An integrated inventory problem with transportation in a divergent supply chain under service level constraint

Abstract This study investigates an integrated inventory problem with transportation in a single-vendor and multi-buyer divergent supply chain. The vendor manufactures a product and delivers the product to the buyers located in different locations by a fleet of vehicles of identical capacity. The external demands per unit time on the buyers are independent and normally distributed. The lead time components of the buyers, excluding transportation time, can be reduced at an added crash cost. A model has been formulated to minimize the total expected cost of the system associated with the production, inventory, transportation and lead time reduction to find the optimal production, inventory and routing decisions while satisfying the service level constraint of the buyers. We propose a coordinated two-phase iterative approach to solve the model, which has been illustrated through a numerical example.

[1]  C. Glock The joint economic lot size problem: A review , 2012 .

[2]  James J. Solberg,et al.  Operations Research: Principles and Practice. , 1977 .

[3]  Fei Ye,et al.  Cost allocation model for optimizing supply chain inventory with controllable lead time , 2010, Comput. Ind. Eng..

[4]  Patrick S. Chen,et al.  Improved inventory models with service level and lead time , 2005, Comput. Oper. Res..

[5]  Erhan Kutanoglu,et al.  Integrated inventory and transportation mode selection: A service parts logistics system , 2008 .

[6]  Jeff Hoi Yan Yeung,et al.  Supply chain coordination with controllable lead time and asymmetric information , 2012, Eur. J. Oper. Res..

[7]  Rakesh Nagi,et al.  A review of integrated analysis of production-distribution systems , 1999 .

[8]  M. Darwish,et al.  Production and shipment lot sizing in a vendor-buyer supply chain with transportation cost , 2007, Eur. J. Oper. Res..

[9]  G. Clarke,et al.  Scheduling of Vehicles from a Central Depot to a Number of Delivery Points , 1964 .

[10]  Fei Ye,et al.  Supply chain coordination model with controllable lead time and service level constraint , 2011, Comput. Ind. Eng..

[11]  A. Ruszczynski,et al.  On the integrated production, inventory, and distribution routing problem , 2006 .

[12]  Liang-Yuh Ouyang,et al.  Integrated vendor--buyer inventory system with sublot sampling inspection policy and controllable lead time , 2007, Int. J. Syst. Sci..

[13]  Suresh Kumar Goyal,et al.  An optimal policy for a single-vendor single-buyer integrated production–inventory system with capacity constraint of the transport equipment , 2000 .

[14]  R. J. Tersine Principles of inventory and materials management , 1982 .

[15]  L. Ouyang,et al.  Integrated vendor–buyer cooperative models with stochastic demand in controllable lead time , 2004 .

[16]  Joaquín Sicilia,et al.  Policies for a single-vendor multi-buyer system with finite production rate , 2008, Decis. Support Syst..

[17]  C. Liao,et al.  An Analytical Determination of Lead Time with Normal Demand , 1991 .

[18]  Liang-Yuh Ouyang,et al.  Mixture inventory model involving variable lead time with a service level constraint , 1997, Comput. Oper. Res..

[19]  James H. Bookbinder,et al.  An integrated inventory-transportation system with modified periodic policy for multiple products , 1999, Eur. J. Oper. Res..

[20]  Jason Chao-Hsien Pan,et al.  Just-in-time purchasing: an integrated inventory model involving deterministic variable lead time and quality improvement investment , 2004 .

[21]  Sarada Prasad Sarmah,et al.  Coordination of a single-manufacturer/multi-buyer supply chain with credit option , 2008 .

[22]  M. A. Hoque,et al.  Synchronization in the single-manufacturer multi-buyer integrated inventory supply chain , 2008, Eur. J. Oper. Res..

[23]  Chei-Chang Chiou,et al.  An exact policy for enhancing buyer–supplier linkage in supply chain system , 2008 .

[24]  Yu-Cheng Hsiao,et al.  Integrated logistic and inventory model for a two-stage supply chain controlled by the reorder and shipping points with sharing information , 2008 .

[25]  Ilkyeong Moon,et al.  The distribution free continuous review inventory system with a service level constraint , 1994 .

[26]  Jason Chao-Hsien Pan,et al.  A study of an integrated inventory with controllable lead time , 2002 .

[27]  Bhaba R. Sarker,et al.  An operational policy for an integrated inventory system under consignment stock policy with controllable lead time and buyers' space limitation , 2013, Comput. Oper. Res..

[28]  Kripa Shanker,et al.  Two-echelon supply chain inventory model with controllable lead time and service level constraint , 2009, Comput. Ind. Eng..

[29]  Kin Keung Lai,et al.  Integration of Inventory and Transportation Decisions in a Logistics System , 2010 .

[30]  R. Ibrahim,et al.  Joint economic lot size in distribution system with multiple shipment policy , 2006 .

[31]  Lu Lu A one-vendor multi-buyer integrated inventory model , 1995 .

[32]  Prafulla Joglekar,et al.  The Individually Responsible and Rational Decision Approach to Economic Lot Sizes for One Vendor and Many Purchasers , 1990 .

[33]  Guruprasad Pundoor,et al.  Joint cyclic production and delivery scheduling in a two-stage supply chain , 2009 .

[34]  A. Banerjee A JOINT ECONOMIC-LOT-SIZE MODEL FOR PURCHASER AND VENDOR , 1986 .

[35]  Suresh Kumar Goyal,et al.  An integrated inventory model for a single supplier-single customer problem , 1977 .

[36]  M. Darwish,et al.  The joint economic lot sizing problem: Review and extensions , 2008, Eur. J. Oper. Res..

[37]  Ming-Jong Yao,et al.  On a replenishment coordination model in an integrated supply chain with one vendor and multiple buyers , 2004, Eur. J. Oper. Res..

[38]  Mohammad A. Hoque,et al.  Generalized single-vendor multi-buyer integrated inventory supply chain models with a better synchronization , 2011 .