Production planning of a multi-site manufacturing system by hybrid modelling: A case study from the automotive industry

Abstract The paper deals with lot sizing and scheduling problem (LSSP) of a multi-site manufacturing system with capacity constraints and uncertain multi-product and multi-period demand. LSSP is solved by an hybrid model resulting from the integration of a mixed-integer linear programming model and a simulation model. The hybrid modelling approach is adopted to test a local as well as a global production strategy in solving the LSSP concerned. The model proposed is applied to a supply chain of a multi-site manufacturing system of braking equipments for the automotive industry. Solutions obtained by the hybrid model under the local or the global production strategy are compared with an actual reference production plan. The approach could help decision making in adopting a cooperative, rather than competitive, production strategy.

[1]  Regine W. Vroom,et al.  The application of STEP in the automotive supply chain , 1996 .

[2]  D. C. Aucamp A lot-sizing policy for production planning with applications in MRP , 1987 .

[3]  Jeremy F. Shapiro,et al.  Optimizing the Value Chain , 1993 .

[4]  Abhijit Chaudhury,et al.  MUDRAPLAN—A DSS for Media Planning: From Design to Utilization , 1992 .

[5]  Dong-Jun Wu,et al.  Software agents for knowledge management: coordination in multi-agent supply chains and auctions , 2001, Expert Syst. Appl..

[6]  Hau L. Lee,et al.  Strategic Analysis of Integrated Production-Distribution Systems: Models and Methods , 1988, Oper. Res..

[7]  Donald E. Shobrys,et al.  Planning, scheduling and control systems: why cannot they work together , 2000 .

[8]  Maria Grazia Gnoni,et al.  Solving a lot sizing and scheduling problem by hybrid modelling , 2002 .

[9]  Göran Svensson,et al.  A conceptual framework for the analysis of vulnerability in supply chains , 2000 .

[10]  H. Pfohl,et al.  Inter‐organizational logistics systems in flexible production networks , 2000 .

[11]  M. Frohlich,et al.  Arcs of integration: an international study of supply chain strategies , 2001 .

[12]  Benita M. Beamon,et al.  A multi-objective approach to simultaneous strategic and operational planning in supply chain design , 2000 .

[13]  Heike Proff,et al.  Hybrid strategies as a strategic challenge — the case of the German automotive industry , 2000 .

[14]  M. D. Byrne,et al.  Production planning using a hybrid simulation – analytical approach , 1999 .

[15]  David M. Miller,et al.  A framework for modelling setup carryover in the capacitated lot sizing problem , 1995 .

[16]  Mark S. Fox,et al.  Agent-Oriented Supply-Chain Management , 2000 .

[17]  Linet Özdamar,et al.  Hybrid heuristics for the capacitated lot sizing and loading problem with setup times and overtime decisions , 1998, Eur. J. Oper. Res..

[18]  Giorgio Mossa,et al.  Integrating Resource Allocation and Simulation in Project-type Production Planning and Control of Supply Chains: A Case from the Aeronautics Industry , 2001 .

[19]  Mohan Gopalakrishnan,et al.  A modified framework for modelling set-up carryover in the capacitated lotsizing problem , 2000 .

[20]  J. George Shanthikumar,et al.  A Unifying View of Hybrid Simulation/Analytic Models and Modeling , 1983, Oper. Res..

[21]  Bill Fulkerson A response to dynamic change in the market place , 1997, Decis. Support Syst..

[22]  Joseph F. Pekny,et al.  A model predictive framework for planning and scheduling problems: a case study of consumer goods supply chain , 2000 .

[23]  D. Towill,et al.  Supply chain migration from lean and functional to agile and customised , 2000 .

[24]  Douglas J. Thomas,et al.  Coordinated supply chain management , 1996 .

[25]  Eleni Hadjiconstantinou Quick response in the supply chain , 1999 .

[26]  G. Stevens,et al.  The Role of Logistics and IT in the European Enterprise , 1999 .

[27]  Radivoj Petrovic,et al.  Modelling and simulation of a supply chain in an uncertain environment , 1998, Eur. J. Oper. Res..

[28]  Larry P. Ritzman,et al.  A model for lot sizing and sequencing in process industries , 1988 .

[29]  Lee J. Krajewski,et al.  A model for comparing supply chain schedule integration approaches , 2000 .