ANN-based Structural Performance Model for Reliable Bridge Asset Management
暂无分享,去创建一个
Yew-Chaye Loo | Jaeho Lee | Hong Guan | Michael Blumenstein | Jung Baeg Son | M. Blumenstein | Jaeho Lee | H. Guan | Y. Loo | J. Son
[1] Mehdi Khashei,et al. Improvement of Auto-Regressive Integrated Moving Average models using Fuzzy logic and Artificial Neural Networks (ANNs) , 2009, Neurocomputing.
[2] Gwilym M. Jenkins,et al. Time series analysis, forecasting and control , 1972 .
[3] Yew-Chaye Loo,et al. Improving the reliability of a Bridge Management System (BMS) using an ANN-based Backward Prediction Model (BPM) , 2008 .
[4] Wei-Zhen Lu,et al. Using Time-Delay Neural Network Combined with Genetic Algorithms to Predict Runoff Level of Linshan Watershed, Sichuan, China , 2007 .
[5] Seymour Geisser,et al. 8. Predictive Inference: An Introduction , 1995 .
[6] Ming Rao,et al. An on-line wastewater quality predication system based on a time-delay neural network , 1998 .
[7] Andrew Kusiak,et al. Selection and validation of predictive regression and neural network models based on designed experiments , 2006 .
[8] Geoffrey E. Hinton,et al. Phoneme recognition using time-delay neural networks , 1989, IEEE Trans. Acoust. Speech Signal Process..
[9] Pawan Lingras,et al. Short-term traffic prediction on different types of roads with genetically designed regression and time delay neural network models , 2005 .
[10] E Czepiel. BRIDGE MANAGEMENT SYSTEMS LITERATURE REVIEW AND SEARCH , 1995 .
[11] E. Ziegel. Forecasting and Time Series: An Applied Approach , 2000 .
[12] George Morcous,et al. Modeling Bridge Deterioration Using Case-Based Reasoning , 2002 .
[13] Nowrouz Kohzadi,et al. A comparison of artificial neural network and time series models for forecasting commodity prices , 1996, Neurocomputing.