Multi-objective integrated production planning model and simulation constrained doubly by resources and materials

Based on analysing the defects of ERP planning system and researching related literatures, a multi objective integrated production planning model is constructed which is constrained double by resources and materials. The model tekes delivery on-tome, reduces inventory , reduces overtime work, meintains safety inventory as its optimization objectives, and can achieve the integrated optimization method provided by the model has strong feasibility and effectness.

[1]  John J. Kanet,et al.  Integrating production planning and control: towards a simple model for Capacitated ERP , 2010 .

[2]  Ling Ling Process planning optimization based on genetic algorithm and topological sort algorithm for digraph , 2009 .

[3]  Jia Wei Aggregate Production Planning with Multi-Objectives in Uncertain Environment , 2002 .

[4]  Rao Jun Generation and optimization of process routing based on ant colony algorithm , 2010 .

[5]  Guilherme Ernani Vieira,et al.  A new multi-objective optimization method for master production scheduling problems based on genetic algorithm , 2009 .

[6]  Chen Zhi-xiang Flexible decision of MPS in MRPII system , 2001 .

[7]  Herbert Jodlbauer,et al.  Material and capacity requirements planning with dynamic lead times , 2012 .

[8]  Lan Bo-xiong Enterprise Resource Optimization and Optimization Model , 2004 .

[9]  Cheng Wang,et al.  Integrated production planning and control: a multi-objective optimization model , 2013 .

[10]  Imen Chaieb Memmi,et al.  A new approach for solving capacitated lot sizing and scheduling problem with sequence and period-dependent setup costs , 2013 .

[11]  Leopoldo Eduardo Cárdenas-Barrón,et al.  Optimal Pricing and Production Master Planning in a Multiperiod Horizon Considering Capacity and Inventory Constraints , 2009 .

[12]  Wu Gong-yi Research on MRP of dynamic lot size & lead-time based on daily output , 2005 .

[13]  Peraphon Sophatsathit,et al.  An Organization-wide Analysis of ERP and Information Systems Interrelationship for Logistics Support , 2011, LISS.

[14]  Chen Jian-hua Integrated Production Planning and Controlling Model of MRPII, JIT and TOC in Time-based Competition , 2005 .

[15]  Zhuang Ya An Improved Capacity Requirements Planning Method for MRPII/ERP Systems , 2002 .

[16]  Xiao Yiyong Enterprise planning model based on bill of manufacturing , 2010 .