Risk assessment of urban rooftop distributed PV in energy performance contracting (EPC) projects: An extended HFLTS-DEMATEL fuzzy synthetic evaluation analysis

Abstract Promoted by the policy, urban rooftop distributed photovoltaic (URDPV) has developed rapidly in China. Besides, the government is gradually applying energy performance contracting (EPC) mode to this field making use of urban rooftop resources and energy service companies’ (ECOs’) technological advantages, but there are still obstacles to further development. One of the main reasons that restrict the further development of EPC-URDPV projects in China is the lack of effective risk assessment method. This paper aims to identify the critical risk factors (CRFs) for such projects, and propose a comprehensive risk assessment framework. Firstly, 11 CRFs are identified based on the literature review and 4-dimensional risk analysis to composed the risk assessment index system. Secondly, the weights of CRFs are determined by the intuitionistic fuzzy-decision making trial and evaluation laboratory (IF-DEMATEL) method. It is worth noting that this paper uses the hesitant fuzzy linguistic term sets (HFLTS) to obtain evaluation information to ensure the completeness and fuzziness of experts’ viewpoints. Then, an extended HFLTS-DEMATEL fuzzy synthetic evaluation method is used to conduct risk assessment. The evaluation results show that the risk levels of EPC-URDPV projects in most study areas are at “Medium” and “Relatively Low” state. The risk level of projects in Shanghai and Fujian is “Relatively High”. Sensitivity analysis results show the stability and reliability of the model. After considering the causes of risk and relevant stakeholders, a risk response is proposed. This study can enrich the methods in the field of risk assessment and provide insightful references to PV investors, decision makers.

[1]  Sufang Zhang,et al.  Innovative business models and financing mechanisms for distributed solar PV (DSPV) deployment in China , 2016 .

[2]  Jing Wang,et al.  An extended TODIM-PROMETHEE method for waste-to-energy plant site selection based on sustainability perspective , 2018, Energy.

[3]  Jie Li,et al.  Assessing the Architectural Design Services by Using DEMATEL Approach , 2009, 2009 International Conference on Computational Intelligence and Natural Computing.

[4]  Pingkuo Liu,et al.  Applying the blockchain technology to promote the development of distributed photovoltaic in China , 2018 .

[5]  Robert Margolis,et al.  Analysis of distributed-generation photovoltaic deployment, installation time and cost, market barriers, and policies in China , 2015 .

[6]  Claudius Holdermann,et al.  Distributed photovoltaic generation in Brazil: An economic viability analysis of small-scale photovoltaic systems in the residential and commercial sectors , 2014 .

[7]  Francisco Herrera,et al.  Hesitant Fuzzy Linguistic Term Sets for Decision Making , 2012, IEEE Transactions on Fuzzy Systems.

[8]  Bon-Gang Hwang,et al.  A fuzzy synthetic evaluation approach for risk assessment: a case of Singapore's green projects , 2016 .

[9]  Francisco Herrera,et al.  A 2-tuple fuzzy linguistic representation model for computing with words , 2000, IEEE Trans. Fuzzy Syst..

[10]  Subash Pd. Rai,et al.  Risk assessment for transboundary rivers using fuzzy synthetic evaluation technique , 2014 .

[11]  Di Zhao,et al.  Distributed solar photovoltaics in China: Policies and economic performance , 2015 .

[12]  Peide Liu An approach to group decision making based on 2-dimension uncertain linguistic information , 2012 .

[13]  Saad Mekhilef,et al.  A review on solar energy use in industries , 2011 .

[14]  Guo-liang Luo,et al.  Financing risks involved in distributed PV power generation in China and analysis of countermeasures , 2016 .

[15]  M. Thring World Energy Outlook , 1977 .

[16]  S. Ebrahimnejad,et al.  A model for risk evaluation in construction projects based on fuzzy MADM , 2008, 2008 4th IEEE International Conference on Management of Innovation and Technology.

[17]  B. Hwang,et al.  Developing Fuzzy Enterprise Risk Management Maturity Model for Construction Firms , 2013 .

[18]  Xingyuan Wang,et al.  Evaluation of Clean Coal Technologies in China: Based on Rough Set Theory , 2015 .

[19]  Francisco Herrera,et al.  A Sequential Selection Process in Group Decision Making with a Linguistic Assessment Approach , 1995, Inf. Sci..

[20]  B. Hwang,et al.  Public private partnership projects in Singapore factors, critical risks and preferred risk allocation from the perspective of contractors / , 2013 .

[21]  Lotfi A. Zadeh,et al.  Fuzzy Sets , 1996, Inf. Control..

[22]  Zeshui Xu,et al.  Identifying and eliminating dominated alternatives in multi-attribute decision making with intuitionistic fuzzy information , 2012, Appl. Soft Comput..

[23]  Enrico Zio,et al.  Risk assessment and risk-cost optimization of distributed power generation systems considering extreme weather conditions , 2015, Reliab. Eng. Syst. Saf..

[24]  Gilberto De Martino Jannuzzi,et al.  Grid-connected photovoltaic in Brazil: Policies and potential impacts for 2030 , 2013 .

[25]  M. Dulaimi,et al.  Risk management framework for construction projects in developing countries , 2004 .

[26]  Alain Bernard,et al.  Group multi-criteria design concept evaluation using combined rough set theory and fuzzy set theory , 2016, Expert Syst. Appl..

[27]  Krassimir T. Atanassov,et al.  Intuitionistic fuzzy sets , 1986 .

