A Vendor-Buyers Integrated Inventory Model Involving Quality Improvement Investment in a Supply Chain

Today's supply chain environment requires a new spirit of cooperation between the buyer and the vendor. So the characteristics of current manufacturing systems are consistent high quality, small lot sizes, frequent delivery, and close supplier ties. Just-in-time (JIT) production is an integrated set of activities to achieve those objects by adopting continuous quality improvement and developing a long-term partnership. This paper presents the optimum joint economic lot size in a case where multiple buyers are demanding one type of item from a single vendor by summing the ordering/setup cost, holding cost and quality improvement investment. This model is useful particularly for integrated inventory systems where the vendor and the buyer form a strategic alliance for profit sharing.

[1]  C.-T. Su,et al.  Integrated inventory model of returns-quantity discounts contract , 2004, J. Oper. Res. Soc..

[2]  Meir J. Rosenblatt,et al.  Economic Production Cycles with Imperfect Production Processes , 1986 .

[3]  W. Hsu,et al.  EOQ model for imperfective items under a one-time-only discount , 2009 .

[4]  A. Banerjee A JOINT ECONOMIC-LOT-SIZE MODEL FOR PURCHASER AND VENDOR , 1986 .

[5]  Raafat N Ibrahim,et al.  A single-vendor multiple-buyer inventory model with a multiple-shipment policy , 2006 .

[6]  Evan L. Porteus Optimal Lot Sizing, Process Quality Improvement and Setup Cost Reduction , 1986, Oper. Res..

[7]  Jason Chao-Hsien Pan,et al.  Just-in-time purchasing: an integrated inventory model involving deterministic variable lead time and quality improvement investment , 2004 .

[8]  S. Goyal “A JOINT ECONOMIC‐LOT‐SIZE MODEL FOR PURCHASER AND VENDOR”: A COMMENT* , 1988 .

[9]  R. M. Hill,et al.  Another look at the single-vendor single-buyer integrated production-inventory problem , 2006 .

[10]  Tien-Yu Lin,et al.  OPTIMAL COORDINATION POLICY FOR SUPPLY CHAIN SYSTEM UNDER IMPERFECT QUALITY CONSIDERATION , 2010 .

[11]  Suresh Kumar Goyal,et al.  An integrated inventory model for a single supplier-single customer problem , 1977 .

[12]  Jack C. Hayya,et al.  Joint investment in quality improvement and setup reduction , 1995, Comput. Oper. Res..

[13]  Prafulla Joglekar Note-Comments on A Quantity Discount Pricing Model to Increase Vendor Profits , 1988 .

[14]  R. Ibrahim,et al.  Joint economic lot size in distribution system with multiple shipment policy , 2006 .

[15]  Suresh Kumar Goyal,et al.  The Individually Responsible and Rational Decision Approach to Economic Lot Sizes for One Vendor and Many Purchasers: A Comment* , 1992 .

[16]  Adrijit Goswami,et al.  A joint economic-lot-size model for purchaser and vendor in fuzzy sense , 2005 .

[17]  G Keller,et al.  Impact of investing in quality improvement on the lot size model , 1988 .

[18]  Chia-Huei Ho,et al.  The Single-Vendor Single-Buyer Integrated inventory Problem with Quality Improvement and lead Time Reduction - minimax Distribution-Free Approach , 2006, Asia Pac. J. Oper. Res..

[19]  Seung-Lae Kim,et al.  Implementation of JIT purchasing: An integrated approach , 1997 .

[20]  Lu Lu A one-vendor multi-buyer integrated inventory model , 1995 .

[21]  Liang-Yuh Ouyang,et al.  Impact of investing in quality improvement on (Q, r, L) model involving the imperfect production process , 2000 .

[22]  S. Goyal,et al.  Integrated inventory models: The buyer-vendor coordination , 1989 .