Simulated Annealing-Based Embedded Meta-Heuristic Approach to Solve Bi-objective Robust Stochastic Sustainable Cellular Layout

The increase in competitiveness and environmental challenges drive manufacturing industry to change in layout frequently. Moreover, due to environmental challenges, use of scarce resources like electrical energy consumption (EEC) is a major issue. To tackle these rapidly changing conditions, a layout must be efficient and effective. This work proposes a bi-objective robust stochastic sustainable cellular facility layout mathematical model and embedded meta-heuristic to solve it. The proposed model simultaneously minimizes material handling cost for both inter/intra-cellular movement and EEC in cellular manufacturing systems. In today’s sensitive market, demand fluctuates very frequently, so a layout must be robust so that it can tackle all these market fluctuations. To cure the problem, robust facility layout has been designed and solved using simulated annealing (SA)-based embedded meta-heuristic. To show the validity of proposed SA-based embedded meta-heuristic, twenty-five data instances have been used and solved.

[1]  Boppana V. Chowdary,et al.  Configuration Flexibility in Virtual Cellular System , 2009 .

[2]  Sunderesh S. Heragu,et al.  Knowledge based approach to machine cell layout , 1989 .

[3]  Amit Rai Dixit,et al.  Cell formation considering real-life production parameters , 2010, Int. J. Manuf. Technol. Manag..

[4]  Neil Brown,et al.  An advanced energy management framework to promote energy awareness , 2013 .

[5]  C. D. Gelatt,et al.  Optimization by Simulated Annealing , 1983, Science.

[6]  Maghsud Solimanpur,et al.  Applying simulated annealing for designing cellular manufacturing systems using MDmTSP , 2010, Comput. Ind. Eng..

[7]  Reza Tavakkoli-Moghaddam,et al.  A robust optimization approach for an integrated dynamic cellular manufacturing system and production planning with unreliable machines , 2016 .

[8]  Yeong-Dae Kim,et al.  A systematic procedure for setting parameters in simulated annealing algorithms , 1998, Comput. Oper. Res..

[9]  Linfeng Zhao Electric Power Steering Application Based on Returnability and Handiness , 2009 .

[10]  Felix T.S. Chan,et al.  Two-stage approach for machine-part grouping and cell layout problems , 2006 .

[11]  Mohammad Mahdi Paydar,et al.  A Simulated Annealing for Intra-Cell Layout Design of Dynamic Cellular manufacturing Systems with Route Selection, purchasing Machines and Cell Reconfiguration , 2013, Asia Pac. J. Oper. Res..

[12]  Jan Karel Lenstra,et al.  Job Shop Scheduling by Simulated Annealing , 1992, Oper. Res..

[13]  Divakar Rajamani,et al.  Cellular Manufacturing Systems , 1996 .

[14]  Detlef Gerhard,et al.  Towards Energy Management in Production Planning Software Based on Energy Consumption as a Planning Resource , 2015 .

[15]  M. Bagheri,et al.  A new mathematical model towards the integration of cell formation with operator assignment and inter-cell layout problems in a dynamic environment , 2014 .

[16]  Kuldip Singh Sangwan,et al.  An intelligent hybrid model for the integrated design of cellular manufacturing systems , 2011 .

[17]  S M Moatar Hosseini,et al.  A SIMULATED ANNEALING SOLVING FOR FACILITY LAYOUT PROBLEMS UNDER VARIABLE DEMAND IN CELLULAR MANUFACTURING SYSTEM , 2005 .

[18]  Wantao Yu,et al.  An empirical examination of stakeholder pressures, green operations practices and environmental performance , 2015 .

[19]  Ahmad Makui,et al.  A novel approach to determine cell formation, intracellular machine layout and cell layout in the CMS problem based on TOPSIS method , 2009, Comput. Oper. Res..

[20]  Divakar Rajamani,et al.  Cellular Manufacturing Systems Design, Planning and Control , 1996 .

[21]  Yi Xu,et al.  Designing multi-product lines: job routing in cellular manufacturing systems , 2000 .

[22]  Fariborz Jolai,et al.  A variable neighborhood binary particle swarm algorithm for cell layout problem , 2011 .

[23]  Attahiru Sule Alfa,et al.  Integrating the grouping and layout problems in cellular manufacturing systems , 1992 .

[24]  Joseph Sarkis,et al.  Greener manufacturing and operations : from design to delivery and back /ed. by Joseph Sarkis , 2002 .

