Contractor Selection Model for Highway Projects Using Integrated Simulation and Analytic Network Process

AbstractSelecting the appropriate contractor is a significant step to highway project success. The process of selection is subjected to uncertainty and influence of criteria other than bid price. This paper presents an approach to prioritize competitive contractors at the prebidding stage for highway projects by utilizing the analytic network process (ANP) and Monte Carlo simulation. Both techniques are integrated on a single platform to build the proposed model. Initially, the main quantitative and qualitative criteria affecting the contractors’ selection process are identified and studied. The effective criteria in the selection process were obtained from experts and literature. A structured questionnaire was designed and sent to experts in highway projects. The ANP was used to prioritize these criteria subsequently, and Monte Carlo simulation was utilized to develop the selection model. The applicability of the proposed model was tested using four real cases of highway projects. It was concluded that u...

[1]  Miroslaw J. Skibniewski,et al.  Qualifier-2: Knowledge-Based System for Contractor Prequalification , 1990 .

[2]  Gary David Holt,et al.  A review of contractor selection practice in the U.K. construction industry , 1995 .

[3]  Michael Riley,et al.  A multi‐criteria approach to contractor selection , 2002 .

[4]  Joeseph Sarkis,et al.  A methodological framework for evaluating environmentally conscious manufacturing programs , 1999 .

[5]  Nureize Arbaiy,et al.  Multi-Attribute Decision Making in Contractor Selection Under Hybrid Uncertainty , 2011, J. Adv. Comput. Intell. Intell. Informatics.

[6]  Martin Skitmore,et al.  Contractor selection using multi criteria utility theory: an additive mode , 1998 .

[7]  R. Edward Minchin,et al.  Quality-Based Contractor Rating Model for Qualification and Bidding Purposes , 2005 .

[8]  Tarek Zayed,et al.  Rational Best-Value Model Based on Expected Performance , 2008 .

[9]  Heng Li,et al.  Contractor selection using the analytic network process , 2004 .

[10]  Tarek Zayed,et al.  Best-Value Model Based on Project Specific Characteristics , 2008 .

[11]  Martin Skitmore,et al.  Criteria for contractor selection , 1997 .

[12]  Thomas L. Saaty,et al.  How to Make a Decision: The Analytic Hierarchy Process , 1990 .

[13]  Edmundas Kazimieras Zavadskas,et al.  Contractor selection of construction in a competitive environment , 2008 .

[14]  Robert L. K. Tiong,et al.  Contractor Selection Criteria: Investigation of Opinions of Singapore Construction Practitioners , 2006 .

[15]  Alfredo del Caño,et al.  Contractor selection: fuzzy-control approach , 2008 .

[16]  Thomas L. Saaty,et al.  Decision making with dependence and feedback : the analytic network process : the organization and prioritization of complexity , 1996 .

[17]  Patrick S. W. Fong,et al.  Final contractor selection using the analytical hierarchy process , 2000 .

[18]  Yawei Li,et al.  Fuzzy Approach to Prequalifying Construction Contractors , 2007 .

[19]  Tarek Zayed,et al.  Condition Rating Model for Underground Infrastructure Sustainable Water Mains , 2006 .

[20]  A Merna,et al.  BID EVALUATION FOR UK PUBLIC SECTOR CONSTRUCTION CONTRACTS. , 1990 .

[21]  Tarek Zayed,et al.  Infrastructure Management : Integrated AHP/ANN Model to Evaluate Municipal Water Mains' Performance , 2008 .

[22]  Irem Dikmen,et al.  Improving sub-contractor selection process in construction projects: Web-based sub-contractor evaluation system (WEBSES) , 2008 .

[23]  Wei Lo,et al.  Evaluating Qualification-Based Selection System: A Simulation Approach , 2009 .

[24]  Jeffrey S. Russell,et al.  QUALIFIER-1: CONTRACTOR PREQUALIFICATION MODEL , 1990 .

[25]  Awad S. Hanna,et al.  Monte Carlo Simulation Approach to Support Alliance Team Selection , 2009 .

[26]  Vito Albino,et al.  A neural network application to subcontractor rating in construction firms , 1998 .

[27]  Y. Ilker Topcu,et al.  A decision model proposal for construction contractor selection in Turkey , 2004 .

[28]  Gary David Holt,et al.  Evaluating prequalification criteria in contractor selection , 1994 .

[29]  Donn E. Hancher,et al.  Quality-Based Prequalification of Contractors , 2002 .

[30]  Luis F. Alarcón,et al.  PERFORMANCE MODELING FOR CONTRACTOR SELECTION , 2002 .

[31]  Robert L. K. Tiong,et al.  A Fuzzy Decision Framework for Contractor Selection , 2005 .