Performance Assessment of Construction Engineering and Management (CEM) Degree Program in Developing Countries: Case of Pakistan

ABSTRACT The performance of construction industry is largely supported by the competence and skills generated by Construction Engineering and Management (CEM) programs offered in the country. A review of published literature points to scarcity of studies evaluating performance of curricula with respect to generating the requisite skills. In an attempt to assess the efficiency of CEM programs offered in Pakistan, this study identifies the key knowledge areas, technical skills, and expertise that these programs need to focus on for sufficiently preparing the post graduating students entering modern and complex construction industry. In doing so, two universities (NEDUET and NUST) offering mature CEM program at postgraduate level have been engaged. Based on a questionnaire survey of CEM graduates, employers and academicians, it is found that the program content is adequately designed and delivered by well versed and competent instructors. Generally, a high degree of agreement for technical skills is found among the perceptions of graduates and the expectations of the industry. However, some major challenges are identified which if addressed can help boost the satisfaction level of students. Acknowledging the possibility for improvement, recommendations for curricula updates in order to bridge the gap between academia and industry are proposed.

[1]  Mike Jackson,et al.  Exploration of Student Perceptions, Behaviors and Academic Performance in Construction Management Classes , 2015 .

[2]  Rizwan U. Farooqui,et al.  An Investigation of the Leadership Style of Construction Managers in South Florida , 2009 .

[3]  S El-Sabaa,et al.  The skills and career path of an effective project manager , 2001 .

[4]  Low Sui Pheng,et al.  Asian management style versus Western management theories – A Singapore case study in construction project management , 2001 .

[5]  N Pettersen,et al.  What do we know about the effective project manager , 1991 .

[6]  Sadi Assaf,et al.  Causes of delay in large construction projects , 2006 .

[7]  Rizwan U. Farooqui,et al.  Assessment of Pakistani Construction Industry – Current Performance and the Way Forward , 2008 .

[8]  Ben F. Bigelow,et al.  Construction Management Research: A Comparison of Perceived Value by General Contractors, Prevalence of Publication, and Funding , 2016 .

[9]  K. Smith,et al.  Looking Beyond Content: Skill Development for Engineers , 2008, 0802.2950.

[10]  Jeffrey S. Russell,et al.  Information technology (IT) and integration in the construction industry , 1995 .

[11]  Gary David Holt,et al.  WHICH CONTRACTOR SELECTION METHODOLOGY , 1998 .

[12]  Paul Jen-Hwa Hu,et al.  Investigating healthcare professionals' decisions to accept telemedicine technology: an empirical test of competing theories , 2002, Inf. Manag..

[13]  J. Tschirhart,et al.  Monopsony power and the existence of natural monopoly in energy utilities , 1995 .

[14]  John Ingham,et al.  Why do people use information technology? A critical review of the technology acceptance model , 2003, Inf. Manag..

[15]  Osama Abudayyeh,et al.  Construction Engineering and Management Undergraduate Education , 2000 .

[16]  Steven C. Padgitt,et al.  Extension's Portfolio for the 21st Century: A Place for One-on-One Consultations , 1999 .

[17]  Paul Murray,et al.  Sustainability literacy: the future paradigm for construction education? , 2007 .

[18]  Merlin D. Kirschenman Improvements to the Culture and Attitudes in Civil Engineering Education , 2011 .

[19]  Rizwan U. Farooqui,et al.  Key Attributes and Skills for Curriculum Improvement for Undergraduate Construction Management Programs , 2014 .

[20]  Janice Thomas,et al.  Preparing project managers to deal with complexity–advanced project management education , 2008, IEEE Engineering Management Review.

[21]  Salman T. Al-Sedairy A change management model for Saudi construction industry , 2001 .

[22]  Lynn Crawford,et al.  Causes of delay and cost overruns in construction of groundwater projects in a developing countries; Ghana as a case study , 2003 .

[23]  C. Shatz,et al.  Synaptic Activity and the Construction of Cortical Circuits , 1996, Science.

[24]  Steven Goh "2020 VISION" and its Implication for Engineering Management Education , 2007 .

[25]  Oana Ţăpurică,et al.  Involving Project Leaders within Project Management Teams – Key Factor towards Competitiveness , 2010 .

[26]  G. O'Connor,et al.  Implementing radical innovation in mature firms: The role of hubs , 2001 .

[27]  Bj⊘rn Asheim,et al.  Constructing knowledge-based regional advantage: Implications for regional innovation policy , 2007 .

