Cost analysis for two-unit warm standby systems
暂无分享,去创建一个
Abstract For a two-unit warm standby system with general repair and failure time distributions, the net profit has been studied as the difference between functions of the operation time and down time. The expected number of products manufactured is also given.
[1] P.R. Parthasarathy. Cost Analysis for 2-Unit Systems , 1979, IEEE Transactions on Reliability.
[2] Prabhaker Reddy,et al. Standby redundancy in reliability - a review , 1986, IEEE Transactions on Reliability.
[3] Toshio Nakagawa,et al. Bibliography for Reliability and Availability of Stochastic Systems , 1976 .