An integrated multi-ship crane allocation in Beirut Port container terminal

This paper investigates the integration between the quay and yard sides for multiple berthing ships with transshipment containers. This paper is motivated by the experience of an operator at Beirut Port. An integer linear programming model is formulated to minimize the total number of cranes used in both quay and yard sides for all berthing ships with transshipment containers unloading during a finite and discretized time horizon. The number of containers to be unloaded is determined in each time period, by each quay crane, at each ship bay location, along with the designated storage location at the yard side. The number of yard cranes needed at each storage yard block is also determined over the time horizon. Major capacity, time, and spatial constraints related to transshipment operations are taken into consideration. One insight from our numerical results is that restricting resources at the yard side will lead to an increase in required cranes at the quay side, and vice versa, which confirm results in earlier literature on single ship. However, we argue, via several counter examples, that single-ship solutions are not easily adaptable to multi-ship situations, which justifies the purpose of integrated formulations such as ours.

[1]  Carlos F. Daganzo,et al.  THE CRANE SCHEDULING PROBLEM , 1989 .

[2]  Omid Motlagh,et al.  A genetic algorithm for optimization of integrated scheduling of cranes, vehicles, and storage platforms at automated container terminals , 2014, J. Comput. Appl. Math..

[3]  Der-Horng Lee,et al.  A heuristic algorithm for yard truck scheduling and storage allocation problems , 2009 .

[4]  Nathan Huynh,et al.  Integrated quay crane and yard truck scheduling for unloading inbound containers , 2015 .

[5]  Wuqin Lin On dynamic crane deployment in container terminals , 2000 .

[6]  Yi Ding,et al.  Dynamic configuration of QC allocating problem based on multi-objective genetic algorithm , 2017, J. Intell. Manuf..

[7]  Erhan Kozan,et al.  Mathematical modelling of container transfers and storage locations at seaport terminals , 2006, OR Spectr..

[8]  Ali Diabat,et al.  A Lagrangian relaxation approach for solving the integrated quay crane assignment and scheduling problem , 2015 .

[9]  Lixin Tang,et al.  Modeling and solution of the joint quay crane and truck scheduling problem , 2014, Eur. J. Oper. Res..

[10]  Der-Horng Lee,et al.  A Decision Support Method for Truck Scheduling and Storage Allocation Problem at Container , 2008 .

[11]  Z. Caner Taskin,et al.  Optimal berth allocation and time-invariant quay crane assignment in container terminals , 2014, Eur. J. Oper. Res..

[12]  I. Kaysi,et al.  Optimal investment strategy in a container terminal: A game theoretic approach , 2015 .

[13]  Carlos F. Daganzo,et al.  A branch and bound solution method for the crane scheduling problem , 1990 .

[14]  Gilbert Laporte,et al.  The service allocation problem at the Gioia Tauro Maritime Terminal , 2007, Eur. J. Oper. Res..

[15]  Chung-Lun Li,et al.  Analysis of a new vehicle scheduling and location problem , 2001 .

[16]  Frank Meisel,et al.  The quay crane scheduling problem with time windows , 2011 .

[17]  Yue Wu,et al.  Modelling of dual-cycle strategy for container storage and vehicle scheduling problems at automated container terminals , 2015 .

[18]  Gilbert Laporte,et al.  Scheduling Twin Yard Cranes in a Container Block , 2015, Transp. Sci..

[19]  Lilach Nachum United Nations Conference on Trade and Development (UNCTAD): World Investment Report 2000: Cross-Border Mergers and Acquisitions and Development United Nations, New York and Geneva 2000. (Biblio Service) , 2001 .

[20]  M. Balinski Fixed‐cost transportation problems , 1961 .

[21]  Loo Hay Lee,et al.  An optimization model for storage yard management in transshipment hubs , 2006, OR Spectr..

[22]  Mariette Awad,et al.  A Pseudo Bargaining Formulation For Servicing Vessels During Transshipment Operations , 2010, IKE.

[23]  André Langevin,et al.  Integrated scheduling of crane handling and truck transportation in a maritime container terminal , 2013, Eur. J. Oper. Res..

[24]  Youfang Huang,et al.  Integrated internal truck, yard crane and quay crane scheduling in a container terminal considering energy consumption , 2015, Expert Syst. Appl..

