Value Delivery through Product Offers: A Lean Leap in Multi-Storey Timber Housing Construction

Among large Swedish contractors there is currently a specialization trend towards an increased use of prefabrication and complete systems in housing construction. The Lean Construction development ...

[1]  Stephen Emmitt,et al.  The Value Universe: Defining a Value Based Approach to Lean Construction , 2005 .

[2]  Hal Macomber,et al.  Linguistic Action: Contributing to the Theory of Lean Construction , 2003 .

[3]  R. Thomas,et al.  THE IMPORTANCE OF PROJECT CULTURE IN ACHIEVING QUALITY OUTCOMES IN CONSTRUCTION , 2002 .

[4]  Stephen Emmitt,et al.  The client as a complex system , 2005 .

[5]  Gregory A. Howell,et al.  Signal Detection Theory: Enabling Work Near the Edge , 2003 .

[6]  Carlos T. Formoso,et al.  Client Requirement Management in Building Projects , 2003 .

[7]  Carlos Torres Formoso,et al.  Guidelines for the Improvement of Design, Procurement and Installation of Elevators Using Supply Chain Management Concepts , 2008 .

[8]  Eric Johansen,et al.  Understanding Lean Construction and How It Penetrates the Industry - A Comparison of the Dissemination of Lean , 2002 .

[9]  Glenn Ballard,et al.  ACTIVITY -BASED COSTING AND ITS APPLICATION TO LEAN CONSTRUCTION , 2001 .

[10]  Gregory A. Howell,et al.  CASE STUDY FOR WORK STRUCTURING: INSTALLATION OF METAL DOOR FRAMES , 2000 .

[11]  R. Thomas,et al.  QUALITY MANAGEMENT TOOLS FOR LEAN PRODUCTION - MOVING FROM ENFORCEMENT TO EMPOWERMENT , 2002 .

[12]  Iris D. Tommelein,et al.  Work Structuring to Achieve Integrated Product-Process Design , 2004 .

[13]  Daniel T. Jones,et al.  STRATEGIC APPLICATION OF LEAN THINKING , 1998 .

[14]  Lauri Koskela,et al.  Application of the New Production Philosophy to Construction , 1992 .

[15]  Sven Bertelsen,et al.  Lean Construction: Where Are We and How To Proceed? , 2004, Lean Construction Journal.

[16]  Iris D. Tommelein,et al.  Process Benefits From Use of Standard Products – Simulation Experiments Using the Pipe Spool Model , 2006 .

[17]  Purdue Ect Team,et al.  Lean Project Delivery System , 2007 .

[18]  Anthony D. Songer,et al.  Interplay of Project Complexity and Lean Production Methods , 2000 .

[19]  Gregory A. Howell,et al.  Workers at the Edge: Hazard Recognition and Action , 2003 .

[20]  Glenn Ballard,et al.  Implementing lean construction: Reducing inflow variation , 1997 .

[21]  Nashwan Dawood,et al.  Next generation of construction planning and control: The LEWIS approach , 2002 .

[22]  James M. Morgan,et al.  High performance product development: A systems approach to a lean product development process. , 2002 .

[23]  Anders Björnfot,et al.  Prefabrication: A Lean Strategy for Value Generation in Construction , 2006 .

[24]  Nuno António,et al.  Product-Process Development Simulation to Support Specialty Contractor Involvement in Early Design , 2001 .

[25]  Iris D. Tommelein,et al.  INTEGRATED PRODUCT-PROCESS DEVELOPMENT BY A LIGHT FIXTURE MANUFACTURER , 2001 .

[26]  James P. Womack,et al.  Lean Thinking: Banish Waste and Create Wealth in Your Corporation , 1996 .

[27]  Gregory A. Howell,et al.  WHAT IS LEAN CONSTRUCTION - 1999 , 1999 .

[28]  Carlos Torres Formoso,et al.  Planning the Product Development Process in Construction: An Exploratory Case Study , 2001 .

