Forecasting the semiconductor industry cycles by bootstrap prediction intervals

In recent years, there has been a recognition that point forecasts of the semiconductor industry sales may often be of limited value. There is substantial interest for a policy maker or an individual investor in knowing the degree of uncertainty that attaches to the point forecast before deciding whether to increase production of semiconductors or purchase a particular share from the semiconductor stock market. In this article, I first obtain the bootstrap prediction intervals of the global semiconductor industry cycles by a vector autoregressive (VAR) model using monthly US data consisting of four macroeconomic and seven industry-level variables with 92 observations. The 24-step-ahead out-of-sample forecasts from various VAR setups are used for comparison. The empirical result shows that the proposed 11-variable VAR model with the appropriate lag length captures the cyclical behaviour of the industry and outperforms other VAR models in terms of both point forecast and prediction interval.

[1]  Sangho Chung The learning curve and the yield factor: the case of Korea's semiconductor industry , 2001 .

[2]  H. Gruber The yield factor and the learning curve in semiconductor production , 1994 .

[3]  H. Gruber The learning curve in the production of semiconductor memory chips , 1992 .

[4]  Jae H. Kim Asymptotic and bootstrap prediction regions for vector autoregression , 1999 .

[5]  Juan Romo,et al.  Effects of parameter estimation on prediction densities: a bootstrap approach , 1999 .

[6]  Guido Masarotto,et al.  Bootstrap prediction intervals for autoregressions , 1990 .

[7]  Jae H. Kim Bootstrap prediction intervals for autoregression using asymptotically mean-unbiased estimators , 2004 .

[8]  M. Veall,et al.  Bootstrap prediction intervals for single period regression forecasts , 2002 .

[9]  Rob J Hyndman,et al.  25 Years of Iif Time Series Forecasting: A Selective Review , 2005 .

[10]  Matteo Grigoletto,et al.  Bootstrap prediction intervals for autoregressions: some alternatives , 1998 .

[11]  J. Stock,et al.  Efficient Tests for an Autoregressive Unit Root , 1992 .

[12]  Anne B. Koehler,et al.  On confusing lead time demand with h-period-ahead forecasts , 1991 .

[13]  G. C. Tiao,et al.  An introduction to multiple time series analysis. , 1993, Medical care.

[14]  J. J. Reeves Bootstrap prediction intervals for ARCH models , 2005 .

[15]  C. Sims,et al.  Comparison of Interwar and Postwar Business Cycles: Monetarism Reconsidered , 1980 .

[16]  James D. Hamilton Time Series Analysis , 1994 .

[17]  Anne B. Koehler,et al.  An inappropriate prediction interval , 1990 .

[18]  C. Sims,et al.  Vector Autoregressions , 1999 .

[19]  J. Stock,et al.  EFFICIENT TESTS FOR AN AUTOREGRESSIVE UNIT ROOT BY GRAHwA ELLIOrr, THOMAS , 2007 .

[20]  Juan Romo,et al.  Bootstrap prediction intervals for power-transformed time series , 2005 .