Speeding up a Rollout algorithm for complex parallel machine scheduling
暂无分享,去创建一个
[1] J. R. Jackson. SCHEDULING A PRODUCTION LINE TO MINIMIZE MAXIMUM TARDINESS , 1955 .
[2] E.L. Lawler,et al. Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey , 1977 .
[3] T.C.E. Cheng,et al. A state-of-the-art review of parallel-machine scheduling research , 1990 .
[4] Christopher S. Tang. Scheduling batches on parallel machines with major and minor set-ups , 1990 .
[5] Fred W. Glover,et al. A user's guide to tabu search , 1993, Ann. Oper. Res..
[6] Stefan Voß,et al. Steiner Tree Heuristics — A Survey , 1994 .
[7] Reha Uzsoy,et al. Decomposition Methods for Complex Factory Scheduling Problems , 1996 .
[8] John N. Tsitsiklis,et al. Rollout Algorithms for Combinatorial Optimization , 1997, J. Heuristics.
[9] Michael Pinedo,et al. Scheduling jobs on parallel machines with sequence-dependent setup times , 1997, Eur. J. Oper. Res..
[10] Cees Duin,et al. The pilot method: A strategy for heuristic repetition with application to the Steiner problem in graphs , 1999, Networks.
[11] D. Atkin. OR scheduling algorithms. , 2000, Anesthesiology.
[12] Jean-Charles Billaut,et al. Multicriteria scheduling , 2005, Eur. J. Oper. Res..
[13] Roberto Musmanno,et al. New Rollout Algorithms for Combinatorial Optimization Problems , 2002, Optim. Methods Softw..
[14] S. Voß,et al. Look Ahead Features in Metaheuristics , 2003 .
[15] Dario Pacciarelli,et al. A New Class of Greedy Heuristics for Job Shop Scheduling Problems , 2003, WEA.
[16] Krishna R. Pattipati,et al. Rollout strategies for sequential fault diagnosis , 2003, IEEE Trans. Syst. Man Cybern. Part A.
[17] Nicola Secomandi,et al. Analysis of a Rollout Approach to Sequencing Problems with Stochastic Routing Applications , 2003, J. Heuristics.
[18] Dario Pacciarelli,et al. A Rollout Metaheuristic for Job Shop Scheduling Problems , 2004, Ann. Oper. Res..
[19] Cees Duin,et al. Looking Ahead with the Pilot Method , 2005, Ann. Oper. Res..
[20] Francesca Guerriero,et al. Parallelization Strategies for Rollout Algorithms , 2005, Comput. Optim. Appl..
[21] Hlynur Stefansson,et al. Multiscale planning and scheduling in the secondary pharmaceutical industry , 2006 .
[22] Paola Festa,et al. A new meta-heuristic for the Bus Driver Scheduling Problem: GRASP combined with Rollout , 2007, 2007 IEEE Symposium on Computational Intelligence in Scheduling.
[23] Paolo Detti,et al. Minimizing and balancing setups in a serial production system , 2007 .
[24] Francis Sourd,et al. Search tree based approaches for parallel machine scheduling , 2008, Comput. Oper. Res..
[25] S. Raghavan,et al. The prize-collecting generalized minimum spanning tree problem , 2008, J. Heuristics.
[26] Carlo Meloni,et al. Scheduling dispensing and counting in secondary pharmaceutical manufacturing , 2009 .
[27] D. Pacciarelli,et al. Models and Methods for Production Scheduling in the Pharmaceutical Industry , 2011 .
[28] Dimitri P. Bertsekas,et al. Rollout Algorithms for Discrete Optimization: A Survey , 2012 .
[29] Luca Bertazzi. Minimum and Worst-Case Performance Ratios of Rollout Algorithms , 2012, J. Optim. Theory Appl..
[30] Rakesh Nagi,et al. Identical parallel machine scheduling to minimise makespan and total weighted completion time: a column generation approach , 2013 .
[31] Rakesh Nagi,et al. Solving assembly scheduling problems with tree-structure precedence constraints: A Lagrangian relaxation approach , 2013, IEEE Transactions on Automation Science and Engineering.
[32] Carlo Meloni,et al. Minimising general setup costs in a two-stage production system , 2013 .
[33] Ali Allahverdi,et al. The third comprehensive survey on scheduling problems with setup times/costs , 2015, Eur. J. Oper. Res..
[34] Patrick Jaillet,et al. Average-Case Performance of Rollout Algorithms for Knapsack Problems , 2013, Journal of Optimization Theory and Applications.
[35] D. J. van der Zee,et al. Family-based dispatching with parallel machines , 2015 .