Pick-Up and Placement Improvement: An Industrial Case Study
暂无分享,去创建一个
[1] José Machado,et al. Cycle Time Reduction in Deck Roller Assembly Production Unit with Value Stream Mapping Analysis , 2017, WorldCIST.
[2] Maria Leonilde Rocha Varela,et al. Integrated Platform for Real-time Control and Production and Productivity Monitoring and Analysis , 2016 .
[3] Valeriy Vyatkin,et al. A Formal Methodology for Accomplishing IEC 61850 Real-Time Communication Requirements , 2017, IEEE Transactions on Industrial Electronics.
[4] Guilherme Kunz,et al. Modeling and simulating the controller behavior of an Automated People Mover using IEC 61850 communication requirements , 2011, 2011 9th IEEE International Conference on Industrial Informatics.
[5] Ihsan Onur Yilmaz. Development and Evaluation of Setup Strategies in Printed Circuit Board Assembly , 2008 .
[6] Maria Leonilde R. Varela,et al. Shortening changeover time — An industrial study , 2015, 2015 10th Iberian Conference on Information Systems and Technologies (CISTI).
[7] José Creissac Campos,et al. Pattern-based Analysis of Automated Production Systems , 2009 .
[8] Graham Kendall,et al. A survey of surface mount device placement machine optimisation: Machine classification , 2008, Eur. J. Oper. Res..