Hybrid Model for Crane Scheduling
暂无分享,去创建一个
[1] Lixin Tang,et al. A mathematical programming model for scheduling steelmaking-continuous casting production , 2000, Eur. J. Oper. Res..
[2] Carmen Del Vecchio,et al. Cranes control with time-based and position constraints , 2007, 2007 46th IEEE Conference on Decision and Control.
[3] Frank DiCesare,et al. Scheduling flexible manufacturing systems using Petri nets and heuristic search , 1994, IEEE Trans. Robotics Autom..
[4] Michael Pinedo,et al. Scheduling jobs on parallel machines with sequence-dependent setup times , 1997, Eur. J. Oper. Res..
[5] I. Grossmann,et al. A decomposition approach for the scheduling of a steel plant production , 2001 .
[6] Francesco Amato,et al. Optimal control of warehousing systems with simultaneous crane and shuttle optimization , 2001, ETFA 2001. 8th International Conference on Emerging Technologies and Factory Automation. Proceedings (Cat. No.01TH8597).
[7] S. Sastry,et al. On the existence of executions of hybrid automata , 1999, Proceedings of the 38th IEEE Conference on Decision and Control (Cat. No.99CH36304).
[8] Chelliah Sriskandarajah,et al. Parallel machine scheduling with a common server , 2000, Discret. Appl. Math..
[9] H. Tamaki,et al. Optimization model and simulation-based solution for a class of crane scheduling problems , 2004, Proceedings of the 2004 IEEE International Conference on Control Applications, 2004..
[10] Kap Hwan Kim,et al. A crane scheduling method for port container terminals , 2004, Eur. J. Oper. Res..