Analyzing Integrated Cost-Schedule Risk for Complex Product Systems R&D Projects

The vast majority of the research efforts in project risk management tend to assess cost risk and schedule risk independently. However, project cost and time are related in reality and the relationship between them should be analyzed directly. We propose an integrated cost and schedule risk assessment model for complex product systems R&D projects. Graphical evaluation review technique (GERT), Monte Carlo simulation, and probability distribution theory are utilized to establish the model. In addition, statistical analysis and regression analysis techniques are employed to analyze simulation outputs. Finally, a complex product systems R&D project as an example is modeled by the proposed approach and the simulation outputs are analyzed to illustrate the effectiveness of the risk assessment model. It seems that integrating cost and schedule risk assessment can provide more reliable risk estimation results.

[1]  W. Edward Back,et al.  Multiple Simulation Analysis for Probabilistic Cost and Schedule Integration , 2002 .

[2]  K. Yeo,et al.  RESEARCH CHALLENGES ON COMPLEX PRODUCT SYSTEMS (CoPS) INNOVATION , 2006 .

[3]  Joseph H. M. Tah,et al.  Integrated duration–cost influence network for modelling risk impacts on construction tasks , 2006 .

[4]  W. Edward Back,et al.  Probabilistic Monitoring of Project Performance Using SS-Curves , 2000 .

[5]  Kenzo Kurihara,et al.  Efficient Monte Carlo simulation method of GERT-type network for project management , 2002 .

[6]  Osama Abudayyeh,et al.  Cost‐ and Schedule‐Control Integration: Issues and Needs , 1991 .

[7]  Robert I. Carr COST, SCHEDULE, AND TIME VARIANCES AND INTEGRATION , 1993 .

[8]  Keith C. Crandall,et al.  Schedule Development under Stochastic Scheduling , 1982 .

[9]  Wang Yang-qing Confidence Percentile Estimation to Cost and Schedule Integration Based on Monte Carlo Multiple Simulation Analysis Technique , 2006 .

[10]  Magnus Larson,et al.  Forced and self-organized shoreline response for a beach in the southern Baltic Sea determined through singular spectrum analysis , 2001 .

[11]  W. Edward Back,et al.  PROBABILISTIC FORECASTING OF PROJECT PERFORMANCE USING STOCHASTIC S CURVES , 2004 .

[12]  W. Edward Back,et al.  Probabilistic Optimal-Cost Scheduling , 2001 .

[13]  Guru N. Rao,et al.  Integrated Analysis of Cost Risk and Schedule Risk , 1995 .

[14]  S. Rahman Reliability Engineering and System Safety , 2011 .

[15]  Karen Lee Hansen,et al.  Hotspots in complex product systems: emerging issues in innovation management , 1998 .

[16]  Don T. Phillips,et al.  GERT network analysis of complex production systems , 1975 .

[17]  Martin G. Moehrle,et al.  Risk and uncertainty in R&D management , 2008 .

[18]  P. Sen,et al.  An integrated probabilistic risk analysis decision support methodology for systems with multiple state variables , 1999 .

[19]  B. W. Taylor,et al.  R&D Project Planning with Q-GERT Network Modeling and Simulation , 1980 .

[20]  James E. Diekmann Probabilistic Estimating: Mathematics and Applications , 1983 .

[21]  Siamak Noori,et al.  An Integrated Methodology for Assessment and Selection of the Project Risk Response Actions , 2009, Risk analysis : an official publication of the Society for Risk Analysis.

[22]  M. Hobday Product complexity, innovation and industrial organisation , 1998 .

[23]  Hyun-Soo Lee,et al.  Application of Mathematical Matrix to Integrate Project Schedule and Cost , 1999 .