Linking the Motivations and Practices of Design Organizations to Implement Building Information Modeling in Construction Projects: Empirical Study in China

AbstractDrawing on institutional theory and the innovation diffusion literature, this paper investigates how design organizations’ building information modeling (BIM) implementation practices in construction projects are associated with their BIM implementation motivations and related project contextual factors. These associations are empirically tested with survey data collected from BIM-based construction projects in China, and the examined BIM implementation motivations include image motives, reactive motives, project-based economic motives, and cross-project economic motives. Hierarchical regression analysis results illustrate that design organizations’ project BIM implementation practices are significantly impacted by project contextual factors such as client/owner support, and that after controlling for the project contextual factors the higher weights of project-based economic motives and image motives are both significantly associated with higher levels of BIM implementation. By contrast, reactive...

[1]  Terry S. Overton,et al.  Estimating Nonresponse Bias in Mail Surveys , 1977 .

[2]  Martin Fischer,et al.  Areas of Application for 3D and 4D Models on Construction Projects , 2008 .

[3]  Jorge A. Arevalo,et al.  The Global Compact: An Analysis of the Motivations of Adoption in the Spanish Context , 2013 .

[4]  John E. Taylor,et al.  Paradigm Trajectories of Building Information Modeling Practice in Project Networks , 2009 .

[5]  Patricia Vohl Grembowski, D. G. (2016). The practice of health program evaluation (2nd ed.). Thousand Oaks, CA: SAGE Publications , 2017 .

[6]  R. Issa,et al.  Return on Investment Analysis of Using Building Information Modeling in Construction , 2013 .

[7]  John E. Taylor,et al.  Antecedents of Successful Three-Dimensional Computer-Aided Design Implementation in Design and Construction Networks , 2007 .

[8]  D. Gann,et al.  Innovation in project-based, service-enhanced firms: the construction of complex products and systems , 2000 .

[9]  J. Hair Multivariate data analysis , 1972 .

[10]  Ritu Agarwal,et al.  Technological Frames, Organizational Capabilities, and IT Use: An Empirical Investigation of Electronic Procurement , 2010, Inf. Syst. Res..

[11]  Tamera L. McCuen,et al.  Evaluating Award-Winning BIM Projects Using the National Building Information Model Standard Capability Maturity Model , 2012 .

[12]  Raj Mehta,et al.  An Investigation into the Antecedents of Organizational Participation in Business-to-Business Electronic Markets , 2001 .

[13]  Bilal Succar,et al.  Building information modelling framework: A research and delivery foundation for industry stakeholders , 2009 .

[14]  W. Powell,et al.  The iron cage revisited institutional isomorphism and collective rationality in organizational fields , 1983 .

[15]  P. M. Podsakoff,et al.  Self-Reports in Organizational Research: Problems and Prospects , 1986 .

[16]  Mehmet Yalcinkaya,et al.  Patterns and trends in Building Information Modeling (BIM) research: A Latent Semantic Analysis , 2015 .

[17]  D. Gann,et al.  Last among equals: a comparison of innovation in construction, services and manufacturing in the UK , 2005 .

[18]  Per Anker Jensen,et al.  Building information modelling in Denmark and Iceland , 2013 .

[19]  C. Anthony Di Benedetto,et al.  Diffusion of Innovation , 2015 .

[20]  Karen Kensek Building Information Modeling , 2014 .

[21]  Charles M. Eastman,et al.  BIM Handbook: A Guide to Building Information Modeling for Owners, Managers, Designers, Engineers and Contractors , 2008 .

[22]  Ajibade Ayodeji Aibinu,et al.  Status of BIM Adoption and the BIM Experience of Cost Consultants in Australia , 2014 .

[23]  E. Rogers Diffusion of Innovations , 1962 .

[24]  C. Oliver STRATEGIC RESPONSES TO INSTITUTIONAL PROCESSES , 1991 .

[25]  Heng Li,et al.  Impacts of Isomorphic Pressures on BIM Adoption in Construction Projects , 2014 .

[26]  Peer C. Fiss,et al.  INSTITUTIONALIZATION, FRAMING, AND DIFFUSION: THE LOGIC OF TQM ADOPTION AND IMPLEMENTATION DECISIONS AMONG U.S. HOSPITALS , 2009 .

[27]  E. Sarah Slaughter,et al.  Models of Construction Innovation , 1998 .

[28]  Frank Schultmann,et al.  Building Information Modeling (BIM) for existing buildings — Literature review and future needs , 2014 .

[29]  Carrie Sturts Dossick,et al.  Organizational Divisions in BIM-Enabled Commercial Construction , 2010 .

[30]  Eric Abrahamson Managerial Fads and Fashions: The Diffusion and Rejection of Innovations , 1991 .

[31]  Bilal Succar,et al.  Macro-BIM adoption: Conceptual structures , 2015 .

[32]  Izak Benbasat,et al.  Electronic Data Interchange and Small Organizations: Adoption and Impact of Technology , 1995, MIS Q..

[33]  E. Paiva,et al.  ISO 14001 certification in Brazil: motivations and benefits , 2008 .

[34]  W. Scott,et al.  Institutions and Organizations. , 1995 .

[35]  D. Prajogo The roles of firms' motives in affecting the outcomes of ISO 9000 adoption , 2011 .

[36]  Heng Li,et al.  Practices and effectiveness of building information modelling in construction projects in China , 2015 .

[37]  C. Fornell,et al.  Evaluating structural equation models with unobservable variables and measurement error. , 1981 .

[38]  Vikram Bhakoo,et al.  The iron cage exposed: Institutional pressures and heterogeneity across the healthcare supply chain , 2013 .