Measurement of the Current Distribution Between Multiple Brush Armatures During Launch
暂无分享,去创建一个
[1] M. Schneider,et al. Sliding contact performance of multiple brush armatures , 2004, IEEE Transactions on Magnetics.
[2] D. Eckenfels,et al. Experiments with brush armatures: new technical solutions , 2004, 2004 12th Symposium on Electromagnetic Launch Technology.
[3] P. Lehmann,et al. First measurements of current distribution in moving fiber-armatures in railguns , 1999 .
[4] Transition in brush armatures , 2003 .
[5] M. Schneider,et al. Advanced Rail-Sabot Configurations for Brush Armatures , 2007, IEEE Transactions on Magnetics.
[6] F. Stefani,et al. Crack tip behavior under pulsed electromagnetic loading , 2001, IEEE Transactions on Magnetics.
[7] D. Rodger,et al. A comparison of formulations for 3D finite element modeling of electromagnetic launchers , 2001 .
[8] J. P. Barber,et al. Model of contact transitioning with "realistic" armature-rail interface , 1995 .
[9] Paul B. Parks. Current melt‐wave model for transitioning solid armature , 1990 .
[10] F. Stefani,et al. The effect of current and speed on perimeter erosion in recovered armatures , 2005, IEEE Transactions on Magnetics.