Comparison of the Weibull and the Crow-AMSAA Model in Prediction of Early Cable Joint Failures
暂无分享,去创建一个
Yang Yang | Chengke Zhou | Wenjun Zhou | Jiankang Zhao | Zeyang Tang | Dajiang Wang | Leiqi Zhang | Haizhi Liu | Chengke Zhou | Wenjun Zhou | Jiankang Zhao | Leiqi Zhang | Zeyang Tang | Yang Yang | Dajiang Wang | Haizhi Liu
[1] Yazhou Jia,et al. Early failure analysis of machining centers: a case study , 2001, Reliab. Eng. Syst. Saf..
[2] R. V. Rebbapragada,et al. Failure prediction of underground distribution feeder cables , 1994 .
[3] Matthieu Michel,et al. On-line partial discharge monitoring in medium voltage underground cables , 2009 .
[4] JYancy Gill. Forecasting Underground Electric Cable Faults Using the Crow-AMSAA Model , 2011 .
[5] S. A. Hossain,et al. Estimating the parameters of a non-homogeneous Poisson-process model for software reliability , 1993 .
[6] Li Hua. Fault Analysis for 110 kV and the Above HV Cross - Linking Cable System , 2004 .
[7] Larry H. Crow,et al. Reliability growth estimation with missing data. II , 1988, 1988. Proceedings., Annual Reliability and Maintainability Symposium,.
[8] Peter C. Kiessler,et al. A critical look at the bathtub curve , 2003, IEEE Trans. Reliab..
[9] W. Weibull. A statistical theory of the strength of materials , 1939 .
[10] Y Gill,et al. Development of an electrical cable replacement simulation model to aid with the management of aging underground electric cables , 2011, IEEE Electrical Insulation Magazine.
[11] Wayne Nelson,et al. Applied life data analysis , 1983 .
[12] Paul Barringer. Predict Failures: Crow-AMSAA 101 and Weibull 101 , 2004 .
[13] Ye Hui-sheng. Analysis on Breakdown of Main Insulation on Middle Joint of 220 kV Power Cable , 2009 .