[28]  P. Lee,et al.  Risks in Energy Performance Contracting (EPC) projects , 2015 .

[29]  Abdolvahhab Fetanat,et al.  A novel hybrid MCDM approach for offshore wind farm site selection: A case study of Iran , 2015 .

[30]  Zeshui Xu,et al.  Preference Relations Based on Intuitionistic Multiplicative Information , 2013, IEEE Transactions on Fuzzy Systems.

[31]  Benjamin K. Sovacool,et al.  Assessing the lifecycle greenhouse gas emissions from solar PV and wind energy: A critical meta-survey , 2014 .

[32]  Francis W.H. Yik,et al.  Probabilistic risk assessment of the energy saving shortfall in energy performance contracting projects–A case study , 2013, Energy and Buildings.

[33]  Matt Syal,et al.  RISK FRAMEWORK FOR ENERGY PERFORMANCE CONTRACTING BUILDING RETROFITS , 2016 .

[34]  Jingzheng Ren,et al.  Market dynamics, innovation, and transition in China's solar photovoltaic (PV) industry: A critical review , 2017 .

[35]  Yang Wang,et al.  A risk assessment framework of PPP waste-to-energy incineration projects in China under 2-dimension linguistic environment , 2018 .

[36]  Siamak Haji Yakhchali,et al.  Risk ranking of tunnel construction projects by using the ELECTRE technique under a fuzzy environment , 2013 .

[37]  Yong Hu,et al.  A TODIM-Based Investment Decision Framework for Commercial Distributed PV Projects under the Energy Performance Contracting (EPC) Business Model: A Case in East-Central China , 2018 .

[38]  Wei Peng,et al.  Assessing risk management capability of contractors in subway projects in mainland China , 2014 .

[39]  Yang Wang,et al.  Social sustainability assessment of small hydropower with hesitant PROMETHEE method , 2017 .

[40]  Lars Strupeit,et al.  Overcoming barriers to renewable energy diffusion: business models for customer-sited solar photovoltaics in Japan, Germany and the United States , 2016 .

[41]  Ronald R. Yager,et al.  An approach to ordinal decision making , 1995, Int. J. Approx. Reason..

[42]  V. Torra,et al.  A framework for linguistic logic programming , 2010 .

[43]  Xu Zhang,et al.  Risk Assessment and Empirical Analysis of Grid connected Distributed Photovoltaic Power , 2010, 2010 Asia-Pacific Power and Energy Engineering Conference.

[44]  Lin Li,et al.  Picture fuzzy normalized projection-based VIKOR method for the risk evaluation of construction project , 2018, Appl. Soft Comput..

[45]  Bo Xia,et al.  Measuring corruption in public construction projects in China , 2015 .

[46]  P. Lam,et al.  Cross-Sectional Analysis of Critical Risk Factors for PPP Water Projects in China , 2015 .

[47]  Zeshui Xu,et al.  Two new approaches based on ELECTRE II to solve the multiple criteria decision making problems with hesitant fuzzy linguistic term sets , 2018, Appl. Soft Comput..

[48]  Zeshui Xu,et al.  Distance and similarity measures for hesitant fuzzy linguistic term sets and their application in multi-criteria decision making , 2014, Inf. Sci..

[49]  Kasun Hewage,et al.  Sustainability assessment framework for small-sized urban neighbourhoods: An application of fuzzy synthetic evaluation , 2018 .

[50]  S. M. Seyed Hosseini,et al.  Reprioritization of failures in a system failure mode and effects analysis by decision making trial and evaluation laboratory technique , 2006, Reliab. Eng. Syst. Saf..

[51]  R. Madlener,et al.  AHP-based risk analysis of energy performance contracting projects in Russia , 2016 .

[52]  Wenyan Song,et al.  Sustainable site selection for photovoltaic power plant: An integrated approach based on prospect theory , 2018, Energy Conversion and Management.

[53]  Xin-gang Zhao,et al.  Policies and economic efficiency of China's distributed photovoltaic and energy storage industry , 2018, Energy.

[54]  Gwo-Hshiung Tzeng,et al.  A value-created system of science (technology) park by using DEMATEL , 2009, Expert Syst. Appl..

[55]  Zhou Enyi,et al.  Engineering Risk Management Planning in Energy Performance Contracting in China , 2011 .

[56]  Shuai Geng,et al.  Multi-criteria decision making on selection of solar–wind hybrid power station location: A case of China , 2014 .

[57]  Yuhan Wang,et al.  Risk analysis in ultra deep scientific drilling project — A fuzzy synthetic evaluation approach , 2013 .

[58]  Rehan Sadiq,et al.  Developing a level of service (LOS) index for operational management of public buildings , 2017 .

[59]  R. Rüther,et al.  Economic performance and policies for grid-connected residential solar photovoltaic systems in Brazil , 2012 .

[60]  Huayou Chen,et al.  Intuitionistic fuzzy geometric interaction averaging operators and their application to multi-criteria decision making , 2014, Inf. Sci..

[61]  Mohan M. Kumaraswamy,et al.  An evaluation of construction time performance in the building industry , 1996 .

[62]  Dan Ding,et al.  A synthetic method for knowledge management performance evaluation based on triangular fuzzy number and group support systems , 2016, Appl. Soft Comput..

[63]  Yunna Wu,et al.  Risk assessment in straw-based power generation public-private partnership projects in China: A fuzzy synthetic evaluation analysis , 2017 .