An integrated inventory problem with transportation in a divergent supply chain under service level constraint
暂无分享,去创建一个
[1] C. Glock. The joint economic lot size problem: A review , 2012 .
[2] James J. Solberg,et al. Operations Research: Principles and Practice. , 1977 .
[3] Fei Ye,et al. Cost allocation model for optimizing supply chain inventory with controllable lead time , 2010, Comput. Ind. Eng..
[4] Patrick S. Chen,et al. Improved inventory models with service level and lead time , 2005, Comput. Oper. Res..
[5] Erhan Kutanoglu,et al. Integrated inventory and transportation mode selection: A service parts logistics system , 2008 .
[6] Jeff Hoi Yan Yeung,et al. Supply chain coordination with controllable lead time and asymmetric information , 2012, Eur. J. Oper. Res..
[7] Rakesh Nagi,et al. A review of integrated analysis of production-distribution systems , 1999 .
[8] M. Darwish,et al. Production and shipment lot sizing in a vendor-buyer supply chain with transportation cost , 2007, Eur. J. Oper. Res..
[9] G. Clarke,et al. Scheduling of Vehicles from a Central Depot to a Number of Delivery Points , 1964 .
[10] Fei Ye,et al. Supply chain coordination model with controllable lead time and service level constraint , 2011, Comput. Ind. Eng..
[11] A. Ruszczynski,et al. On the integrated production, inventory, and distribution routing problem , 2006 .
[12] Liang-Yuh Ouyang,et al. Integrated vendor--buyer inventory system with sublot sampling inspection policy and controllable lead time , 2007, Int. J. Syst. Sci..
[13] Suresh Kumar Goyal,et al. An optimal policy for a single-vendor single-buyer integrated production–inventory system with capacity constraint of the transport equipment , 2000 .
[14] R. J. Tersine. Principles of inventory and materials management , 1982 .
[15] L. Ouyang,et al. Integrated vendor–buyer cooperative models with stochastic demand in controllable lead time , 2004 .
[16] Joaquín Sicilia,et al. Policies for a single-vendor multi-buyer system with finite production rate , 2008, Decis. Support Syst..
[17] C. Liao,et al. An Analytical Determination of Lead Time with Normal Demand , 1991 .
[18] Liang-Yuh Ouyang,et al. Mixture inventory model involving variable lead time with a service level constraint , 1997, Comput. Oper. Res..
[19] James H. Bookbinder,et al. An integrated inventory-transportation system with modified periodic policy for multiple products , 1999, Eur. J. Oper. Res..
[20] Jason Chao-Hsien Pan,et al. Just-in-time purchasing: an integrated inventory model involving deterministic variable lead time and quality improvement investment , 2004 .
[21] Sarada Prasad Sarmah,et al. Coordination of a single-manufacturer/multi-buyer supply chain with credit option , 2008 .
[22] M. A. Hoque,et al. Synchronization in the single-manufacturer multi-buyer integrated inventory supply chain , 2008, Eur. J. Oper. Res..
[23] Chei-Chang Chiou,et al. An exact policy for enhancing buyer–supplier linkage in supply chain system , 2008 .
[24] Yu-Cheng Hsiao,et al. Integrated logistic and inventory model for a two-stage supply chain controlled by the reorder and shipping points with sharing information , 2008 .
[25] Ilkyeong Moon,et al. The distribution free continuous review inventory system with a service level constraint , 1994 .
[26] Jason Chao-Hsien Pan,et al. A study of an integrated inventory with controllable lead time , 2002 .
[27] Bhaba R. Sarker,et al. An operational policy for an integrated inventory system under consignment stock policy with controllable lead time and buyers' space limitation , 2013, Comput. Oper. Res..
[28] Kripa Shanker,et al. Two-echelon supply chain inventory model with controllable lead time and service level constraint , 2009, Comput. Ind. Eng..
[29] Kin Keung Lai,et al. Integration of Inventory and Transportation Decisions in a Logistics System , 2010 .
[30] R. Ibrahim,et al. Joint economic lot size in distribution system with multiple shipment policy , 2006 .
[31] Lu Lu. A one-vendor multi-buyer integrated inventory model , 1995 .
[32] Prafulla Joglekar,et al. The Individually Responsible and Rational Decision Approach to Economic Lot Sizes for One Vendor and Many Purchasers , 1990 .
[33] Guruprasad Pundoor,et al. Joint cyclic production and delivery scheduling in a two-stage supply chain , 2009 .
[34] A. Banerjee. A JOINT ECONOMIC-LOT-SIZE MODEL FOR PURCHASER AND VENDOR , 1986 .
[35] Suresh Kumar Goyal,et al. An integrated inventory model for a single supplier-single customer problem , 1977 .
[36] M. Darwish,et al. The joint economic lot sizing problem: Review and extensions , 2008, Eur. J. Oper. Res..
[37] Ming-Jong Yao,et al. On a replenishment coordination model in an integrated supply chain with one vendor and multiple buyers , 2004, Eur. J. Oper. Res..
[38] Mohammad A. Hoque,et al. Generalized single-vendor multi-buyer integrated inventory supply chain models with a better synchronization , 2011 .