[25]  Massoud Bazargan-Lari,et al.  Layout designs in cellular manufacturing , 1999, Eur. J. Oper. Res..

[26]  Napsiah Ismail,et al.  Design of a facility layout model in hybrid cellular manufacturing systems under variable demand , 2011 .

[27]  L. V. Wassenhove,et al.  Sustainable Operations Management , 2005 .

[28]  Wilson L. Price,et al.  Hybrid genetic approach for solving large-scale capacitated cell formation problems with multiple routings , 2006, Eur. J. Oper. Res..

[29]  Kuei-Bin Wu,et al.  An improved simulated annealing for facility layout problems in cellular manufacturing systems , 1998 .

[30]  George Harhalakis,et al.  CLASS: Computerized LAyout Solutions using Simulated annealing , 1992 .

[31]  Ahmed Azab,et al.  A Novel Bi-level Continuous Formulation for the Cellular Manufacturing System Facility Layout Problem , 2015 .

[32]  Emile H. L. Aarts,et al.  A pedestrian review of the theory and application of the simulated annealing algorithm , 1987 .

[33]  Amir Azaron,et al.  Solving a dynamic cell formation problem using metaheuristics , 2005, Appl. Math. Comput..

[34]  Surya Prakash Singh,et al.  A similarity score-based two-phase heuristic approach to solve the dynamic cellular facility layout for manufacturing systems , 2017 .

[35]  Esmaeil Mehdizadeh,et al.  An integrated mathematical model for solving dynamic cell formation problem considering operator assignment and inter/intra cell layouts , 2016, Appl. Soft Comput..

[36]  Surya Prakash Singh,et al.  Designing Flexible Stochastic Dynamic Layout: An Integrated Firefly and Chaotic Simulated Annealing-Based Approach , 2017 .

[37]  David Connolly An improved annealing scheme for the QAP , 1990 .

[38]  Mahesh Gupta,et al.  Environmental management and its impact on the operations function , 1995 .

[39]  Reza Tavakkoli-Moghaddam,et al.  An Electromagnetism-like algorithm for cell formation and layout problem , 2012, Expert Syst. Appl..

[40]  Garret E. O’Donnell,et al.  Industrial power and energy metering – a state-of-the-art review , 2013 .

[41]  Stefan Spinler,et al.  OM Forum - Sustainable Operations Management: An Enduring Stream or a Passing Fancy? , 2013, Manuf. Serv. Oper. Manag..

[42]  Surya Prakash Singh,et al.  Modeling Flexible Supplier Selection Framework , 2014 .

[43]  Yunfeng Wang,et al.  A genetic algorithm for cellular manufacturing design and layout , 2007, Eur. J. Oper. Res..

[44]  Lixin Tang,et al.  A hybrid approach of ordinal optimization and iterated local search for manufacturing cell formation , 2009 .

[45]  Ana María Mejías Sacaluga,et al.  Best Practices in Sustainable Supply Chain Management: A Literature Review , 2014 .

[46]  Alistair I. Mees,et al.  Convergence of an annealing algorithm , 1986, Math. Program..

[47]  Mohammed Ali,et al.  Performance Evaluation of Flexible Manufacturing System Under Different Material Handling Strategies , 2016 .

[48]  Yong Yin,et al.  A heuristic algorithm for cell formation problems with consideration of multiple production factors , 2010 .

[49]  Surya Prakash Singh,et al.  Analysis of simulated annealing cooling schemas for design of optimal flexible layout under uncertain dynamic product demand , 2019 .

[50]  Reza Tavakkoli-Moghaddam,et al.  Design of a facility layout problem in cellular manufacturing systems with stochastic demands , 2007, Appl. Math. Comput..

[51]  Marc Lambrecht,et al.  Network and contract optimization for maintenance services with remanufacturing , 2015, Comput. Oper. Res..

[52]  Urban Wemmerlöv,et al.  CELLULAR MANUFACTURING AT 46 USER PLANTS : IMPLEMENTATION EXPERIENCES AND PERFORMANCE IMPROVEMENTS , 1997 .

[53]  Reza Tavakkoli-Moghaddam,et al.  Solving a group layout design model of a dynamic cellular manufacturing system with alternative process routings, lot splitting and flexible reconfiguration by simulated annealing , 2012, Comput. Oper. Res..

[54]  M. Selim Akturk,et al.  Cellular manufacturing system design using a holonistic approach , 2000 .

[55]  Rémy Glardon,et al.  An Integer Linear Program for Integrated Supplier Selection: A Sustainable Flexible Framework , 2016 .