities in the water industry. , 2010 .

[2]  Aonghus McNabola,et al.  The technical and economic feasibility of energy recovery in water supply networks , 2011 .

[3]  Thomas Scanlon,et al.  Performance of a centrifugal pump running in inverse mode , 2004 .

[4]  Armando Carravetta,et al.  Banki-Michell Optimal Design by Computational Fluid Dynamics Testing and Hydrodynamic Analysis , 2013 .

[5]  Selami Kara,et al.  Implementation of Hydraulic Modelling for Water-Loss Reduction Through Pressure Management , 2012, Water Resources Management.

[6]  Armando Carravetta,et al.  PAT Design Strategy for Energy Recovery in Water Distribution Networks by Electrical Regulation , 2013 .

[7]  G. La Loggia,et al.  Analysis of the impact of intermittent distribution by modelling the network-filling process , 2011 .

[8]  Helena M. Ramos,et al.  Pumps as turbines: an unconventional solution to energy production , 1999 .

[9]  J N Lester,et al.  Developing a sustainable energy strategy for a water utility. Part II: A review of potential technologies and approaches. , 2002, Journal of environmental management.

[10]  Helena M. Ramos,et al.  Clean power in water supply systems as a sustainable solution: from planning to practical implementation. , 2010 .

[11]  Miguel A. Mariño,et al.  Optimization of Hydropower Plant Integration in Water Supply System , 1990 .

[12]  Maria da Conceição Cunha,et al.  Water Distribution Network Design Optimization: Simulated Annealing Approach , 1999 .

[13]  Nicola Fontana,et al.  Losses Reduction and Energy Production in Water-Distribution Networks , 2012 .

[14]  Armando Carravetta,et al.  Energy Production in Water Distribution Networks: A PAT Design Strategy , 2012, Water Resources Management.

[15]  Mohammad Karamouz,et al.  Pressure Management Model for Urban Water Distribution Networks , 2010 .

[16]  Helena M. Ramos,et al.  Environmentally friendly hybrid solutions to improve the energy and hydraulic efficiency in water supply systems , 2011 .

[17]  A. Criminisi,et al.  Leak Analysis in Pipeline Systems by Means of Optimal Valve Regulation , 1999 .

[18]  Helena M. Ramos,et al.  Pressure Control for Leakage Minimisation in Water Distribution Systems Management , 2006 .

[19]  Kamaruzzaman Sopian,et al.  Pico hydro: Clean power from small streams , 2009 .

[20]  Bryan W. Karney,et al.  Life-cycle energy analysis of a water distribution system , 2004 .

[21]  Oliver Paish,et al.  Small hydro power: technology and current status , 2002 .

[22]  Elena Luchinskaya,et al.  The costs of small-scale hydro power production: Impact on the development of existing potential , 2010 .

[23]  Giovanni Maria Sechi,et al.  Location and Calibration of Valves in Water Distribution Networks Using a Scatter-Search Meta-heuristic Approach , 2009 .

[24]  Thomas M. Walski,et al.  Modeling leakage reduction through pressure control , 2006 .

[25]  Sourabh Khurana,et al.  Small Hydro Power- A review , 2011 .

[26]  Enrique Cabrera,et al.  Leakage Assessment through Water Distribution Network Simulation , 2005 .

[27]  Armando Carravetta,et al.  CFD and comparisons for a pump as turbine: Mesh reliability and performance concerns , 2011 .

[28]  Mariano Arriaga,et al.  Pump as turbine – A pico-hydro alternative in Lao People's Democratic Republic , 2010 .

[29]  A. Carravetta,et al.  Numerical simulation on pump as turbine: Mesh reliability and performance concerns , 2011, 2011 International Conference on Clean Electrical Power (ICCEP).

[30]  A. A. Fiuzat,et al.  Power Outputs of Two Stages of Cross‐Flow Turbine , 1991 .

[31]  Simon L. Prescott,et al.  Improved Control of Pressure Reducing Valves in Water Distribution Networks , 2008 .

[32]  Slobodan P. Simonovic,et al.  Optimization of Water Distribution Network Design Using Differential Evolution , 2010 .

[33]  T. Devi Prasad,et al.  Multiobjective Genetic Algorithms for Design of Water Distribution Networks , 2004 .

[34]  Petras Punys,et al.  Tools for Small Hydropower Plant Resource Planning and Development: A Review of Technology and Applications , 2011 .

[35]  K. Vairavamoorthy,et al.  Leakage Reduction in Water Distribution Systems: Optimal Valve Control , 1998 .

[36]  N. M. Aziz,et al.  An experimental investigation of cross-flow turbine efficiency , 1994 .