Part-out-based spares provisioning management: A military aviation maintenance case study

Purpose – The purpose of this paper is to present the prerequisites for a part-out-based spares provisioning (PBSP) programme during the phase-out of an aircraft fleet. Furthermore, associated key decision criteria are identified and a framework for the phase-out management process is presented. Design/methodology/approach – Once a decision has been taken to phase-out an aircraft fleet, a number of routines for operations, maintenance and storage are affected and new tasks and functions must be introduced before initiating the actual parting-out process. A decision-making system and a management framework is needed to manage spares planning during the end-of-life phase to ensure availability at minimum cost and to ensure a manageable risk of backorders. Findings – For PBSP programme during the phase-out of an aircraft fleet to succeed and be cost-effective, a number of linked processes, tasks and decisions are required, e.g., those included in the framework proposed in this paper (see Figure 3). A success...

[1]  Edward G. Keating †,et al.  Preface , 2002, Peptides.

[2]  Farhad Ameri,et al.  Product Lifecycle Management: Closing the Knowledge Loops , 2005 .

[3]  Yongsheng Ma,et al.  Product lifecycle management in aviation maintenance, repair and overhaul , 2008, Comput. Ind..

[4]  Ruud H. Teunter,et al.  End-of-life service: A case study , 1998, Eur. J. Oper. Res..

[5]  A. Michael Huberman,et al.  An expanded sourcebook qualitative data analysis , 1994 .

[6]  C. Richard Cassady,et al.  Evaluating the impact of cannibalization on fleet performance , 2007, Qual. Reliab. Eng. Int..

[7]  Charles Leake Systems Maintainability Analysis, Engineering and Management , 1998, J. Oper. Res. Soc..

[8]  Ashraf Labib,et al.  A decision analysis model for maintenance policy selection using a CMMS , 2004 .

[9]  David F. Pyke,et al.  Inventory management and production planning and scheduling , 1998 .

[10]  Jean Hartley,et al.  Case study research , 2004 .

[11]  Ruud H. Teunter,et al.  Inventory control of service parts in the final phase , 2002, Eur. J. Oper. Res..

[12]  Wayne Nelson,et al.  Applied life data analysis , 1983 .

[13]  Jan Block,et al.  Using Monte Carlo simulation as support for decision making while negotiating a PBL contract , 2014, 2014 IEEE Aerospace Conference.

[14]  Terry Wireman Computerized maintenance management systems , 1986 .

[15]  Hui-Chieh Li,et al.  Aircraft Replacement Scheduling: a Dynamic Programming Approach , 2011 .

[16]  John Stark,et al.  Product Lifecycle Management , 2005 .

[17]  Uday Kumar,et al.  Fleet-level reliability analysis of repairable units : a non-parametric approach using the mean cumulative function , 2013 .

[18]  R. Yin Case Study Research: Design and Methods , 1984 .

[19]  Victoria A. Greenfield,et al.  How old is too old? An economic approach to replacing military aircraft , 2003 .

[20]  Ramin Karim,et al.  Usability aspects of eMaintenance solutions , 2012 .

[21]  Uday Kumar,et al.  Cost Based Risk Analysis to Identify Inspection and Restoration Intervals of Hidden Failures Subject to Aging , 2011, IEEE Transactions on Reliability.

[22]  Jan Block,et al.  Dependability analysis of military aircraft fleet performance in a lifecycle perspective , 2009 .

[23]  Gilvan C. Souza,et al.  Good buy? Delaying end-of-life purchases , 2003, Eur. J. Oper. Res..