Constraint Propagation and Decomposition Techniques for Highly Disjunctive and Highly Cumulative Project Scheduling Problems
暂无分享,去创建一个
[1] James H. Patterson,et al. A Comparison of Exact Approaches for Solving the Multiple Constrained Resource, Project Scheduling Problem , 1984 .
[2] Peter Brucker,et al. A branch and bound algorithm for the resource-constrained project scheduling problem , 1998, Eur. J. Oper. Res..
[3] Claude Le Pape,et al. Implementation of resource constraints in ILOG SCHEDULE: a library for the development of constraint-based scheduling systems , 1994 .
[4] Yves Colombani. Constraint Programming: an Efficient and Practical Approach to Solving the Job-Shop Problem , 1996, CP.
[5] Wpm Wim Nuijten,et al. Time and resource constrained scheduling : a constraint satisfaction approach , 1994 .
[6] Philippe Baptiste,et al. A Theoretical and Experimental Comparison of Constraint Propagation Techniques for Disjunctive Scheduling , 1995, IJCAI.
[7] William J. Cook,et al. A Computational Study of the Job-Shop Scheduling Problem , 1991, INFORMS Journal on Computing.
[8] Olivier Lhomme,et al. Consistency Techniques for Numeric CSPs , 1993, IJCAI.
[9] David S. Johnson,et al. Computers and Intractability: A Guide to the Theory of NP-Completeness , 1978 .
[10] Eric Pinson,et al. Jackson's Pseudo Preemptive Schedule for the Pm/ri, qi/Cmax scheduling problem , 1998, Ann. Oper. Res..
[11] Nicolas Beldiceanu,et al. Extending CHIP in order to solve complex scheduling and placement problems , 1993, JFPL.
[12] J. Carlier,et al. Une méthode arborescente pour résoudre les problèmes cumulatifs , 1991 .
[13] Philippe Baptiste,et al. Constraint Propagation Techniques for Disjunctive Scheduling: The Preemptive Case , 1996, ECAI.
[14] Eric Pinson,et al. A Practical Use of Jackson''s Preemptive Schedule for Solving the Job-Shop Problem. Annals of Opera , 1991 .
[15] François Laburthe,et al. Cumulative Scheduling with Task Intervals , 1996, JICSLP.
[16] Michel Minoux,et al. Graphs and Algorithms , 1984 .
[17] Amedeo Cesta,et al. Gaining efficiency and flexibility in the simple temporal problem , 1996, Proceedings Third International Workshop on Temporal Representation and Reasoning (TIME '96).
[18] François Laburthe,et al. Improved CLP Scheduling with Task Intervals , 1994, ICLP.
[19] Rainer Kolisch,et al. Characterization and generation of a general class of resource-constrained project scheduling problems , 1995 .
[20] A. A. Mastor,et al. An Experimental Investigation and Comparative Evaluation of Production Line Balancing Techniques , 1970 .
[21] Erik Demeulemeester,et al. A branch-and-bound procedure for the multiple resource-constrained project scheduling problem , 1992 .
[22] Willy Herroelen,et al. Assembly line balancing by resource-constrained project scheduling techniques - A critical appraisal , 1996 .
[23] J. Erschler,et al. Ordonnancement de tâches sous contraintes: une approche énergetique , 1992 .