Dual Resource Constrained (DRC) Shops: Literature Review and Analysis

The majority of manufacturing systems in practice are constrained by machine capacity and labour capacity. Consequently a broad literature on Dual Resource Constrained (DRC) shops exists. However, to best of our knowledge, no systematic review of the literature has been presented. Rather, existing reviews follow an ad-hoc procedure for article selection. In response, this study presents a systematic review of the literature concerned with DRC operating issues, such as worker assignment and production planning and control methods. Results highlight that, while early literature on dual resource constraint job shops was mainly simulation based, recent literature tends towards advanced scheduling mechanisms. This arguably introduces a bias towards deterministic contexts. Moreover, most DRC literature focuses on shop floor control decisions as labour assignment and dispatching. This neglects higher-level planning and control methods, such as order release control.

[1]  Hoda A. ElMaraghy,et al.  Scheduling of manufacturing systems under dual-resource constraints using genetic algorithms , 2000 .

[2]  Timothy D. Fry,et al.  Labour flexibility and staffing levels in a dual-resource constrained job shop , 1993 .

[3]  F. Fruggiero,et al.  Agent-based modelling of movement rules in DRC systems for volume flexibility: human factors and technical performance , 2014 .

[4]  John B. Jensen,et al.  Learning and labour assignment in a dual resource constrained cellular shop , 2004 .

[5]  Gerard Gaalman,et al.  Cross-training workers in Dual Resource Constrained systems with heterogeneous processing times , 2009 .

[6]  H. Yue,et al.  Worker flexibility in a parallel dual resource constrained job shop , 2008 .

[7]  M. Hottenstein,et al.  Cross-training and worker flexibility: A review of DRC system research , 1998 .

[8]  Mark D. Treleven A Review of the Dual Resource Constrained System Research , 1989 .

[9]  H V Kher,et al.  Examination of flexibility acquisition policies in dual resource constrained job shops with simultaneous worker learning and forgetting effects , 2000, J. Oper. Res. Soc..

[10]  P. M. Bobrowski,et al.  Work release strategies in a dual resource constrained job shop , 1989 .

[11]  Timothy D. Fry,et al.  Multi-level heterogeneous worker flexibility in a Dual Resource Constrained (DRC) job-shop , 2001 .

[12]  Manoj K. Malhotra,et al.  An evaluation of worker assignment policies in dual resource-constrained job shops with heterogeneous resources and worker transfer delays , 1994 .

[13]  Timothy D. Fry,et al.  Modeling simultaneous worker learning and forgetting in dual resource constrained systems , 1999, Eur. J. Oper. Res..

[14]  Deming Lei,et al.  An effective neighborhood search for scheduling in dual-resource constrained interval job shop with environmental objective , 2015 .

[15]  Paul M. Bobrowski,et al.  Job release and labor flexibility in a dual resource constrained job shop , 1989 .

[16]  Lawrence D. Fredendall,et al.  Assessing the impact of reducing demand variance through improved planning on the performance of a dual resource constrained job shop , 1995 .

[17]  Lawrence D. Fredendall,et al.  Information and scheduling in a dual resource constrained job shop , 1996 .

[18]  Timothy D. Fry,et al.  Managing worker flexibility and attrition in dual resource constrained job shops , 1995 .

[19]  Deming Lei,et al.  Variable neighbourhood search for dual-resource constrained flexible job shop scheduling , 2014 .

[20]  P. S. Park,et al.  The examination of worker cross-training in a dual resource constrained job shop , 1991 .

[21]  Mohamad Y. Jaber,et al.  Modelling worker fatigue and recovery in dual-resource constrained systems , 2010, Comput. Ind. Eng..

[22]  Mohamad Y. Jaber,et al.  Worker deployment in dual resource constrained systems with a task-type factor , 2007, Eur. J. Oper. Res..

[23]  G. J. C. Gaalman,et al.  On the who-rule in Dual Resource Constrained (DRC) manufacturing systems , 2004 .

[24]  Paul M. Bobrowski,et al.  An evaluation of labor assignment rules when workers are not perfectly interchangeable , 1993 .

[25]  Jingyao Li,et al.  A branch population genetic algorithm for dual-resource constrained job shop scheduling problem , 2016, Comput. Ind. Eng..

[26]  Jing Zhang,et al.  A hybrid discrete particle swarm optimization for dual-resource constrained job shop scheduling with resource flexibility , 2017, J. Intell. Manuf..

[27]  Latif Salum,et al.  A multi-criteria adaptive control scheme based on neural networks and fuzzy inference for DRC manufacturing systems , 2010 .

[28]  Ling Wang,et al.  A knowledge-guided fruit fly optimization algorithm for dual resource constrained flexible job-shop scheduling problem , 2016 .

[29]  Timothy D. Fry,et al.  The Impact of Learning and Labor Attrition on Worker Flexibility in Dual Resource Constrained Job Shops , 1993 .

[30]  S. Q. Xie,et al.  Recent developments in Dual Resource Constrained (DRC) system research , 2011, Eur. J. Oper. Res..