[29]  Luis F. Alarcón,et al.  DEVELOPING INCENTIVE STRATEGIES FOR IMPLEMENTATION OF LEAN CONSTRUCTION , 2002 .

[30]  Iris D. Tommelein,et al.  SIMULATION AS A TOOL FOR PRODUCTION SYSTEM DESIGN IN CONSTRUCTION , 2006 .

[31]  Lucio Soibelman,et al.  Generating Construction Knowledge with Knowledge Discovery in Databases , 2000 .

[32]  Luis F. Alarcón,et al.  COLLABORATIVE IMPLEMENTATION OF LEAN PLANNING SYSTEMS IN CHILEAN CONSTRUCTION COMPANIES , 2002 .

[33]  Mohamed Mohamed Naim,et al.  Selecting The Right Strategy To Meet Customer Requirements , 2000 .

[34]  G. Howell,et al.  Integrated Project Delivery An Example Of Relational Contracting , 2005 .

[35]  E. Hirota,et al.  Barriers to Management Innovations: Communicating Meanings , 2001 .

[36]  Iris D. Tommelein,et al.  Value Stream Mapping for Make-to-Order Products in a Job Shop Environment , 2005 .

[37]  Iris D. Tommelein,et al.  Investigation of Buffer Dynamics in Sheet Metal Ductwork Supply Chains , 2006 .

[38]  Ariovaldo Denis Granja,et al.  Target and Kaizen Costing in Construction , 2005 .

[39]  Jian Zuo,et al.  Project Culture within Construction Projects: A Literature Review , 2005 .

[40]  Yupeng Luo,et al.  Lean Principles for Pre-fabrication in Green Design-build (GDB) Projects , 2005 .

[41]  Bill Curtis,et al.  Process modeling , 1992, CACM.

[42]  Carlos Torres Formoso,et al.  The Importance of Commitments Management to the Integration of Make-to- Order Supply Chains in Construction Industry , 2006 .

[43]  Iris D. Tommelein,et al.  WorkMovePlan: Database for Distributed Planningand Coordination , 2000 .

[44]  Luis F. Alarcón,et al.  Achieving a Lean Design Process , 2000 .

[45]  Glenn Ballard,et al.  Implementing Lean Construction: Understanding and Action , 1998 .

[46]  Gregory A. Howell,et al.  WORKING NEAR THE EDGE: A NEW APPROACH TO CONSTRUCTION SAFETY , 2002 .

[47]  Iris D. Tommelein,et al.  REDUCING LEAD TIME FOR ELECTRICAL SWITCHGEAR , 2002 .

[48]  Martin Fischer,et al.  Case Study of the Implementation of the Lean Project Delivery System (LPDS) Using Virtual Building Technologies on a Large Healthcare Project , 2005 .

[49]  Heng Li,et al.  Development of a Practical Model of Partnering for Construction Projects , 2004 .

[50]  Jeffrey K. Liker,et al.  The Toyota way : 14 management principles from the world's greatest manufacturer , 2004 .

[51]  Matilda Höök,et al.  Customer value in lean prefabrication of housing considering both construction and manufacturing , 2006 .

[52]  Anders Björnfot,et al.  PRODUCT DESIGN FOR IMPROVED MATERIAL FLOW—A MULTI-STOREY TIMBER HOUSING PROJECT , 2005 .

[53]  Michael Hammer,et al.  Reengineering Work: Don’t Automate, Obliterate , 1990 .

[54]  Lauri Koskela,et al.  Improving Value Generation in the Design Process of Industrial Projects Using CAVT , 2006 .

[55]  Carlos T. Formoso,et al.  Towards a Common Language Between Lean Production and Safety Management , 2006 .

[56]  Russell Kenley Dispelling the Complexity Myth: Founding Lean Construction on Location-based Planning , 2005 .

[57]  Gerhard Bosch,et al.  Building chaos : an international comparison of deregulation in the construction industry , 2003 .

