Technology Research on Traffic Organization of Wuhan Municipal Engineering Projects Under Construction
暂无分享,去创建一个
Present Chinese big cities are facing one common problem that road resources have being occupied by the construction of traffic projects. In order to solve the problems of traffic organization during construction properly, this paper put forward the research content and technical principle of municipal engineering projects traffic organization firstly, then suggest a method of traffic organization for viaduct according to the characteristics of the construction period that is divided into three stages (pipelines reconstruction renovation, substructure construction and superstructure construction), which was applied to Traffic organization scheme for construction period of Wuhan Road in Hankou, and it has achieved desired effect. Refer to traffic organization of Wuhan municipal projects under construction, other types of construction projects can be elevated to organize traffic reasonably and keep city traffic common operation, with the consideration of the project characteristics and the actual situation of traffic during construction. Keywords-municipal engineering projects ; under construction ; traffic organization ; traffic impact analysis ; Wuhan city.
[1] Yang Qing-xiang. Operative Methods for Traffic Organization during Engineering Construction , 2008 .
[2] Zhou Xiao-guan. Traffic Organization During Urban Road Constructions , 2015 .
[3] Zhang Weihua. Methods for determining traffic impact area during the construction period of the road , 2011 .