The Calculation Method of Earth-Rock Allocation Balance and its Application for the Pumped Storage Hydropower Construction
暂无分享,去创建一个
[1] Min-Yuan Cheng,et al. OBJECT-ORIENTED EVOLUTIONARY FUZZY NEURAL INFERENCE SYSTEM FOR CONSTRUCTION MANAGEMENT , 2003 .
[2] Soemon Takakuwa. A practical module-based simulation model for transportation-inventory systems , 1998, 1998 Winter Simulation Conference. Proceedings (Cat. No.98CH36274).
[3] Jin Peng,et al. Analysis of Network Scheduling Optimization Technique Based on Construction Simulation , 2006 .
[4] Ron Wakefield. APPLICATION OF EXTENDED STOCHASTIC PETRI NETS TO SIMULATION AND MODELLING OF CONSTRUCTION SYSTEMS , 1998 .
[5] Wang Ting-liang. Design and research of mathematical model and simulation system for earth-rock excavation , 2009 .
[6] Ming Lu,et al. Materials Handling System Simulation in Precast Viaduct Construction: Modeling, Analysis, and Implementation , 2008 .
[7] Simaan M. AbouRizk,et al. Role of Simulation in Construction Engineering and Management , 2010 .
[8] Sun Yi. Application of computer simulation using stochastic-fuzziness artificial technique in earth-rock excavation project , 2005 .
[9] Zhang Wenxi. Study on allocation balance of earth-rock work for main works of Liyang Pumped Storage Hydropower Station , 2011 .
[10] R.J. Scherer,et al. A distributed multi-model-based Management Information System for simulation and decision-making on construction projects , 2011, Adv. Eng. Informatics.
[11] Bo Cui,et al. Real-time compaction quality monitoring of high core rockfill dam , 2011 .