Scheduling the production of rolling ingots: industrial context, model, and solution method
暂无分享,去创建一个
[1] Rolf H. Möhring,et al. Resource-constrained project scheduling: Notation, classification, models, and methods , 1999, Eur. J. Oper. Res..
[2] N. Trautmann. Anlagenbelegungsplanung in der Prozeßindustrie , 2001 .
[3] Norbert Trautmann,et al. Batch scheduling in process industries: an application of resource–constrained project scheduling , 2000, OR Spectr..
[4] Reha Uzsoy,et al. Scheduling a single batch processing machine with secondary resource constraints , 1998 .
[5] Peter Brucker,et al. Scheduling Algorithms , 1995 .
[6] Rolf H. Möhring,et al. Scheduling project networks with resource constraints and time windows , 1988 .
[7] Reha Uzsoy,et al. Scheduling batch processing machines with incompatible job families , 1995 .
[8] B. Fleischmann,et al. Erfahrungen mit einem Simulationsmodell in einer Aluminiumgießerei , 1985 .
[9] Chris N. Potts,et al. Scheduling with batching: A review , 2000, Eur. J. Oper. Res..
[10] I. Grossmann,et al. A decomposition approach for the scheduling of a steel plant production , 2001 .
[11] Klaus Neumann,et al. Project scheduling with inventory constraints , 2003, Math. Methods Oper. Res..
[12] Klaus Neumann,et al. Advanced production scheduling for batch plants in process industries , 2002, OR Spectr..
[13] Michael Pinedo,et al. Scheduling: Theory, Algorithms, and Systems , 1994 .
[14] Professor Dr. Klaus Neumann,et al. Project Scheduling with Time Windows and Scarce Resources , 2003, Springer Berlin Heidelberg.