Planning is an essential function of project management. Yet, many small- and medium-sized contractors do a relatively poor job of operational planning. Better prebid plans will reduce costs, shorten schedules, and improve labor productivity. Unfortunately, the published literature offers little guidance for smaller contractors on what constitutes effective planning. Most papers describe planning as a macrolevel process for owners. Most emphasize scope definition for industrial projects. This paper describes a microlevel planning process for contractors. It consists of eight steps which are: (1) assess contract risks; (2) develop a preliminary execution plan; (3) develop site layout plans; (4) identify the sequences that are essential-to-success; (5) develop detailed operational plans; (6) develop proactive strategies to assure construction input into design; (7) revise the preliminary plan; and (8) communicate and enforce the plan. The entire process is illustrated with a case study project and is fully illustrated with figures which show how to integrate the work of multiple contractors, keep key resources (crews or equipment) fully engaged with no downtime, provide time buffers so the work of follow on crews can be efficiently done, expedite the schedule using multiple work stations and concurrent work, ways to communicate the work plan to the superintendent and foremen, and how to assess the feasibility of various work methods. The steps are easy to understand and implement. They will yield immediate positive results.
[1]
G. Edward Gibson,et al.
What is preproject planning, anyway?
,
2006
.
[2]
Olusegun O. Faniran,et al.
INTERACTIONS BETWEEN CONSTRUCTION PLANNING AND INFLUENCE FACTORS
,
1998
.
[3]
G. E. Gibson,et al.
Preproject-Planning Process for Capital Facilities
,
1995
.
[4]
S D Anderson,et al.
CONSTRUCTIBILITY REVIEW PROCESS FOR TRANSPORTATION FACILITIES
,
1997
.
[5]
H. Randolph Thomas,et al.
Avoiding Delays During the Construction Phase of Highway Projects
,
2001
.
[6]
Aviad Shapira,et al.
Prebid and Preconstruction Planning Process
,
1993
.
[7]
Saad H.S. Al-Jibouri,et al.
GENETIC ALGORITHMS FOR CONSTRUCTION SITE LAYOUT IN PROJECT PLANNING
,
2002
.
[8]
James E. Rowings,et al.
Linear Scheduling Model: Development of Controlling Activity Path
,
1998
.