Monte Carlo Simulation Approach to Support Alliance Team Selection
暂无分享,去创建一个
[1] Tony Baxendale,et al. Construction resource models by Monte Carlo simulation , 1984 .
[2] John Messner,et al. Comparing procurement methods for design-build projects , 2006 .
[3] Keith R. Molenaar,et al. Engineering The Procurement Phase to Achieve Best Value , 2003 .
[4] Talal Abi-Karam. Design/build selection process : Art or science? , 2005 .
[5] Ali Touran,et al. Modeling Cost Escalation in Large Infrastructure Projects , 2006 .
[6] Abdullah M. Alsugair. Framework for Evaluating Bids of Construction Contractors , 1999 .
[7] Ekambaram Palaneeswaran,et al. Targeting optimum value in public sector projects through “best value”‐focused contractor selection , 2003 .
[8] Ekambaram Palaneeswaran,et al. Contractor Selection for Design/Build Projects , 2000 .
[9] Mark Konchar,et al. Comparison of U.S. Project Delivery Systems , 1998 .
[10] W. Edward Back,et al. Monte Carlo Simulation as Tool for Process Reengineering , 1995 .
[11] B. McCabe. Monte Carlo simulation for schedule risks , 2003, Proceedings of the 2003 Winter Simulation Conference, 2003..