[25]  Der-Horng Lee,et al.  The Integrated Yard Truck and Yard Crane Scheduling Problem: Benders' Decomposition-Based Methods , 2010 .

[26]  Lu Zhen,et al.  Scheduling quay cranes and yard trucks for unloading operations in container ports , 2019, Ann. Oper. Res..

[27]  André Langevin,et al.  Multiple yard cranes scheduling for loading operations in a container terminal , 2011 .

[28]  Katta G. Murty,et al.  Hongkong International Terminals Gains Elastic Capacity Using a Data-Intensive Decision-Support System , 2005, Interfaces.

[29]  Stefan Voß,et al.  Operations research at container terminals: a literature update , 2007, OR Spectr..

[30]  Loo Hay Lee,et al.  A yard storage strategy for minimizing traffic congestion in a marine container transshipment hub , 2008, OR Spectr..

[31]  G. Nemhauser,et al.  Integer Programming , 2020 .

[32]  Lifeng Xi,et al.  A tabu search algorithm for the integrated scheduling problem of container handling systems in a maritime terminal , 2007, Eur. J. Oper. Res..

[33]  Paolo Toth,et al.  A Reduced-Cost Iterated Local Search Heuristic for the Fixed-Charge Transportation Problem , 2014, Oper. Res..

[34]  Lixin Miao,et al.  Quay crane scheduling with non-interference constraints in port container terminals , 2008 .

[35]  Youfang Huang,et al.  Yard crane scheduling in a container terminal for the trade-off between efficiency and energy consumption , 2015, Adv. Eng. Informatics.

[36]  Yiqin Lu,et al.  The integrated optimization of container terminal scheduling with uncertain factors , 2014, Comput. Ind. Eng..

[37]  Ali Diabat,et al.  The Quay Crane Scheduling Problem , 2015 .

[38]  Luca Maria Gambardella,et al.  An optimization methodology for intermodal terminal management , 2001, J. Intell. Manuf..

[39]  Matteo Salani,et al.  Modeling and Solving the Tactical Berth Allocation Problem , 2010 .

[40]  Christian Bierwirth,et al.  A follow-up survey of berth allocation and quay crane scheduling problems in container terminals , 2015, Eur. J. Oper. Res..

[41]  Loo Hay Lee,et al.  Tree based searching approaches for integrated vehicle dispatching and container allocation in a transshipment hub , 2017, Expert Syst. Appl..

[42]  Kap Hwan Kim,et al.  A crane scheduling method for port container terminals , 2004, Eur. J. Oper. Res..

[43]  Eddy Van de Voorde What Future the Maritime Sector: Some Considerations on Globalisation, Co-Operation and Market Power , 2005 .

[44]  Mark Goh,et al.  Discrete time model and algorithms for container yard crane scheduling , 2009, Eur. J. Oper. Res..

[45]  K. L. Mak,et al.  Yard crane scheduling in port container terminals , 2005 .

[46]  Loo Hay Lee,et al.  Vehicle dispatching algorithms for container transshipment hubs , 2010, OR Spectr..

[47]  Arnaud Fréville,et al.  The multidimensional 0-1 knapsack problem: An overview , 2004, Eur. J. Oper. Res..

[48]  Qian Zhang,et al.  A simulation optimization approach for solving the dual-cycling problem in container terminals , 2015 .

[49]  Isam Kaysi,et al.  An integrated model for resource allocation and scheduling in a transshipment container terminal , 2012 .

[50]  Christian Bierwirth,et al.  A survey of berth allocation and quay crane scheduling problems in container terminals , 2010, Eur. J. Oper. Res..

[51]  Manish Verma,et al.  An analytical framework for integrated maritime terminal scheduling problems with time windows , 2014, Expert Syst. Appl..

[52]  Ebru K. Bish,et al.  A multiple-crane-constrained scheduling problem in a container terminal , 2003, Eur. J. Oper. Res..

[53]  Henry Y. K. Lau,et al.  Integrated scheduling of handling equipment at automated container terminals , 2008 .

[54]  Diego Klabjan,et al.  Multiship Crane Sequencing with Yard Congestion Constraints , 2009, Transp. Sci..