Scheduling air traffic controllers at the remote tower center

Remote Tower Service (RTS) is one of the technological and operational solutions delivered for deployment by the Single European Sky ATM Research (SESAR) Programme. This new concept fundamentally changes how operators provide Air Traffic Services, as it becomes possible to control several airports from a single remote center. In such settings an air traffic controller works at a so-called “multiple position” at the Remote Tower Center (RTC), which means that he/she can handle two or more airports from one Remote Tower Module (controller working position). In this paper, we present an optimization framework designed for automation of staff planning at the RTC. We highlight the problems experienced with real airport flight schedules, and present optimal shift assignments for five Swedish airports that were chosen for remote operation.

[1]  Maik Friedrich,et al.  The Evaluation of Remote Tower Visual Assistance System in Preparation of Two Design Concepts , 2017, HCI.

[2]  Anne Papenfuss,et al.  ATC-Monitoring When One Controller Operates Two Airports , 2011 .

[3]  Astrid Oehme,et al.  Distant air traffic control for regional airports , 2010, IFAC HMS.

[4]  Frank Morlang,et al.  High-fidelity human-in-the-loop simulations as one step towards remote control of regional airports:A preliminary study , 2010 .

[5]  Hartmut Fricke,et al.  Functional hazard analysis of virtual control towers , 2010, IFAC HMS.

[6]  Christiane Schmidt,et al.  Configuration and Planning of the Remote TowerModules in a Remote Tower Center , 2016 .

[7]  Alice Gross,et al.  Challenges for the communication environment and communication concept for remote airport traffic control centres , 2010, IFAC HMS.

[8]  Richard Conniss,et al.  A Survey on Constructing Rosters for Air Traffic Controllers , 2015, 2015 International Conference on Intelligent Networking and Collaborative Systems.

[9]  Mirko Stojadinovic Air Traffic Controller Shift Scheduling by Reduction to CSP, SAT and SAT-Related Problems , 2014, CP.

[10]  Hendrik Van Landeghem,et al.  The State of the Art of Nurse Rostering , 2004, J. Sched..

[11]  Tone Magister,et al.  Effect of seasonal traffic variability on the performance of air navigation service providers , 2012 .

[12]  Andrew J. Cook,et al.  Controller time and delay costs - a trade-off analysis , 2015 .

[13]  Tomas Lidén,et al.  Resource considerations for integrated planning of railway traffic and maintenance windows , 2018, J. Rail Transp. Plan. Manag..

[14]  Anne Papenfuss,et al.  The Role of Workload for Work Organization in a Remote Tower Control Center , 2012 .

[15]  Pierre Flener,et al.  Automatic Airspace Sectorisation: A Survey , 2013, ArXiv.

[16]  Laurence A. Wolsey,et al.  Production Planning by Mixed Integer Programming , 2010 .

[17]  Haitao Li,et al.  Scheduling projects with multi-skilled personnel by a hybrid MILP/CP benders decomposition algorithm , 2009, J. Sched..

[18]  Anne Papenfuss,et al.  Assessing operational validity of remote tower control in high-fidelity tower simulation , 2010, IFAC HMS.

[19]  Sebastian Schier,et al.  Visual scanning in an air traffic control tower – A simulation study , 2015 .

[20]  Mauro Birattari,et al.  An effective hybrid algorithm for university course timetabling , 2006, J. Sched..

[21]  Gonzalo Tobaruela Arnedo A framework to assess the ability of automation to deliver capacity targets in European airspace , 2015 .

[22]  Richard Conniss,et al.  Scheduling air traffic controllers , 2014 .

[23]  Anne Papenfuss,et al.  Head up only — A design concept to enable multiple remote tower operations , 2016, 2016 IEEE/AIAA 35th Digital Avionics Systems Conference (DASC).