On Modelling Approaches for Planning and Scheduling in Food Processing Industry
暂无分享,去创建一个
[1] Stefan Minner,et al. A hybrid general lot-sizing and scheduling formulation for a production process with a two-stage product structure August 24 , 2009 , 2009 .
[2] Laurence A. Wolsey,et al. MIP modelling of changeovers in production planning and scheduling problems , 1997 .
[3] Alistair R. Clark,et al. Capacitated lot-sizing and scheduling with sequence-dependent, period-overlapping and non-triangular setups , 2011, J. Sched..
[4] Uday S. Karmarkar,et al. The Deterministic Dynamic Product Cycling Problem , 1985, Oper. Res..
[5] Alf Kimms,et al. Lot Sizing and Scheduling with Sequence Dependent Setup Costs and Times and Efficient Rescheduling O , 2000 .
[6] Chetan Soman,et al. Capacitated planning and scheduling for combined make-to-order and make-to-stock production in the food industry: An illustrative case study , 2007 .
[7] Christopher Sürie,et al. Production , Manufacturing and Logistics Modeling of period overlapping setup times , 2005 .
[8] Ik Sun Lee,et al. Coordinated scheduling of production and delivery stages with stage-dependent inventory holding costs , 2010 .
[9] Reinaldo Morabito,et al. Solution approaches for the soft drink integrated production lot sizing and scheduling problem , 2009, Eur. J. Oper. Res..
[10] Mei-Shiang Chang,et al. Production scheduling and vehicle routing with time windows for perishable food products , 2009, Comput. Oper. Res..
[11] Stéphane Dauzère-Pérès,et al. Solving the discrete lotsizing and scheduling problem with sequence dependent set-up costs and set-up times using the Travelling Salesman Problem with time windows , 1997, Eur. J. Oper. Res..
[12] Herbert Meyr,et al. Simultaneous lotsizing and scheduling by combining local search with dual reoptimization , 2000, Eur. J. Oper. Res..
[13] Marc Salomon,et al. Batching decisions: structure and models , 1994 .
[14] Martin Grunow,et al. Realizing block planning concepts in make-and-pack production using MILP modelling and SAP APO © , 2006 .
[15] Laurence A. Wolsey,et al. Production Planning by Mixed Integer Programming , 2010 .
[16] Norbert Trautmann,et al. A continuous-time MILP model for short-term scheduling of make-and-pack production processes , 2013 .
[17] Knut Haase,et al. Capacitated lot-sizing with sequence dependent setup costs , 1996 .
[18] David M. Miller,et al. A framework for modelling setup carryover in the capacitated lot sizing problem , 1995 .
[19] Luis Puigjaner,et al. Simultaneous production and logistics operations planning in semicontinuous food industries , 2012 .
[20] Michael Pinedo,et al. Planning and Scheduling in Supply Chains: An Overview of Issues in Practice , 2004 .
[21] C. R. Sox,et al. The capacitated lot sizing problem with setup carry-over , 1999 .
[22] Zeger Degraeve,et al. Modeling industrial lot sizing problems: a review , 2008 .
[23] Bernardo Almada-Lobo,et al. Lot sizing and scheduling: industrial extensions and research opportunities , 2011 .
[24] Carlos Henggeler Antunes,et al. Multi-Objective Lot-Sizing and Scheduling Dealing with Perishability Issues , 2011 .
[25] Markku Kuula,et al. Multiperiod production planning carrying over set-up time , 2003 .
[26] John M. Wilson,et al. The capacitated lot sizing problem: a review of models and algorithms , 2003 .
[27] Heinrich Kuhn,et al. Capacitated lot-sizing with extensions: a review , 2008, 4OR.
[28] Hartmut Stadtler,et al. The Capacitated Lot-Sizing Problem with Linked Lot Sizes , 2003, Manag. Sci..
[29] Miguel Constantino,et al. A cutting plane approach to capacitated lot-sizing with start-up costs , 1996, Math. Program..
[30] Gerard Gaalman,et al. A basic period approach to the economic lot scheduling problem with shelf life considerations , 2004 .
[31] D. P. Donk,et al. Combined make-to-order and make-to-stock in a food production system , 2004 .
[32] Maria Antónia Carravilla,et al. A note on "the capacitated lot-sizing and scheduling problem with sequence-dependent setup costs and setup times , 2008, Comput. Oper. Res..
[33] B. Fleischmann. The discrete lot-sizing and scheduling problem , 1990 .
[34] G. D. Eppen,et al. Solving Multi-Item Capacitated Lot-Sizing Problems Using Variable Redefinition , 1987, Oper. Res..
[35] A. Drexl,et al. Discrete Lotsizing and Scheduling by Batch Sequencing , 1998 .
[36] D. Klabjan,et al. Single machine multi-product capacitated lot sizing with sequence-dependent setups , 2007 .
[37] L. V. Wassenhove,et al. Some extensions of the discrete lotsizing and scheduling problem , 1991 .
[38] Kathrin Gorgosilits,et al. Capacitated lot sizing and scheduling , 2008 .
[39] Mohan Gopalakrishnan,et al. A modified framework for modelling set-up carryover in the capacitated lotsizing problem , 2000 .
[40] Diwakar Gupta,et al. The capacitated lot-sizing and scheduling problem with sequence-dependent setup costs and setup times , 2005, Comput. Oper. Res..
[41] A. Drexl,et al. Proportional lotsizing and scheduling , 1995 .
[42] Alf Kimms,et al. Lot sizing and scheduling -- Survey and extensions , 1997 .
[43] Bilge Bilgen,et al. Integrated production and distribution planning in the fast moving consumer goods industry: a block planning application , 2010, OR Spectr..
[44] Herbert Meyr,et al. The general lotsizing and scheduling problem , 1997 .
[45] M. Lütke entrup,et al. Mixed-Integer Linear Programming approaches to shelf-life-integrated planning and scheduling in yoghurt production , 2005 .
[46] B. Fleischmann. The discrete lot-sizing and scheduling problem with sequence-dependent setup costs , 1994 .
[47] G.D.H. Claassen,et al. Planning and scheduling packaging lines in food industry , 1993 .