MATERIAL TRANSSHIPMENT FOR PRECAST FABRICATION

Abstract Materials required for precast fabrication are dissimilar to those cast at construction sites. Fabricators who lack materials must wait until specific suppliers deliver the required materials. The objective of this study is to reduce total material management costs in the supply chain system through the most advantageous transshipment strategies. A material supply chain framework that enables fabricators to implement lateral transshipment is first proposed. Transshipment strategies are then formulated into a mathematical model. The most advantageous transshipment strategies are analyzed using computer simulation. Diverse order lead times, demands, transportation costs, and shortage costs are simulated to approximate operational conditions encountered in supply chain systems. Through various experiments, the most advantageous strategy for precast fabrication industry can be found. In addition, four rules are developed based on simulation results to enhance transshipment decision making. This resea...

[1]  M. Tzur,et al.  The dynamic transshipment problem , 2001 .

[2]  Chien-Ho Ko,et al.  Buffer Evaluation for Demand Variability Using Fuzzy Logic , 2006 .

[3]  David F. Pyke,et al.  Inventory management and production planning and scheduling , 1998 .

[4]  Strategy Analysis of Lateral Transshipment for Material Risk Pooling , 2014 .

[5]  Chien-Ho Ko,et al.  An integrated framework for reducing precast fabrication inventory , 2010 .

[6]  Mauro Gamberi,et al.  An integrated approach to the design and management of a supply chain system , 2008 .

[7]  Chien-Ho KoC.H. Ko,et al.  Production control in precast fabrication: considering demand variability in production schedules , 2011 .

[8]  T. Ula,et al.  Identification of Periodic Moving-Average Models , 2003 .

[9]  Chien-Ho Ko,et al.  Precast production scheduling using multi-objective genetic algorithms , 2011, Expert Syst. Appl..

[10]  Murali Sambasivan,et al.  Causes and effects of delays in Malaysian construction industry , 2007 .

[11]  Nader Azad,et al.  Designing a Supply Chain Network Model with Uncertain Demands and Lead Times , 2009 .

[12]  Joseph H. M. Tah,et al.  Towards a framework for project risk knowledge management in the construction supply chain , 2001 .

[13]  Stuart D. Anderson,et al.  Relative Effectiveness of Project Delivery and Contract Strategies , 2006 .

[14]  Sven Axsäter,et al.  Simple Solution Procedures for a Class of Two-Echelon Inventory Problems , 1990, Oper. Res..

[15]  Bonsang Koo,et al.  Formulation of a pull production system for optimal inventory control of temporary rebar assembly plants , 2009 .

[16]  Frank P Blakemore,et al.  Design–Build Replacement of US-90 Bridge over Bay St. Louis, Mississippi , 2010 .

[17]  L. Fredendall,et al.  Basics of Supply Chain Management , 2000 .

[18]  Jung Woo Jung,et al.  An effective lateral transshipment policy to improve service level in the supply chain , 2007 .

[19]  R. Cooper Perspective third-generation new product processes , 1994 .

[20]  A. Banerjee,et al.  A simulation study of lateral shipments in single supplier, multiple buyers supply chain networks , 2003 .

[21]  W. Roberts,et al.  BULK MATERIALS HANDLING IN THE MINING INDUSTRY , 2006 .

[22]  Avijit Banerjee,et al.  Cost-parametric analysis of lateral transshipment policies in two-echelon supply chains , 2005 .

[23]  K. T. Yeo,et al.  Integrating supply chain and critical chain concepts in engineer-procure-construct (EPC) projects , 2002 .

[24]  William Et.Al Hines,et al.  Probability and Statistics in Engineering , 2003 .

[25]  Sven Axsäter,et al.  A simple procedure for determining order quantities under a fill rate constraint and normally distributed lead-time demand , 2006, Eur. J. Oper. Res..

[26]  M. Vlachopoulou,et al.  Integrating supply chain operations in the internet era , 2007 .

[27]  Sven Axsäter,et al.  Modelling Emergency Lateral Transshipments in Inventory Systems , 1990 .

[28]  Füsun Ülengin,et al.  Coordination in a two-stage capacitated supply chain with multiple suppliers , 2011, Eur. J. Oper. Res..

[29]  Charles W. Dolan,et al.  Precast Concrete building system components for the Westin resort hotel, part 2: Design and construction , 2009 .

[30]  L. Saunders TOWARDS A FRAMEWORK , 1999 .

[31]  David Frederick Ross,et al.  Competing Through Supply Chain Management , 1998 .

[32]  Yale T. Herer,et al.  Optimal and heuristic algorithms for the multi-location dynamic transshipment problem with fixed transshipment costs , 2003 .

[33]  Wallace J. Hopp,et al.  Factory physics : foundations of manufacturing management , 1996 .

[34]  A. Standen Causes and Effects. , 1957, Science.

[35]  F. Robert Jacobs,et al.  MANUFACTURING PLANNING AND CONTROL SYSTEMS FOR SUPPLY CHAIN MANAGEMENT , 2004 .

[36]  George Tagaras,et al.  Pooling in multi-location periodic inventory distribution systems , 1999 .