Managing Target Cash Balance in Construction Firms Using Novel Fuzzy Regression Approach
暂无分享,去创建一个
[1] R. Navon,et al. Company-Level Cash-Flow Management , 1996 .
[2] Ruoning Xu. S-curve regression model in fuzzy environment , 1997, Fuzzy Sets Syst..
[3] Romie Tribble. A Restatement of the S-Curve Hypothesis , 1999 .
[4] Robert L. K. Tiong,et al. Model on cash flow forecasting and risk analysis for contracting firms , 2002 .
[5] Z. Miskawi,et al. An S-curve equation for project control , 1989 .
[6] Georg Peters. Fuzzy linear regression with fuzzy intervals , 1994 .
[7] R. Enz,et al. The S-Curve Relation Between Per-Capita Income and Insurance Penetration , 2000 .
[8] Kazuo Tanaka,et al. An approach to fuzzy control of nonlinear systems: stability and design issues , 1996, IEEE Trans. Fuzzy Syst..
[9] Michio Sugeno,et al. Fuzzy identification of systems and its applications to modeling and control , 1985, IEEE Transactions on Systems, Man, and Cybernetics.
[10] Miin-Shen Yang,et al. Fuzzy least-squares linear regression analysis for fuzzy input-output data , 2002, Fuzzy Sets Syst..
[11] Cheng-Wu Chen,et al. Stability conditions of fuzzy systems and its application to structural and mechanical systems , 2006, Adv. Eng. Softw..
[12] Wen-June Wang,et al. Entropy variation on the fuzzy numbers with arithmetic operations , 1999, Fuzzy Sets Syst..
[13] TING-YA HSIEH,et al. A New Viewpoint of S-curve Regression Model and its Application to Construction Management , 2006, Int. J. Artif. Intell. Tools.