INCREASE OF CAPACITY THROUGH OPTIMIZED TIMETABLING
暂无分享,去创建一个
[1] Rob M.P. Goverde,et al. Propagation of train delays in stations , 2002 .
[2] Leon W P Peeters,et al. Cyclic Railway Timetable Optimization , 2003 .
[3] Malachy Carey,et al. Testing schedule performance and reliability for train stations , 2000, J. Oper. Res. Soc..
[4] I A Hansen,et al. Hindrance Between Conflicting Train Movements At A Level Crossing , 2002 .
[5] Rob M.P. Goverde,et al. PERFORMANCE EVALUATION OF NETWORK TIMETABLES USING PETER , 2002 .
[6] Malachy Carey,et al. Scheduling and Platforming Trains at Busy Complex Stations , 2003 .
[7] I A Hansen,et al. Analysis of scheduled and real capacity utilisation at a major Dutch railway station , 2004 .
[8] Rob M.P. Goverde,et al. The Max-plus Algebra Approach To RailwayTimetable Design , 1998 .
[9] Richard J. Boucherie,et al. A solvable queueing network model for railway networks and its validation and applications for the Netherlands , 2002, Eur. J. Oper. Res..