A MULTIPLE SINGLE-PASS HEURISTIC ALGORITHM FOR THE STOCHASTIC ASSEMBLY LINE REBALANCING PROBLEM

Assembly line re-balancing is a problem frequently tackled by companies, as continuous changes in product features and volume demand caused by the volatility of today’s markets produce assembly tasks redefinition and line cycle time fluctuations. Hence, managers have to adapt the balancing of their lines to accomplish with the new conditions, while trying to keep to a bare minimum increases in completion costs and in costs related to changes in tasks assignment. In particular, modifications in line balancing impact on operators training, equipment switching and moving, along with quality assurance. The stochastic assembly line re-balancing problem basically consists in a multi-objective problem where two objectives, total expected completion cost of the new line and similarity between the new and the existing line, have to be jointly optimized. In this paper, a multiple single-pass heuristic algorithm is consequently developed with the aim to find the most complete set of dominant solutions representing the Pareto front of the problem. Multiple single-pass procedures iterate the execution of single-pass algorithms, in order to generate a set of solutions, rather than to create a unique purpose. Given such a set, the best-performing solutions, in accordance with the multi-objective nature of the problem, are presented to the line designer, who selects the final assembly line balancing considering also additive factors that can be hardly inserted in a mathematical approach (i.e. simplicity of learning re-assigned tasks, time requested for the re-allocation of tools necessary for executing re-assigned tasks, experience requested for maintenance of tools necessary for executing re-assigned tasks). By means of a wide experimentation including comparisons with a multiobjective genetic algorithm, the behaviour of the proposed methodology is set and optimized.

[1]  A. L. Arcus,et al.  COMSOAL: a computer method of sequencing operations for assembly lines , 1965 .

[2]  Fred M. Tonge Assembly Line Balancing Using Probabilistic Combinations of Heuristics , 1965 .

[3]  Hon-Shiang Lau,et al.  A Cost-Oriented Approach to Stochastic Line Balancing1 , 1973 .

[4]  Hon-Shiang Lau,et al.  A Total Operating Cost Model for Paced Lines with Stochastic Task Times , 1976 .

[5]  Peter A. Pinto,et al.  A heuristic network procedure for the assembly line balancing problem , 1978 .

[6]  Geoff Buxey Incompletion costs versus labour efficiency on the fixed-item moving belt flowline , 1978 .

[7]  Norman A. Schofield,et al.  Assembly line balancing and the application of computer techniques , 1980 .

[8]  John F. Kottas,et al.  A stochastic line balancing procedure , 1981 .

[9]  Hirokazu Osaki,et al.  A method for assembly line balancing with more than one worker in each station , 1983 .

[10]  Ilker Baybars,et al.  A survey of exact algorithms for the simple assembly line balancing , 1986 .

[11]  William V. Gehrlein,et al.  A comparative evaluation of heuristic line balancing techniques , 1986 .

[12]  Soumen Ghosh,et al.  A comprehensive literature review and analysis of the design, balancing and scheduling of assembly systems , 1989 .

[13]  Subhash C. Sarin,et al.  Development of cost model for the single-model stochastic assembly line balancing problem , 1990 .

[14]  Michael C. Ferris,et al.  Genetic Algorithms for Combinatorial Optimization: The Assemble Line Balancing Problem , 1994, INFORMS J. Comput..

[15]  Loren Paul Rees,et al.  Assembly Line Balancing Using Genetic Algorithms with Heuristic‐Generated Initial Populations and Multiple Evaluation Criteria* , 1994 .

[16]  Gregory Levitin,et al.  Genetic algorithm for assembly line balancing , 1995 .

[17]  Armin Scholl,et al.  Balancing and Sequencing of Assembly Lines , 1995 .

[18]  Yeongho Kim,et al.  Genetic algorithms for assembly line balancing with various objectives , 1996 .

[19]  V. V. Vinod,et al.  A genetic algorithm for assembly line balancing , 1996 .

[20]  H. Ishibuchi,et al.  Multi-objective genetic algorithm and its applications to flowshop scheduling , 1996 .

[21]  Yeo Keun Kim,et al.  A heuristic-based genetic algorithm for workload smoothing in assembly lines , 1998, Comput. Oper. Res..

[22]  Hisao Ishibuchi,et al.  A multi-objective genetic local search algorithm and its application to flowshop scheduling , 1998, IEEE Trans. Syst. Man Cybern. Part C.

[23]  Subhash C. Sarin,et al.  A survey of the assembly line balancing procedures , 1998 .

[24]  Roger L. Wainwright,et al.  Applying genetic algorithms to the U-shaped assembly line balancing problem , 1998, 1998 IEEE International Conference on Evolutionary Computation Proceedings. IEEE World Congress on Computational Intelligence (Cat. No.98TH8360).

[25]  Subhash C. Sarin,et al.  A methodology for solving single-model, stochastic assembly line balancing problem , 1999 .

[26]  Matthias Amen,et al.  Heuristic methods for cost-oriented assembly line balancing: A survey , 2000 .

[27]  Ihsan Sabuncuoglu,et al.  Assembly line balancing using genetic algorithms , 2000, J. Intell. Manuf..

[28]  S. G. Ponnambalam,et al.  A Multi-Objective Genetic Algorithm for Solving Assembly Line Balancing Problem , 2000 .

[29]  Matthias Amen,et al.  Heuristic methods for cost-oriented assembly line balancing: a comparison on solution quality and computing time , 2001 .

[30]  Brahim Rekiek,et al.  A multiple objective grouping genetic algorithm for assembly line design , 2001, J. Intell. Manuf..

[31]  Carlos A. Brizuela,et al.  Application of the partial enumeration selection method in genetic algorithms to solving a multi-objective flowshop problem , 2001, 2001 IEEE International Conference on Systems, Man and Cybernetics. e-Systems and e-Man for Cybernetics in Cyberspace (Cat.No.01CH37236).

[32]  A. Delchambre,et al.  Hybrid assembly line design and user's preferences , 2002 .

[33]  José Fernando Gonçalves,et al.  A Hybrid Genetic Algorithm for Assembly Line Balancing , 2002, J. Heuristics.

[34]  Henri Pierreval,et al.  Evolutionary approaches to the design and organization of manufacturing systems , 2003 .

[35]  Rita Gamberini,et al.  A new multi-objective heuristic algorithm for solving the stochastic assembly line re-balancing problem , 2006 .

[36]  Nils Boysen,et al.  A classification of assembly line balancing problems , 2007, Eur. J. Oper. Res..