Abstract With the fast development of the world economy, distributed virtual manufacturing is becoming increasingly important since it can respond rapidly to market changes and make resource sharing more efficient among manufacturing partners. In this environment, partners may be located at different geographical locations, and co-operation among partners is a vital task and thus concurrent planning and scheduling has become a challenging research topic. This paper presents a computerized model that can integrate these manufacturing functions and resolve some of the critical problems in distributed virtual manufacturing, such as virtual cooperation, optimal partner selection, etc. This integration model is realized through a multi-agent approach that provides a practical approach for software integration in a distributed environment. A cost function is proposed and adopted for optimal partner selection in a virtual enterprise, which not only considers a partner's manufacturing capability and process requirements, but also the processing time, partner's location and product due date. Through establishing a virtual manufacturing model in a simulated environment, the proposal was validated with a case study. It shows that the proposed methodology can satisfy the distribution and agility requirements. This approach is able to contribute to the reduction of product cost, improving product quality and shortening lead time, compared to the sequential approach in the normal engineering and production practice.
[1]
E. Lesch.
Bridge the gap.
,
1984,
Journal of nephrology nursing.
[2]
Srinidhi Mallur,et al.
Introduction to an integrated process planning model
,
1992
.
[3]
Kazuaki Iwata,et al.
Development of a Virtual Manufacturing System by Integrating Product Models and Factory Models
,
1993
.
[4]
T. W. Liao,et al.
Modification of CAPP systems for CAPP/scheduling integration
,
1993
.
[5]
M. Eugene Merchant,et al.
IPPM – A Prototype to Integrate Process Planning and Job Shop Scheduling Functions
,
1993
.
[6]
Hong-Chao Zhang,et al.
An integrated model of process planning and production scheduling
,
1994
.
[7]
Samuel H. Huang,et al.
A progressive approach for the integration of process planning and scheduling
,
1995
.
[8]
H.J.J. Kals,et al.
The integration of process planning and shop floor scheduling in small batch part manufacturing
,
1995
.
[9]
A. G. Mamalis,et al.
On-line integration of a process planning module with production scheduling
,
1996
.
[10]
Kazuaki Iwata,et al.
Virtual Manufacturing Systems as Advanced Information Infrastructure for Integrating Manufacturing Resources and Activities
,
1997
.
[11]
Sang Do Noh,et al.
Virtual Manufacturing System—a Test-Bed of Engineering Activities
,
1997
.