Transient Thermal-Hydraulic Responses of the Nuclear Steam Generator Secondary Side to a Main Steam Line Break
暂无分享,去创建一个
[1] L. Wolf. Experimental results of coupled fluid-structure interactions during blowdown of the HDR-vessel and comparisons with pre- and post-test predictions , 1982 .
[2] Jong Chull Jo. Numerical Simulation of Pressure Transients in a PWR Main Steam Line System Due to Quick Operations of Pressure Relief Valve , 2009 .
[3] F. Menter. Two-equation eddy-viscosity turbulence models for engineering applications , 1994 .
[4] Jovica R. Riznic,et al. COMMISSIONING TESTS FOR AN EXPERIMENTAL STUDY OF STEAM GENERATOR TUBE LOADING DURING BLOWDOWN , 2013 .
[5] Hernan Tinoco. Three-Dimensional Modeling of a Steam-Line Break in a Boiling Water Reactor , 2002 .
[6] S. P. Kalra,et al. Thermal hydraulics of steam line break transients in thermal reactors-simulation experiments , 1980 .
[7] Frederick J. Moody,et al. Introduction to Unsteady Thermofluid Mechanics , 1990 .