Hierarchical and Dynamic Production Control in Flexible Manufacturing Systems
暂无分享,去创建一个
[1] Kathryn E. Stecke,et al. Design, planning, scheduling, and control problems of flexible manufacturing systems , 1985 .
[2] G. Kallel,et al. Conduite décentralisée coordonnée d'atelier , 1985 .
[3] J. C. Gentina,et al. Real-time piloting of flexible manufacturing systems , 1994 .
[4] J. C. Gentina,et al. Dynamic Operations Control in Flexible Manufacturing Systems (FMS) , 1994 .
[5] B. Bhargava,et al. Information system architecture for heterarchial control of large FMSs , 1993 .
[6] M. I. Dessouky,et al. The One-Machine Sequencing Problem with Early Starts and Due Dates , 1972 .
[7] Chengbin Chu. Nouvelles approches analytiques et concept de mémoire artificielle pour divers problèmes d'ordonnancement. (New analytic approaches and concept of artificial memory for a number of scheduling problems) , 1990 .