Production planning of a multi-site manufacturing system by hybrid modelling: A case study from the automotive industry
暂无分享,去创建一个
Raffaello Iavagnilio | Giorgio Mossa | Giovanni Mummolo | M. G. Gnoni | A. Di Leva | G. Mummolo | G. Mossa | M. Gnoni | R. Iavagnilio | A. Leva
[1] Regine W. Vroom,et al. The application of STEP in the automotive supply chain , 1996 .
[2] D. C. Aucamp. A lot-sizing policy for production planning with applications in MRP , 1987 .
[3] Jeremy F. Shapiro,et al. Optimizing the Value Chain , 1993 .
[4] Abhijit Chaudhury,et al. MUDRAPLAN—A DSS for Media Planning: From Design to Utilization , 1992 .
[5] Dong-Jun Wu,et al. Software agents for knowledge management: coordination in multi-agent supply chains and auctions , 2001, Expert Syst. Appl..
[6] Hau L. Lee,et al. Strategic Analysis of Integrated Production-Distribution Systems: Models and Methods , 1988, Oper. Res..
[7] Donald E. Shobrys,et al. Planning, scheduling and control systems: why cannot they work together , 2000 .
[8] Maria Grazia Gnoni,et al. Solving a lot sizing and scheduling problem by hybrid modelling , 2002 .
[9] Göran Svensson,et al. A conceptual framework for the analysis of vulnerability in supply chains , 2000 .
[10] H. Pfohl,et al. Inter‐organizational logistics systems in flexible production networks , 2000 .
[11] M. Frohlich,et al. Arcs of integration: an international study of supply chain strategies , 2001 .
[12] Benita M. Beamon,et al. A multi-objective approach to simultaneous strategic and operational planning in supply chain design , 2000 .
[13] Heike Proff,et al. Hybrid strategies as a strategic challenge — the case of the German automotive industry , 2000 .
[14] M. D. Byrne,et al. Production planning using a hybrid simulation – analytical approach , 1999 .
[15] David M. Miller,et al. A framework for modelling setup carryover in the capacitated lot sizing problem , 1995 .
[16] Mark S. Fox,et al. Agent-Oriented Supply-Chain Management , 2000 .
[17] Linet Özdamar,et al. Hybrid heuristics for the capacitated lot sizing and loading problem with setup times and overtime decisions , 1998, Eur. J. Oper. Res..
[18] Giorgio Mossa,et al. Integrating Resource Allocation and Simulation in Project-type Production Planning and Control of Supply Chains: A Case from the Aeronautics Industry , 2001 .
[19] Mohan Gopalakrishnan,et al. A modified framework for modelling set-up carryover in the capacitated lotsizing problem , 2000 .
[20] J. George Shanthikumar,et al. A Unifying View of Hybrid Simulation/Analytic Models and Modeling , 1983, Oper. Res..
[21] Bill Fulkerson. A response to dynamic change in the market place , 1997, Decis. Support Syst..
[22] Joseph F. Pekny,et al. A model predictive framework for planning and scheduling problems: a case study of consumer goods supply chain , 2000 .
[23] D. Towill,et al. Supply chain migration from lean and functional to agile and customised , 2000 .
[24] Douglas J. Thomas,et al. Coordinated supply chain management , 1996 .
[25] Eleni Hadjiconstantinou. Quick response in the supply chain , 1999 .
[26] G. Stevens,et al. The Role of Logistics and IT in the European Enterprise , 1999 .
[27] Radivoj Petrovic,et al. Modelling and simulation of a supply chain in an uncertain environment , 1998, Eur. J. Oper. Res..
[28] Larry P. Ritzman,et al. A model for lot sizing and sequencing in process industries , 1988 .
[29] Lee J. Krajewski,et al. A model for comparing supply chain schedule integration approaches , 2000 .