Cost Development Over-time at Construction Planning Phase: Empirical Evidence from Norwegian Construction Projects☆
暂无分享,去创建一个
[1] Lester A Hoel,et al. Highway Project Cost Estimating Methods used in the Planning Stage of Project Development , 2001 .
[2] Knut Samset. Projects, Their Quality at Entry and Challenges in the Front-end Phase , 2009 .
[3] Søren L. Buhl,et al. What Causes Cost Overrun in Transport Infrastructure Projects? , 2004, 1304.4476.
[4] Peter Lundman,et al. Cost management for underground infrastructure projects: a case study on cost increase and its causes , 2011 .
[5] Guru Prakash Prabhakar,et al. Culture and Conflict Management Style of International Project Managers , 2009 .
[6] Alexia A. Nalewaik,et al. Challenges Reporting Project Costs and Risks to Owner Decisionmakers , 2009 .
[7] Hans Lind,et al. Explaining cost overruns in infrastructure projects: a new framework with applications to Sweden , 2014 .
[8] James Odeck,et al. Cost overruns in road construction--what are their sizes and determinants? , 2004 .
[9] David Grau,et al. Predictability Index: Novel Metric to Assess Cost and Schedule Performance , 2015 .
[10] Mohammad Barzandeh. Accuracy of estimating techniques for predicting residential construction costs – A case study of an Auckland residential construction company , 2011 .
[11] Akintola Akintoye,et al. Analysis of factors influencing project cost estimating practice , 2000 .
[12] Edward J. Jaselskis,et al. Improving predictability of construction project outcomes through intentional management of indirect construction costs , 2014 .
[13] Guru Prakash Prabhakar,et al. Projects and Their Management: A Literature Review , 2009 .
[14] Geoffrey Qiping Shen,et al. Factors Affecting Schedule Delay, Cost Overrun, and Quality Level in Public Construction Projects , 2016 .
[15] Helena Ellingerová. Planning and Management of Construction Budgetary Costs , 2011 .
[16] B. Flyvbjerg,et al. Different Cost Performance: Different Determinants? The Case of Cost Overruns in Dutch Transport Infrastructure Projects , 2012, 1307.2179.
[17] Keith R. Molenaar,et al. Guidance for Cost Estimation and Management for Highway Projects During Planning, Programming, and Preconstruction , 2006 .