Constructing distributed schedulers using the MESSIAHS interface language
暂无分享,去创建一个
[1] Vivek Sarkar,et al. Compile-time partitioning and scheduling of parallel programs , 1986, SIGPLAN '86.
[2] Robert D. Silverman,et al. A Distributed Batching System for Parallel Processing , 1989, Softw. Pract. Exp..
[3] Frank Eliassen,et al. Language support for Multi-database Transactions in a Cooperative , Autonomous Environment , 1987 .
[4] Sheng-De Wang,et al. Minimization of task turnaround time for distributed systems , 1989, [1989] Proceedings of the Thirteenth Annual International Computer Software & Applications Conference.
[5] David B. Shmoys,et al. A Polynomial Approximation Scheme for Scheduling on Uniform Processors: Using the Dual Approximation Approach , 1988, SIAM J. Comput..
[6] Alan H. Karp,et al. 1992 Gordon Bell Prize Winners , 1993, Computer.
[7] Harold S. Stone,et al. Multiprocessor Scheduling with the Aid of Network Flow Algorithms , 1977, IEEE Transactions on Software Engineering.
[8] Larry L. Peterson,et al. Univers: An attribute‐based name server , 1990, Softw. Pract. Exp..
[9] Virginia Mary Lo,et al. Heuristic Algorithms for Task Assignment in Distributed Systems , 1988, IEEE Trans. Computers.
[10] Arif Ghafoor,et al. An efficient model of dynamic task scheduling for distributed systems , 1990, Proceedings., Fourteenth Annual International Computer Software and Applications Conference.
[11] Jack Dongarra,et al. Pvm 3 user's guide and reference manual , 1993 .
[12] Alan H. Karp,et al. Gordin Bell Prize Winners , 1995 .
[13] Edward D. Lazowska,et al. A Comparison of Receiver-Initiated and Sender-Initiated Adaptive Load Sharing , 1986, Perform. Evaluation.
[14] Vivek Sarkar,et al. Partitioning parallel programs for macro-dataflow , 1986, LFP '86.
[15] Shyamal K. Chowdhury. The Greedy Load Sharing Algorithm , 1990, J. Parallel Distributed Comput..
[16] Ronald L. Rivest,et al. The Design and Analysis of Computer Algorithms , 1990 .
[17] Anurag Kumar,et al. Adaptive Optimal Load Balancing in a Nonhomogeneous Multiserver System with a Central Job Scheduler , 1990, IEEE Trans. Computers.
[18] Ben A. Blake,et al. Assignment of independent tasks to minimize completion time , 1992, Softw. Pract. Exp..
[19] Il-Hyung Cho,et al. A close look at task assignment in distributed systems , 1991, IEEE INFCOM '91. The conference on Computer Communications. Tenth Annual Joint Comference of the IEEE Computer and Communications Societies Proceedings.
[20] Andreas Drexl. Job-Prozessor-Scheduling für heterogene Computernetzwerke , 1990, Wirtsch..
[21] Camille C. Price,et al. Scheduling of Precedence-Constrained Tasks on Multiprocessors , 1990, Comput. J..
[22] M. Litzkow. REMOTE UNIX TURNING IDLE WORKSTATIONS INTO CYCLE SERVERS , 1992 .
[23] Weimin Du,et al. Effects of local autonomy of global concurrency control in heterogeneous distributed database systems , 1989, Proceedings. Second International Conference on Data and Knowledge Systems for Manufacturing and Engineering.
[24] Chien-Min Wang,et al. Structured partitioning of concurrent programs for execution on multiprocessors , 1990, Parallel Comput..
[25] Thomas L. Casavant,et al. A Taxonomy of Scheduling in General-Purpose Distributed Computing Systems , 1988, IEEE Trans. Software Eng..
[26] Flavio Bonomi,et al. On Job Assignment for a Parallel System of Processor Sharing Queues , 1990, IEEE Trans. Computers.
[27] Steve J. Chapin,et al. Scheduling Support Mechanisms for Autonomous, Heterogeneous, Distributed Systems (Ph.D. Thesis) , 1993 .
[28] S. Chapin. An Overview of the Messiahs Distributed Scheduling Support System , 1993 .
[29] Eugene H. Spafford,et al. Scheduling Support for an Internetwork of Heterogeneous, Autonomous Processors , 1991 .
[30] Alfred V. Aho,et al. The Design and Analysis of Computer Algorithms , 1974 .