An ISM-ANP approach to identifying key agile factors in launching a new product into mass production

In order to gain a competitive advantage in the globalised environment, a company has to operate with a high level of agility in terms of responding quickly and flexibly to changes in competitive criteria, the market, and customer demands. Agility has become an important strategic factor in competition. When the design stage of an original equipment manufacturer (OEM)'s or original design manufacturer (ODM)'s product is completed, and it starts to enter the mass production stage, a number of uncertain factors are often encountered, which may delay the manufacturing process and lead to lost business opportunities. Focusing on this issue, the present research establishes a hybrid approach to discovering the critical agility factors when launching a new product into mass production. In this research, interpretive structure modelling (ISM) is first utilised to identify the interactive causal relationships of the employed agility factors. Further, an analytical network process (ANP) model is applied to obtain the importance weights of the agility criteria based on the dependence or feedback relationships among the factors obtained from the results of ISM. As a result, both a visualised causal relationship and a quantified representation of the critical agility criteria can be provided to aid managers in effective decision-making.

[1]  R. P. Mohanty,et al.  A fuzzy ANP-based approach to R&D project selection: A case study , 2005 .

[2]  Rick Dove,et al.  21st Century Manufacturing Enterprise Strategy: An Industry-Led View , 1991 .

[3]  T. L. Saaty,et al.  Decision making with dependence and feedback , 2001 .

[4]  Suresh P. Sethi,et al.  Flexibility in manufacturing: A survey , 1990 .

[5]  R. Handfield,et al.  Involving Suppliers in New Product Development , 1999 .

[6]  M. Christopher,et al.  Developing strategic partnerships in the supply chain: a practitioner perspective , 2000 .

[7]  J Prince,et al.  Combining lean and agile characteristics: Creation of virtual groups by enhanced production flow analysis , 2003 .

[8]  A. Chakrabarti,et al.  Innovation Speed: A Conceptual Model of Context, Antecedents, and Outcomes , 1996 .

[9]  Shaligram Pokharel,et al.  A hybrid approach using ISM and fuzzy TOPSIS for the selection of reverse logistics provider , 2009 .

[10]  Ravi Kathuria,et al.  Work force management practices for manufacturing flexibility , 1999 .

[11]  David Z. Zhang,et al.  Towards theory building in agile manufacturing strategies--Case studies of an agility taxonomy , 2011 .

[12]  Hossein Sharifi,et al.  A methodology for achieving agility in manufacturing organisations : An introduction , 1999 .

[13]  Joseph Sarkis,et al.  Analyzing organizational project alternatives for agile manufacturing processes: An analytical network approach , 1999 .

[14]  R. Nagel,et al.  Management, technology and agility: the emergence of a new era in manufacturing. , 2014 .

[15]  Rifat Gürcan Özdemir,et al.  A hybrid approach to concept selection through fuzzy analytic network process , 2009, Comput. Ind. Eng..

[16]  R. Nagel,et al.  Agile Competitors and Virtual Organizations: Strategies for Enriching the Customer , 1994 .

[17]  An-Yuan Chang,et al.  On the measurement of routing flexibility: A multiple attribute approach , 2007 .

[18]  Patricia M. Swafford A Model of Global Supply Chain Agility and its Impact on Competitive Performance , 2000 .

[19]  G. Kannan,et al.  Analysis of interactions of criteria and sub-criteria for the selection of supplier in the built-in-order supply chain environment , 2007 .

[20]  Felix T.S. Chan,et al.  Interactive selection model for supplier selection process: an analytical hierarchy process approach , 2003 .

[21]  R. DeVor,et al.  Agile manufacturing research: accomplishments and opportunities , 1997 .

[22]  Soung Hie Kim,et al.  Using analytic network process and goal programming for interdependent information system project selection , 2000, Comput. Oper. Res..

[23]  Ravi Shankar,et al.  An ISM approach for modelling the enablers of flexible manufacturing system: the case for India , 2008 .

[24]  F. Wynstra,et al.  Managing supplier involvement in new product development: a portfolio approach , 2000 .

[25]  Thomas F. Burgess,et al.  Making the Leap to Agility , 1994 .

[26]  Angappa Gunasekaran,et al.  Agile supply chain capabilities: Determinants of competitive objectives , 2004, Eur. J. Oper. Res..

[27]  J. Pinto,et al.  Critical Success Factors in R&D Projects , 1989 .

[28]  James Gao,et al.  A knowledge system to support manufacturing knowledge during preliminary design , 2007 .

[29]  William L. Berry,et al.  Approaches to mass customization: configurations and empirical validation , 2000 .

[30]  Hyunbo Cho,et al.  Enabling technologies of agile manufacturing and its related activities in Korea , 1996 .

[31]  Denis Royston Towill,et al.  Total cycle time compression and the agile supply chain , 1999 .

[32]  Cevriye Gencer,et al.  Analytic network process in supplier selection: A case study in an electronic firm , 2007 .

[33]  Glenn Johansson,et al.  Managing the design/environment interface: studies of integration mechanisms , 2007 .

[34]  Hossein Sharifi,et al.  Towards Theory Building in Agile Manufacturing Strategy—A Taxonomical Approach , 2007, IEEE Transactions on Engineering Management.

