Simulation on Rationalization Process Scheduling in Large-Scale Civil Engineering

In the construction process of large-scale civil engineering and architecture, how to realize rational scheduling is a key problem need to be solved. This paper studies the construction process of the large-scale Civil Engineering decoration companies, particularly the construction with parallel multiple sets of team and multi-project. To solve the problem, the paper designs a special scheduling algorithm and carries out simulation. The scheduling algorithm shorts the duration of construction and improves enterprise efficiency.

[1]  Henri Casanova,et al.  Clustering hosts in P2P and global computing platforms , 2003, CCGrid 2003. 3rd IEEE/ACM International Symposium on Cluster Computing and the Grid, 2003. Proceedings..

[2]  Manoj Kumar Tiwari,et al.  Modeling machine loading problem of FMSs and its solution methodology using a hybrid tabu search and , 2004 .

[3]  Chenyang Lu,et al.  Feedback utilization control in distributed real-time systems with end-to-end tasks , 2005, IEEE Transactions on Parallel and Distributed Systems.

[4]  Cheng Wu,et al.  A simulated annealing algorithm based on bottleneck jobs for the open shop scheduling problem , 2008, 2008 7th World Congress on Intelligent Control and Automation.