Value Delivery through Product Offers: A Lean Leap in Multi-Storey Timber Housing Construction
暂无分享,去创建一个
[1] Stephen Emmitt,et al. The Value Universe: Defining a Value Based Approach to Lean Construction , 2005 .
[2] Hal Macomber,et al. Linguistic Action: Contributing to the Theory of Lean Construction , 2003 .
[3] R. Thomas,et al. THE IMPORTANCE OF PROJECT CULTURE IN ACHIEVING QUALITY OUTCOMES IN CONSTRUCTION , 2002 .
[4] Stephen Emmitt,et al. The client as a complex system , 2005 .
[5] Gregory A. Howell,et al. Signal Detection Theory: Enabling Work Near the Edge , 2003 .
[6] Carlos T. Formoso,et al. Client Requirement Management in Building Projects , 2003 .
[7] Carlos Torres Formoso,et al. Guidelines for the Improvement of Design, Procurement and Installation of Elevators Using Supply Chain Management Concepts , 2008 .
[8] Eric Johansen,et al. Understanding Lean Construction and How It Penetrates the Industry - A Comparison of the Dissemination of Lean , 2002 .
[9] Glenn Ballard,et al. ACTIVITY -BASED COSTING AND ITS APPLICATION TO LEAN CONSTRUCTION , 2001 .
[10] Gregory A. Howell,et al. CASE STUDY FOR WORK STRUCTURING: INSTALLATION OF METAL DOOR FRAMES , 2000 .
[11] R. Thomas,et al. QUALITY MANAGEMENT TOOLS FOR LEAN PRODUCTION - MOVING FROM ENFORCEMENT TO EMPOWERMENT , 2002 .
[12] Iris D. Tommelein,et al. Work Structuring to Achieve Integrated Product-Process Design , 2004 .
[13] Daniel T. Jones,et al. STRATEGIC APPLICATION OF LEAN THINKING , 1998 .
[14] Lauri Koskela,et al. Application of the New Production Philosophy to Construction , 1992 .
[15] Sven Bertelsen,et al. Lean Construction: Where Are We and How To Proceed? , 2004, Lean Construction Journal.
[16] Iris D. Tommelein,et al. Process Benefits From Use of Standard Products – Simulation Experiments Using the Pipe Spool Model , 2006 .
[17] Purdue Ect Team,et al. Lean Project Delivery System , 2007 .
[18] Anthony D. Songer,et al. Interplay of Project Complexity and Lean Production Methods , 2000 .
[19] Gregory A. Howell,et al. Workers at the Edge: Hazard Recognition and Action , 2003 .
[20] Glenn Ballard,et al. Implementing lean construction: Reducing inflow variation , 1997 .
[21] Nashwan Dawood,et al. Next generation of construction planning and control: The LEWIS approach , 2002 .
[22] James M. Morgan,et al. High performance product development: A systems approach to a lean product development process. , 2002 .
[23] Anders Björnfot,et al. Prefabrication: A Lean Strategy for Value Generation in Construction , 2006 .
[24] Nuno António,et al. Product-Process Development Simulation to Support Specialty Contractor Involvement in Early Design , 2001 .
[25] Iris D. Tommelein,et al. INTEGRATED PRODUCT-PROCESS DEVELOPMENT BY A LIGHT FIXTURE MANUFACTURER , 2001 .
[26] James P. Womack,et al. Lean Thinking: Banish Waste and Create Wealth in Your Corporation , 1996 .
[27] Gregory A. Howell,et al. WHAT IS LEAN CONSTRUCTION - 1999 , 1999 .
[28] Carlos Torres Formoso,et al. Planning the Product Development Process in Construction: An Exploratory Case Study , 2001 .
[29] Luis F. Alarcón,et al. DEVELOPING INCENTIVE STRATEGIES FOR IMPLEMENTATION OF LEAN CONSTRUCTION , 2002 .
[30] Iris D. Tommelein,et al. SIMULATION AS A TOOL FOR PRODUCTION SYSTEM DESIGN IN CONSTRUCTION , 2006 .
[31] Lucio Soibelman,et al. Generating Construction Knowledge with Knowledge Discovery in Databases , 2000 .
[32] Luis F. Alarcón,et al. COLLABORATIVE IMPLEMENTATION OF LEAN PLANNING SYSTEMS IN CHILEAN CONSTRUCTION COMPANIES , 2002 .
[33] Mohamed Mohamed Naim,et al. Selecting The Right Strategy To Meet Customer Requirements , 2000 .
[34] G. Howell,et al. Integrated Project Delivery An Example Of Relational Contracting , 2005 .
[35] E. Hirota,et al. Barriers to Management Innovations: Communicating Meanings , 2001 .
[36] Iris D. Tommelein,et al. Value Stream Mapping for Make-to-Order Products in a Job Shop Environment , 2005 .
[37] Iris D. Tommelein,et al. Investigation of Buffer Dynamics in Sheet Metal Ductwork Supply Chains , 2006 .
[38] Ariovaldo Denis Granja,et al. Target and Kaizen Costing in Construction , 2005 .
