Capacity development for post disaster reconstruction of the built environment

[1]  Bashar Nuseibeh,et al.  Requirements engineering: a roadmap , 2000, ICSE '00.

[2]  Mike Capra,et al.  Are Disaster Management Concepts Relevant in Developing Countries?: The Case of the 1999-2000 Mozambican Floods , 2001 .

[3]  Graham Tipple,et al.  Natural Disaster, Mitigation and Sustainability: The Case of Developing Countries , 2002 .

[4]  Ronald K. Mitchell,et al.  Toward a Theory of Stakeholder Identification and Salience: Defining the Principle of who and What Really Counts , 1997 .

[5]  R. Newcombe,et al.  From client to project stakeholders: a stakeholder mapping approach , 2003 .

[6]  Rachel Owen Ready for another year , 2007 .

[7]  Patricia M. Carrillo,et al.  Built‐in resilience to disasters: a pre‐emptive approach , 2007 .

[8]  James Olabode Bamidele Rotimi,et al.  Comparison between routine construction and post-disaster reconstruction with case studies from New Zealand , 2006 .

[9]  Donald E. Geis,et al.  By Design: The Disaster Resistant and Quality-of-Life Community , 2000 .

[10]  Peter M. Lawther Community involvement in post disaster re‐construction ‐ case study of the British red cross Maldives recovery program , 2009 .

[11]  Glenn Laverack,et al.  Evaluating community capacity: Visual representation and interpretation , 2006 .

[12]  M. Pardasani,et al.  Tsunami reconstruction and redevelopment in the Maldives , 2006 .

[13]  Andrew Price,et al.  Integrating disaster risk management into construction: a UK perspective , 2007 .

[14]  David J. Henderson,et al.  Role of Building Codes and Construction Standards in Windstorm Disaster Mitigation , 2008 .

[15]  Mark Pelling,et al.  Disaster risk, climate change and international development: scope for, and challenges to, integration. , 2006, Disasters.