적정 전원 구성에 관한 연구 - 비전 2030

This paper proposes a fuzzy linear programming based solution approach for the long-term generation mix with multi-stages (years) considering air pollution constraints on CO₂, emissions, under uncertain circumstances as like as ambiguities of budget and reliability criterion level. This paper approaches to generation mix problem for 2030 year in Korea eventually. The proposed approach may give more flexible solution rather than too robust plan. The effectiveness of the proposed approach is demonstrated by applying it to solve the multi-years best generation mix problem on the Korea power system which contains nuclear, coal, LNG, oil and pumped-storage hydro plants.