[39] Jian Zuo,et al. Project Culture within Construction Projects: A Literature Review , 2005 .
[40] Yupeng Luo,et al. Lean Principles for Pre-fabrication in Green Design-build (GDB) Projects , 2005 .
[41] Bill Curtis,et al. Process modeling , 1992, CACM.
[42] Carlos Torres Formoso,et al. The Importance of Commitments Management to the Integration of Make-to- Order Supply Chains in Construction Industry , 2006 .
[43] Iris D. Tommelein,et al. WorkMovePlan: Database for Distributed Planningand Coordination , 2000 .
[44] Luis F. Alarcón,et al. Achieving a Lean Design Process , 2000 .
[45] Glenn Ballard,et al. Implementing Lean Construction: Understanding and Action , 1998 .
[46] Gregory A. Howell,et al. WORKING NEAR THE EDGE: A NEW APPROACH TO CONSTRUCTION SAFETY , 2002 .
[47] Iris D. Tommelein,et al. REDUCING LEAD TIME FOR ELECTRICAL SWITCHGEAR , 2002 .
[48] Martin Fischer,et al. Case Study of the Implementation of the Lean Project Delivery System (LPDS) Using Virtual Building Technologies on a Large Healthcare Project , 2005 .
[49] Heng Li,et al. Development of a Practical Model of Partnering for Construction Projects , 2004 .
[50] Jeffrey K. Liker,et al. The Toyota way : 14 management principles from the world's greatest manufacturer , 2004 .
[51] Matilda Höök,et al. Customer value in lean prefabrication of housing considering both construction and manufacturing , 2006 .
[52] Anders Björnfot,et al. PRODUCT DESIGN FOR IMPROVED MATERIAL FLOW—A MULTI-STOREY TIMBER HOUSING PROJECT , 2005 .
[53] Michael Hammer,et al. Reengineering Work: Don’t Automate, Obliterate , 1990 .
[54] Lauri Koskela,et al. Improving Value Generation in the Design Process of Industrial Projects Using CAVT , 2006 .
[55] Carlos T. Formoso,et al. Towards a Common Language Between Lean Production and Safety Management , 2006 .
[56] Russell Kenley. Dispelling the Complexity Myth: Founding Lean Construction on Location-based Planning , 2005 .
[57] Gerhard Bosch,et al. Building chaos : an international comparison of deregulation in the construction industry , 2003 .
[58] Feniosky Peña-Mora,et al. Reliability and Stability Buffering Approach in Concurrent Design and Construction Projects , 2003 .
[59] Luis F. Alarcón,et al. Reducing Schedule in Repetitive Construction Projects , 2004 .
[60] Iris D. Tommelein,et al. Value stream analysis of a re-engineered construction supply chain , 2003 .
[61] Eric Johansen,et al. An experience of introducing last planner into a UK construction project , 2003 .
[62] Glenn Ballard,et al. Dynamic States of Project Purpose: Transitions From Customer Needs to Project Requirements - Implications for Adaptive Management , 2003 .
[63] Carlos T. Formoso,et al. Improving Performance Through Measurement: The Application of Lean Production and Organisational Learning Principles , 2000 .
[64] Lauri Koskela,et al. Understanding construction supply chains: a multiple theoretical approach to interorganizational relationships in construction , 2003 .
[65] A. Williamson. Target and kaizen costing , 1997 .
[66] M. Naim,et al. An innovative supply chain strategy for customized housing , 2003 .
[67] Jens Ove Riis,et al. Lean Project Management , 1993 .
[68] Sydney Nsw. School of Civil Engineering , 2007 .
[69] Sven Bertelsen,et al. COMPLEXITY – CONSTRUCTION IN A NEW PERSPECTIVE , 2003 .
[70] Raymond T. Aoieong,et al. The use of Process Cost Model (PCM) for measuring quality costs of construction projects: model testing , 2004 .
[71] Low Sui Pheng,et al. The application of JIT philosophy to construction: a case study in site layout , 1999 .
[72] Iris D. Tommelein,et al. Integrating design planning, schedule and control with Deplan , 2000 .
[73] Colin Robson,et al. Real World Research: A Resource for Social Scientists and Practitioner-Researchers , 1993 .
[74] Lia Buarque de Macedo Guimarães,et al. Safety and production: an integrated planning and control model , 2004 .
[75] Luis F. Alarcón,et al. Qualifying People to Support Lean Construction in Contractor Organizations , 2006 .
[76] Gregory A. Howell,et al. COMPETING CONSTRUCTION MANAGEMENT PARADIGMS , 2003 .
[77] Richard L. Tucker,et al. Is construction project planning really doing its job? A critical examination of focus, role and process , 1987 .
[78] Lauri Koskela,et al. An exploration towards a production theory and its application to construction , 2000 .
[79] José de Paula,et al. THE RELANTIONSHIP BETWEEN STRATEGY AND LEAN CONSTRUCTION , 2002 .
[80] Luis F. Alarcón,et al. Learning From Collaborative Benchmarking in the Construction Industry , 2001 .
