A prediction method of building seismic loss based on BIM and FEMA P-58
暂无分享,去创建一个
Yi Li | Zhen Xu | Xinzheng Lu | Zongcai Zhang | Yongjia Xu | Huazhen Zhang | Zhen Xu | Huazhen Zhang | Xinzheng Lu | Yi Li | Yongjia Xu | Zongcai Zhang
[1] Zhen Xu,et al. Application of the FEMA-P58 methodology for regional earthquake loss prediction , 2016, Natural Hazards.
[2] Zhiliang Ma,et al. Semi-automatic and specification-compliant cost estimation for tendering of building projects based on IFC data of design model , 2013 .
[3] Saeed Karshenas,et al. A Semantic Web Service Approach to Construction Cost Estimating , 2013 .
[4] Xianbo Zhao,et al. A scientometric review of global BIM research: Analysis and visualization , 2017 .
[5] Stefano Pampanin,et al. Repair Costs of Existing RC Buildings Damaged by the L'Aquila Earthquake and Comparison with FEMA P-58 Predictions , 2017 .
[6] Stephanie E. Chang,et al. Understanding post-earthquake decisions on multi-storey concrete buildings in Christchurch, New Zealand , 2017, Bulletin of Earthquake Engineering.
[7] T. Y. Yang,et al. Performance Evaluation of Seismic Force–Resisting Systems for Low-Rise Steel Buildings in Canada , 2015 .
[8] Andrea Prota,et al. Post-earthquake reconstruction: A study on the factors influencing demolition decisions after 2009 L’Aquila earthquake , 2018 .
[9] Martin S. Williams,et al. Seismic performance assessment of Eurocode 8-compliant concentric braced frame buildings using FEMA P-58 , 2018 .
[10] Vamvatsikos Dimitrios,et al. Damage Assessment, Cost Estimating, and Scheduling for Post-Earthquake Building Rehabilitation Using BIM , 2014 .
[11] Song Wu,et al. Application and extension of the IFC standard in construction cost estimating for tendering in China , 2011 .
[12] Burcu Akinci,et al. Building Information Modeling (BIM) application framework: The process of expanding from 3D to computable nD , 2014 .
[13] Daniele Perrone,et al. Automated seismic design of non-structural elements with Building Information Modelling , 2017 .
[14] T. Y. Yang,et al. Detailed Seismic Performance Assessment of High-Value-Contents Laboratory Facility , 2015 .
[15] Zhiliang Ma,et al. Ontology- and freeware-based platform for rapid development of BIM applications with reasoning support , 2017, Automation in Construction.
[16] Jung-Ho Yu,et al. BIM and ontology-based approach for building cost estimation , 2014 .
[17] Kathleen J. Tierney,et al. Business Impacts of the Northridge Earthquake , 1997 .
[18] Ken'ichi Kawaguchi. Damage to Non-Structural Components in Large Rooms by the Japan Earthquake , 2012 .
[19] Dimitrios Vamvatsikos,et al. A BIM-based framework for forecasting and visualizing seismic damage, cost and time to repair , 2010 .
[20] Mohamed Al-Hussein,et al. Ontology-based semantic approach for construction-oriented quantity take-off from BIM models in the light-frame building industry , 2016, Adv. Eng. Informatics.
[21] Raja R. A. Issa,et al. Quantitative evaluation of the BIM-assisted construction detailed cost estimates , 2010, J. Inf. Technol. Constr..
[22] Hong Guan,et al. Post-earthquake fire simulation considering overall seismic damage of sprinkler systems based on BIM and FEMA P-58 , 2018 .
[23] Rajesh P. Dhakal,et al. DAMAGE TO NON-STRUCTURAL COMPONENTS AND CONTENTS IN 2010 DARFIELD EARTHQUAKE , 2010 .
[24] Zhiliang Ma,et al. Formalized Representation of Specifications for Construction Cost Estimation by Using Ontology , 2016, Comput. Aided Civ. Infrastructure Eng..