Research on Joint Impoundment Dispatching Model for Cascade Reservoir
暂无分享,去创建一个
[1] LI Yi-tian. Study on the impounding time and objective decision of the Three Gorges Project at the end of flood period , 2003 .
[2] Yinghai Li,et al. Dynamic Application and Risk Analysis of Flood Control Water Level to the Three Gorges Reservoir by Utilizing Mid-Term Inflow Forecasts , 2010, 2010 Asia-Pacific Power and Energy Engineering Conference.
[3] Yu Li,et al. Joint Operation and Dynamic Control of Flood Limiting Water Levels for Cascade Reservoirs , 2013, Water Resources Management.
[4] Pan Liu,et al. Dynamic control of flood limited water level for reservoir operation by considering inflow uncertainty , 2010 .
[5] J. Yazdi,et al. Optimal design of flood-control multi-reservoir system on a watershed scale , 2012, Natural Hazards.
[6] Pan Liu,et al. Deriving Optimal Refill Rules for Multi-Purpose Reservoir Operation , 2011 .
[7] Reza Tavakkoli-Moghaddam,et al. A novel hybrid approach combining electromagnetism-like method with Solis and Wets local search for continuous optimization problems , 2009, J. Glob. Optim..
[8] Dilini Delgoda,et al. Multiple Model Predictive Flood Control in Regulated River Systems with Uncertain Inflows , 2013, Water Resources Management.
[9] C.-H. Kao,et al. Multi-objective inventory control using electromagnetism-like meta-heuristic , 2008 .
[10] V. Singh,et al. Multiple duration limited water level and dynamic limited water level for flood control, with implications on water supply , 2008 .
[11] Sharad K. Jain,et al. Optimal Operation of a Multi-Purpose Reservoir Using Neuro-Fuzzy Technique , 2009 .
[12] P Me. A METHOD OF COMPENSATED REGULATION CALCULATION FOR A GROUP OF HYDROPOWER STATIONS—IMPROVED CRITERION FOR MULA METHOD , 1991 .
[13] Yong Peng,et al. Risk analysis of dynamic control of reservoir limited water level by considering flood forecast error , 2011 .
[14] Mukand S. Babel,et al. A Model for Optimal Allocation of Water to Competing Demands , 2005 .
[15] J. Windsor. Optimization model for the operation of flood control systems , 1973 .
[16] Deng Jin-yun. Preliminary study on impounding water of Three Gorges Project in September , 2006 .
[17] Pan Liu,et al. Flood season segmentation based on the probability change-point analysis technique , 2010 .
[18] Shu-Cherng Fang,et al. An Electromagnetism-like Mechanism for Global Optimization , 2003, J. Glob. Optim..
[19] Hao Wang,et al. Multi-Objective Parameter Calibration and Multi-Attribute Decision-Making: An Application to Conceptual Hydrological Model Calibration , 2014, Water Resources Management.