[81] Glenn Ballard,et al. The St. Olaf College Fieldhouse Project: A Case Study in Designing to Target Cost , 2004 .
[82] Charles N. Calvano,et al. Systems engineering in an age of complexity , 2004 .
[83] Thomas Olofsson,et al. Transparency and Cooperation—Essential Factors of Lean Contracting , 2005 .
[84] Clarice Menezes Degani,et al. Environmental Performance and Lean Construction Concepts - Can We Talk About a Clean Construction , 2002 .
[85] Luis Fernando Alarcon-Cardenas,et al. A Production Planning Support System for Construction Projects , 2003 .
[86] Luis F. Alarcón,et al. ORGANIZING TO INTRODUCE LEAN PRACTICES IN CONSTRUCTION COMPANIES , 2001 .
[87] Angela Lee,et al. An IT Tool for Managing the Product Development Process , 2003 .
[88] Herman Glenn Ballard,et al. THE LAST PLANNER SYSTEM OF PRODUCTION CONTROL , 2000 .
[89] Nashwan Dawood,et al. NEXT GENERATION OF CONSTRUCTION PLANNING AND CONTROL SYSTEM : THE LEWIS APPROACH , 2002 .
[90] Iris D. Tommelein,et al. Application of Tolerance Analysis and Allocation to Work Structuring: Partition Wall Case , 2003 .
[91] Stephen Emmitt. Learning to Think and Detail From First (Leaner) Principles , 2003 .
[92] Ylva Sardén,et al. Complexity and learning in timber frame housing : the case of a solid wood pilot project , 2005 .
[93] Lauri Koskela,et al. Lean Production in Construction , 1993 .
[94] Alistair G.F. Gibb,et al. What Should You Really Measure If You Want to Compare Pre-fabrication with Traditional Construction? , 2005 .
[95] Luis F. Alarcón,et al. Achieving Lean Design Process: Improvement Methodology , 2002 .
[96] Lauri Koskela,et al. Understanding construction supply chains: an alternative interpretation , 2001 .
[97] Ype Cuperus,et al. Open Building/Lean Construction Evaluation of a Case in Brazil , 2005 .
[98] Gul Polat,et al. Waste in Turkish Construction: Need for Lean Construction Techniques , 2004 .
[99] Ariovaldo Denis Granja,et al. Combining Value Stream and Process Levels Analysis for Continuous Flow Implementation in Construction , 2005 .
[100] Matt Syal,et al. Manufactured Housing Construction Value Using the Analytical Hierarchy Process , 2004 .
[101] Carlos Torres Formoso,et al. The Role of Production System Design in the Management of Complex Projects , 2006 .
[102] James E. Diekmann,et al. Measuring Lean Conformance , 2003 .
[103] Lauri Koskela,et al. Moving-on — beyond lean thinking , 2004 .
[104] Carlos T. Formoso,et al. The Design of Production Systems for Low-Income Housing Projects , 2004 .
[105] Gregory A. Howell,et al. Production System Design in Construction , 2001 .
[106] Nick Oliver,et al. Lean Production Practices: International Comparisons in the Auto Components Industry1 , 1996 .
[107] Greg Howell,et al. Implementing Lean Construction: Stabilizing Work Flow , 1997 .
[108] Dag Sander,et al. Experience and Results From Implementing Lean Construction in a Large Danish Contracting Firm , 2003 .
[109] Iris D. Tommelein,et al. VALUE STREAM ANALYSIS OF CONSTRUCTION SUPPLY CHAINS: CASE STUDY ON PIPE SUPPORTS USED IN POWER PLANTS , 2002 .
[110] H. Levin. SYSTEMATIC EVALUATION AND ASSESSMENT OF BUILDING ENVIRONMENTAL PERFORMANCE (SEABEP) , 1997 .
[111] Mary Hardie,et al. Culture of Quality and the Australian Construction Industry , 2005 .
[112] Kerry London,et al. The development of a neo-industrial organisation methodology for describing and comparing construction supply chains , 2000 .
[113] Stuart D. Green,et al. Lean construction: arenas of enactment, models of diffusion and the meaning of ‘leanness’ , 2005 .
[114] Glenn Ballard,et al. An application of lean concepts and techniques to precast concrete fabrication , 2002 .
[115] Steven Davis,et al. Lessons Learnt in Developing Effective Performance Measures for Construction Safety Management , 2004 .
[116] T Olofsson,et al. Process and information flow in mass customisation of multi-story housing , 2004 .
[117] Robert B. Pojasek. Mapping information flow through the production process , 2004 .
[118] Iris D. Tommelein,et al. Contribution of Specialty Contractor Knowledge to Early Design , 2000 .
[119] Thomas Olofsson,et al. Relational contracting and process design promoting cooperation , 2006 .
[120] Stuart D. Green. The future of lean construction: a brave new world , 2000 .
[121] Carlos Torres Formoso,et al. A Quantitative Analysis of Data Collected From the Last Planner System in Brazil , 2006 .