This paper provides an overview of the design requirements for medium-sized wind turbines intended for use in a remote hybrid power system. The recommendations are based on first-hand experience acquired at the University of Massachusetts through the installation, operation, and upgrade of a 250-kW turbine on a mountain top with difficult access in Western Massachusetts. Experience with the operation of this turbine and the design of its control system, together with a long history in the design and analysis of hybrid power systems, has made it possible to extend the work in Western Massachusetts to remote or hybrid power systems in general. The University test site has many attributes of more remote sites and the overall wind turbine installation is typical of one that could power a hybrid wind system. For example, access to the site is limited due to steep terrain, snow, and environmental restrictions. Also, the power lines feeding the turbine exhibit voltage sags and phase imbalance, especially during start-up. This paper is based on the experience gained from the operation of this wind turbine and assesses the requirements for the design and operation of medium to large wind turbines in remote locations. The work summarizes lessons learned relative to: (1) sensors, communication, and control capabilities; (2) grid connection issues; and (3) weather-related problems. The final section of the paper focuses on design requirements to ensure successful installation and the completion of maintenance and repairs at remote sites.
[1]
James F. Manwell,et al.
EXPERIMENTAL INVESTIGATION OF YAW DAMPING ON A DOWNWIND TURBINE
,
2001
.
[2]
James F. Manwell,et al.
Computer control for remote wind turbine operation
,
1997
.
[3]
James F. Manwell,et al.
OPERATIONAL EXPERIENCE WITH A 250 KW TEETERED ROTOR WIND TURBINE ON AN INLAND NEW ENGLAND RIDGE TOP
,
1998
.
[4]
James F. Manwell,et al.
HYBRID WIND/PV/DIESEL SYSTEM EXPERIENCES
,
1999
.
[5]
J. Mcgowan,et al.
WINDPOWER: A Turn of the Century Review
,
2000
.