[28]  Peter E.D. Love,et al.  Construction managers’ expectations and observations of graduates , 2001 .

[29]  Martin Skitmore,et al.  Causes of delays in Saudi Arabian public sector construction projects , 2009 .

[30]  Moonseo Park,et al.  Three Success Factors for Simulation Based Construction Education. , 2003 .

[31]  James Trevelyan,et al.  An engineer's typical day: lessons learned and implications for engineering education , 2009 .

[32]  Martin Skitmore,et al.  Underlying Knowledge of Construction Management Consultants in China , 2016 .

[33]  Chimay J. Anumba,et al.  Knowledge management practices in large construction organisations , 2005 .

[34]  Thomas Mengel,et al.  Outcome-based project management education for emerging leaders – A case study of teaching and learning project management , 2008 .

[35]  J. D. Bakos,et al.  Communication Skills for the 21st Century , 1997 .

[36]  D. Gordon,et al.  A natural monopoly in natural gas transmission , 2003 .

[37]  Lars-Erik Gadde,et al.  The construction industry as a loosely coupled system: implications for productivity and innovation , 2002 .

[38]  George Ofori,et al.  Challenges of Construction Industries in Developing Countries : Lessons from Various Countries , 2002 .

[39]  Burcin Becerik-Gerber,et al.  Building Information Modeling in Architecture, Engineering, and Construction: Emerging Research Directions and Trends , 2010 .

[40]  M. Valenti Gas pipelines go electric , 1996 .

[41]  W. Akili On Industry-Academia Relations in the Arab Gulf States: Steps toward Building Strategic Partnership , 2005, Proceedings Frontiers in Education 35th Annual Conference.

[42]  Azami Zaharim,et al.  Practical framework of employability skills for engineering graduate in Malaysia , 2010, IEEE EDUCON 2010 Conference.

[43]  박영진,et al.  A Study on 3D BIM Collaborative Approximate Estimating Model of Structural Work for Apartment Projects , 2011 .

[44]  M. M. Dlakwa,et al.  Reasons for overrun in public sector construction projects in Nigeria , 1990 .

[45]  Gary David Holt,et al.  Lowest price or value? Investigation of UK construction clients' tender selection process , 2000 .

[46]  Asha Rai Role of Communication Skills Laboratory in Empowering the Communicative Competence in Engineering Students , 2014 .

[47]  Charles Egbu,et al.  Skills, knowledge and competencies for managing construction refurbishment works , 1999 .

[48]  M. Valenti Teaching tomorrow's engineers , 1996 .

[49]  Kenneth H. Rose,et al.  Book Review: A Guide to the Project Management Body of Knowledge (PMBOK® Guide), Fourth Edition , 2001 .

[50]  A. Deep,et al.  Impact of Private Sector Participation on access and quality in provision of electricity, telecom and water services in developing countries: A systematic review , 2013 .

[51]  George Ofori Research on construction industry development at the crossroads , 1993 .

[52]  G. Scott,et al.  Using successful graduates to improve the quality of undergraduate engineering programmes , 2002 .

[53]  Sanjeev Kumar,et al.  Investigating computational models of development for the construction of shape and form , 2004 .

[54]  K. T. Odusami,et al.  Perceptions of Construction Professionals Concerning Important Skills of Effective Project Leaders , 2002 .

[55]  W. Duncan A GUIDE TO THE PROJECT MANAGEMENT BODY OF KNOWLEDGE , 1996 .

[56]  David Arditi,et al.  Cost overruns in public projects , 1985 .

[57]  Mark Shaurette,et al.  Establishing New Graduate Competencies: Purdue University's Construction Management Curriculum Restructuring , 2014 .

[58]  R. Daft,et al.  Across the Great Divide: Knowledge Creation and Transfer Between Practitioners and Academics , 2001 .

[59]  Sami Kärnä,et al.  Analysing customer satisfaction and quality in construction – the case of public and private customers , 2004 .

[60]  Ben F. Bigelow,et al.  An Evaluation of Factors for Retaining Female Students in Construction Management Programs , 2016 .

[61]  J. Ramalho-Santos,et al.  Cronbach's alpha: a tool for assessing the reliability of scales , 1999 .

[62]  Christine M. Fiori,et al.  Comparison of Industry Expectations and Student Perceptions of Knowledge and Skills Required for Construction Career Success , 2013 .