[58]  Feniosky Peña-Mora,et al.  Reliability and Stability Buffering Approach in Concurrent Design and Construction Projects , 2003 .

[59]  Luis F. Alarcón,et al.  Reducing Schedule in Repetitive Construction Projects , 2004 .

[60]  Iris D. Tommelein,et al.  Value stream analysis of a re-engineered construction supply chain , 2003 .

[61]  Eric Johansen,et al.  An experience of introducing last planner into a UK construction project , 2003 .

[62]  Glenn Ballard,et al.  Dynamic States of Project Purpose: Transitions From Customer Needs to Project Requirements - Implications for Adaptive Management , 2003 .

[63]  Carlos T. Formoso,et al.  Improving Performance Through Measurement: The Application of Lean Production and Organisational Learning Principles , 2000 .

[64]  Lauri Koskela,et al.  Understanding construction supply chains: a multiple theoretical approach to interorganizational relationships in construction , 2003 .

[65]  A. Williamson Target and kaizen costing , 1997 .

[66]  M. Naim,et al.  An innovative supply chain strategy for customized housing , 2003 .

[67]  Jens Ove Riis,et al.  Lean Project Management , 1993 .

[68]  Sydney Nsw School of Civil Engineering , 2007 .

[69]  Sven Bertelsen,et al.  COMPLEXITY – CONSTRUCTION IN A NEW PERSPECTIVE , 2003 .

[70]  Raymond T. Aoieong,et al.  The use of Process Cost Model (PCM) for measuring quality costs of construction projects: model testing , 2004 .

[71]  Low Sui Pheng,et al.  The application of JIT philosophy to construction: a case study in site layout , 1999 .

[72]  Iris D. Tommelein,et al.  Integrating design planning, schedule and control with Deplan , 2000 .

[73]  Colin Robson,et al.  Real World Research: A Resource for Social Scientists and Practitioner-Researchers , 1993 .

[74]  Lia Buarque de Macedo Guimarães,et al.  Safety and production: an integrated planning and control model , 2004 .

[75]  Luis F. Alarcón,et al.  Qualifying People to Support Lean Construction in Contractor Organizations , 2006 .

[76]  Gregory A. Howell,et al.  COMPETING CONSTRUCTION MANAGEMENT PARADIGMS , 2003 .

[77]  Richard L. Tucker,et al.  Is construction project planning really doing its job? A critical examination of focus, role and process , 1987 .

[78]  Lauri Koskela,et al.  An exploration towards a production theory and its application to construction , 2000 .

[79]  José de Paula,et al.  THE RELANTIONSHIP BETWEEN STRATEGY AND LEAN CONSTRUCTION , 2002 .

[80]  Luis F. Alarcón,et al.  Learning From Collaborative Benchmarking in the Construction Industry , 2001 .

[81]  Glenn Ballard,et al.  The St. Olaf College Fieldhouse Project: A Case Study in Designing to Target Cost , 2004 .

[82]  Charles N. Calvano,et al.  Systems engineering in an age of complexity , 2004 .

[83]  Thomas Olofsson,et al.  Transparency and Cooperation—Essential Factors of Lean Contracting , 2005 .

[84]  Clarice Menezes Degani,et al.  Environmental Performance and Lean Construction Concepts - Can We Talk About a Clean Construction , 2002 .

[85]  Luis Fernando Alarcon-Cardenas,et al.  A Production Planning Support System for Construction Projects , 2003 .

[86]  Luis F. Alarcón,et al.  ORGANIZING TO INTRODUCE LEAN PRACTICES IN CONSTRUCTION COMPANIES , 2001 .

[87]  Angela Lee,et al.  An IT Tool for Managing the Product Development Process , 2003 .

[88]  Herman Glenn Ballard,et al.  THE LAST PLANNER SYSTEM OF PRODUCTION CONTROL , 2000 .

[89]  Nashwan Dawood,et al.  NEXT GENERATION OF CONSTRUCTION PLANNING AND CONTROL SYSTEM : THE LEWIS APPROACH , 2002 .