[35]  S. Deshmukh,et al.  Vendor Selection Using Interpretive Structural Modelling (ISM) , 1994 .

[36]  Alireza Aliahmadi,et al.  Identifying the cause and effect factors of agile NPD process with fuzzy DEMATEL method: the case of Iranian companies , 2009, J. Intell. Manuf..

[37]  Christopher M. McDermott,et al.  Training in CAD: an exploratory study of methods and benefits , 1995 .

[38]  A.Y. Chang On the measurement of labor flexibility , 2004, 2004 IEEE International Engineering Management Conference (IEEE Cat. No.04CH37574).

[39]  Shouhong Wang,et al.  Information technology enabled meta-management for virtual organizations , 2002 .

[40]  Madjid Tavana,et al.  A fuzzy group quality function deployment model for e-CRM framework assessment in agile manufacturing , 2011, Comput. Ind. Eng..

[41]  S. Deshmukh,et al.  Interpretive structural modelling of factors for improving competitiveness of SMEs , 2007 .

[42]  Seungwha Chung,et al.  Performance effects of partnership between manufacturers and suppliers for new product development: the supplier's standpoint , 2003 .

[43]  Z. Irani,et al.  Working towards agile manufacturing in the UK industry , 1999 .

[44]  P. Baker The design and operation of distribution centres within agile supply chains , 2008 .

[45]  R. Hämäläinen,et al.  The analytic network process in energy policy planning , 1986 .

[46]  William M. Fitzpatrick,et al.  Virtual Venturing and Entry Barriers: Redefining the Strategic Landscape , 2001 .

[47]  R. Cagliano,et al.  Lean, Agile and traditional supply: how do they impact manufacturing performance? , 2004 .

[48]  Robert J. Vokurka,et al.  The journey toward agility , 1998 .

[49]  Mustafa Yurdakul,et al.  Measuring long-term performance of a manufacturing firm using the Analytic Network Process (ANP) approach , 2003 .

[50]  Mohan M. Kumaraswamy,et al.  Predicting purchasing performance: The role of supplier development programs , 2003 .

[51]  Amir M. Hormozi,et al.  Agile manufacturing: the next logical step , 2001 .

[52]  Ravi Seethamraju,et al.  Influence of Enterprise Systems on Business Process Agility , 2006 .

[53]  Wei-Wen Wu,et al.  Selecting knowledge management strategies by using the analytic network process , 2007, Expert Syst. Appl..

[54]  Cheryl Gaimon,et al.  Flexibility and Pricing Decisions for High-Volume Products with Short Life Cycles , 1998 .

[55]  Les Tien-Shang Lee,et al.  The effects of team reflexivity and innovativeness on new product development performance , 2008, Ind. Manag. Data Syst..

[56]  Angappa Gunasekaran,et al.  Agile manufacturing: A framework for research and development , 1999 .

[57]  Nagesh N. Murthy,et al.  Achieving supply chain agility through IT integration and flexibility , 2008 .

[58]  Angappa Gunasekaran,et al.  AGILE MANUFACTURING: ENABLERS AND AN IMPLEMENTATION FRAMEWORK , 1998 .

[59]  R. Shankar,et al.  Modeling agility of supply chain , 2007 .

[60]  Z. Zhang,et al.  A methodology for achieving agility in manufacturing organisations , 2000 .

[61]  Thomas L. Saaty,et al.  Diagnosis with Dependent Symptoms: Bayes Theorem and the Analytic Hierarchy Process , 1998, Oper. Res..

[62]  D. Gerwin Manufacturing flexibility: a strategic perspective , 1993 .

[63]  Sandra Meredith,et al.  Journey towards agility: the agile wheel explored , 2000 .

[64]  Adrien Presley,et al.  R&D project selection using the analytic network process , 2002, IEEE Trans. Engineering Management.

[65]  S. R. Devadasan,et al.  Literature review on the agile manufacturing criteria , 2007 .

[66]  Angappa Gunasekaran,et al.  Agile manufacturing: A taxonomy of strategic and technological imperatives , 2002 .

[67]  Umut Rifat Tuzkaya,et al.  A fuzzy analytic network process based approach to transportation-mode selection between Turkey and Germany: A case study , 2008, Inf. Sci..

[68]  Hossein Sharifi,et al.  Agile manufacturing in practice ‐ Application of a methodology , 2001 .

[69]  E. Bottani Profile and enablers of agile companies: An empirical investigation , 2010 .

[70]  Karl T. Ulrich,et al.  The role of product architecture in the manufacturing firm , 2011 .

[71]  Yu-Cheng Lee,et al.  Structural approach to design user interface , 2010, Comput. Ind..

[72]  John N. Warfield,et al.  Toward Interpretation of Complex Structural Models , 1974, IEEE Trans. Syst. Man Cybern..

[73]  Danny Berry,et al.  Leagility: Integrating the lean and agile manufacturing paradigms in the total supply chain , 1999 .

[74]  M. Bohanec,et al.  The Analytic Hierarchy Process , 2004 .

[75]  Linda Moffat,et al.  Tools and teams: competing models of integrated product development project performance , 1998 .