A test rig and numerical model for investigating truck mounted concrete pumps
暂无分享,去创建一个
Ferruccio Resta | Gabriele Cazzulani | Francesco Ripamonti | Hermes Giberti | C. Ghielmetti | F. Resta | H. Giberti | F. Ripamonti | G. Cazzulani | Christian Ghielmetti
[1] G. Offner,et al. Comparison of the Classical Formulation With the Reference Conditions Formulation for Dynamic Flexible Multibody Systems , 2007 .
[2] Ahmed A. Shabana,et al. Flexible Multibody Dynamics: Review of Past and Recent Developments , 1997 .
[3] Thierry Sedran,et al. Design of concrete pumping circuit , 2005 .
[4] Jürgen Kronenberg. Compact 'four-arm' with multiple strengths , 2007 .
[5] Siqi Zhang,et al. Co-simulation on Automatic Pouring of Truck-mounted Concrete Boom Pump , 2007 .
[6] Joel A. Levitt,et al. Physically Based Modeling of Reciprocating Lip Seal Friction , 2001 .
[7] Kun Liu,et al. Simulation control of concrete pump truck boom based on PSO and adaptive robust PD , 2009, 2009 Chinese Control and Decision Conference.
[8] Yehia A. Khulief,et al. VIBRATION SUPPRESSION IN USING ACTIVE MODAL CONTROL , 2001 .
[9] A. Shabana,et al. Equivalence of the floating frame of reference approach and finite element formulations , 1998 .
[10] Jürgen Kronenberg. First delivery of flexible, five-sectioned booms , 2005 .