[90]  Iris D. Tommelein,et al.  Application of Tolerance Analysis and Allocation to Work Structuring: Partition Wall Case , 2003 .

[91]  Stephen Emmitt Learning to Think and Detail From First (Leaner) Principles , 2003 .

[92]  Ylva Sardén,et al.  Complexity and learning in timber frame housing : the case of a solid wood pilot project , 2005 .

[93]  Lauri Koskela,et al.  Lean Production in Construction , 1993 .

[94]  Alistair G.F. Gibb,et al.  What Should You Really Measure If You Want to Compare Pre-fabrication with Traditional Construction? , 2005 .

[95]  Luis F. Alarcón,et al.  Achieving Lean Design Process: Improvement Methodology , 2002 .

[96]  Lauri Koskela,et al.  Understanding construction supply chains: an alternative interpretation , 2001 .

[97]  Ype Cuperus,et al.  Open Building/Lean Construction Evaluation of a Case in Brazil , 2005 .

[98]  Gul Polat,et al.  Waste in Turkish Construction: Need for Lean Construction Techniques , 2004 .

[99]  Ariovaldo Denis Granja,et al.  Combining Value Stream and Process Levels Analysis for Continuous Flow Implementation in Construction , 2005 .

[100]  Matt Syal,et al.  Manufactured Housing Construction Value Using the Analytical Hierarchy Process , 2004 .

[101]  Carlos Torres Formoso,et al.  The Role of Production System Design in the Management of Complex Projects , 2006 .

[102]  James E. Diekmann,et al.  Measuring Lean Conformance , 2003 .

[103]  Lauri Koskela,et al.  Moving-on — beyond lean thinking , 2004 .

[104]  Carlos T. Formoso,et al.  The Design of Production Systems for Low-Income Housing Projects , 2004 .

[105]  Gregory A. Howell,et al.  Production System Design in Construction , 2001 .

[106]  Nick Oliver,et al.  Lean Production Practices: International Comparisons in the Auto Components Industry1 , 1996 .

[107]  Greg Howell,et al.  Implementing Lean Construction: Stabilizing Work Flow , 1997 .

[108]  Dag Sander,et al.  Experience and Results From Implementing Lean Construction in a Large Danish Contracting Firm , 2003 .

[109]  Iris D. Tommelein,et al.  VALUE STREAM ANALYSIS OF CONSTRUCTION SUPPLY CHAINS: CASE STUDY ON PIPE SUPPORTS USED IN POWER PLANTS , 2002 .

[110]  H. Levin SYSTEMATIC EVALUATION AND ASSESSMENT OF BUILDING ENVIRONMENTAL PERFORMANCE (SEABEP) , 1997 .

[111]  Mary Hardie,et al.  Culture of Quality and the Australian Construction Industry , 2005 .

[112]  Kerry London,et al.  The development of a neo-industrial organisation methodology for describing and comparing construction supply chains , 2000 .

[113]  Stuart D. Green,et al.  Lean construction: arenas of enactment, models of diffusion and the meaning of ‘leanness’ , 2005 .

[114]  Glenn Ballard,et al.  An application of lean concepts and techniques to precast concrete fabrication , 2002 .

[115]  Steven Davis,et al.  Lessons Learnt in Developing Effective Performance Measures for Construction Safety Management , 2004 .

[116]  T Olofsson,et al.  Process and information flow in mass customisation of multi-story housing , 2004 .

[117]  Robert B. Pojasek Mapping information flow through the production process , 2004 .

[118]  Iris D. Tommelein,et al.  Contribution of Specialty Contractor Knowledge to Early Design , 2000 .

[119]  Thomas Olofsson,et al.  Relational contracting and process design promoting cooperation , 2006 .

[120]  Stuart D. Green The future of lean construction: a brave new world , 2000 .

[121]  Carlos Torres Formoso,et al.  A Quantitative Analysis of Data Collected From the Last Planner System in Brazil , 2006 .