Comparative analysis of group scheduling heuristics in a flow shop cellular system

Investigates group scheduling heuristics in a flow shop cellular system with two types of order shipment environment: permitted early shipment (PES) and forbidden early shipment (FES). Once an order is completed in the PES environment, it leaves the system without delay. In the FES environment, however, the suppliers must deliver materials to the system on a just‐in‐time basis; and a completed order cannot leave the system earlier than the customer has specified. The FES environment therefore captures many of the features of the currently popular just‐in‐time (JIT) approach to manufacturing. Examines shop factors such as the order shipment environment, demand pattern variability, and order release policy. Shows that the performance of heuristics in the FES environment differs from their performance in the PES environment, except for tardiness‐related measures. Identifies the best performing heuristics, which can provide guidance for schedulers or decision makers in the selection of preferable heuristics.

[1]  Gary D. Scudder,et al.  Use of the net present value criterion in a random job shop where early shipments are forbidden , 1990 .

[2]  Warren W. Fisher,et al.  Due Date Assignment, Job Order Release, and Sequencing Interaction in Job Shop Scheduling* , 1992 .

[3]  A. Alan B. Pritsker,et al.  Introduction to simulation and SLAM II , 1979 .

[4]  Stephen R. Lawrence Scheduling a single machine to maximize net present value , 1991 .

[5]  John J. Kanet,et al.  Manufacturing systems with forbidden early shipment: implications for choice of scheduling rules , 1990 .

[6]  Barbara B. Flynn Repetitive lots: The use of a sequence-dependent set-up time scheduling procedure in group technology and traditional shops , 1987 .

[7]  Asoo J. Vakharia,et al.  Job and Family Scheduling of a Flow-Line Manufacturing Cell: A Simulation Study , 1991 .

[8]  John J. Kanet,et al.  Open Order Rescheduling in Job Shops with Demand Uncertainty: A Simulation Study , 1988 .

[9]  J. Kleijnen Statistical tools for simulation practitioners , 1986 .

[10]  Farzad Mahmoodi,et al.  An investigation of dynamic group scheduling heuristics in a job shop manufacturing cell , 1990 .

[11]  Patrick R. Philipoom,et al.  Sequencing rules and due date setting procedures in flow line cells with family setups , 1991 .

[12]  John J. Kankt,et al.  Manufacturing systems with forbidden early order departure , 1984 .

[13]  Farzad Mahmoodi,et al.  Dynamic Group Scheduling Heuristics in a Flow-through Cell Environment* , 1992 .

[14]  William L. Maxwell,et al.  Theory of scheduling , 1967 .

[15]  Gary D. Scudder,et al.  The use of value-based priorities when early shipments are forbidden , 1989 .

[16]  Gary D. Scudder,et al.  Application of the Net Present Value Criterion in Random and Flow Shop Scheduling , 1989 .

[17]  Nancy Lea Hyer,et al.  Cellular manufacturing in the U.S. industry: a survey of users , 1989 .

[18]  Gary D. Scudder,et al.  Scheduling rule selection for the forbidden early shipment environment: a comparison of economic objectives , 1992 .

[19]  Sunder Kekre,et al.  SCHED-STAR A PRICE-BASED SHOP SCHEDULING MODULE , 1988 .

[20]  T. J. Greene,et al.  A review of cellular manufacturing assumptions, advantages and design techniques , 1984 .

[21]  Gary D. Scudder,et al.  Sequencing with Earliness and Tardiness Penalties: A Review , 1990, Oper. Res..

[22]  Averill M. Law,et al.  Simulation Modeling and Analysis , 1982 .

[23]  John J. Kanet,et al.  Manufacturing systems with forbidden early shipment: Implications for setting manufacturing lead times , 1989 .